04 - 1 NASA’s Goddard Space Flight Center LRO SRR Project Management.

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
Copyright © 2013 United Launch Alliance, LLC. Unpublished Work. All Rights Reserved. Civil Space 2013 Critical Challenges: Safety, Mission Assurance, and.
JPL’s Approach for Helping Flight Project Managers Meet Today’s Management Challenges Charles J. Leising Space Telescope Science Institute Technical Colloquium.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Stennis Space Center March 2013 Amy Rice. The Food.
The Project Management Body of Knowledge (PMBOK)
Project Management and Scheduling
The program work breakdown structure (WBS) establishes the essential
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Project Management Process Overview
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
1 Reconfigurable Environment For Analysis and Test of Software Systems (REATSS) Dan McCaugherty /19/2004.
Expendable Launch Vehicle Payload Safety Program Cal Staubus.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t D e s i g n L a b o r.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Life Cycle.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Manager Core Competencies The core competency.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
1 Lunar Reconnaissance Orbiter (LRO) Overview CRaTER PDR 6/27/2005 Craig Tooley.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Constellation Space Transportation Planning Office July 30, 2009.
NASA Update NDIA PMSC Quarterly Meeting August 26, 2010 NDIA PMSC Quarterly Meeting August 26, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis.
1 Technology Infusion of the Software Developer’s Assistant (SDA) into the MOD Software Development Process NASA/JSC/MOD/Brian O’Hagan 2008 Software Assurance.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
The Project Plan Plan Your Work, then Work Your Plan
Project Management Processes for a Project
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Camera PDR/CD1 Planning 19 September 2008
Introduction to Project Management
Copyright All Rights Reserved by
Instrument Preliminary Design Review (I-PDR) September 28th, 2005
TEMPO’s Commercially Hosted Payload Concept
Systems Engineering Management
CIS12-3 IT Project Management
Instrument PDR Summary of Objectives
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Presentation transcript:

NASA’s Goddard Space Flight Center LRO SRR Project Management

NASA’s Goddard Space Flight Center LRO Project Organization Current LRO GSFC Manpower Summary XX Civil Servants XX Support Service Contractors

NASA’s Goddard Space Flight Center LRO WBS

NASA’s Goddard Space Flight Center LRO Project Procedures & Guidelines Flow Down NASA Procedural Requirements Including NPR NASA Program and Project Management Processes and Requirements GSFC Procedural Requirements and Technical Rules Including GPR NASA Program and Project Management Processes and Requirements RLEP Program Plan 430-PLAN Goddard Directive Management System NASA On-Line Directive Information System LRO Requirements ESMD-RQMT-0010 LRO Systems Engineering Management Plan 431-PLAN LRO Mission Verification Plan 431-PLAN RLEP Mission Assurance Requirements 430-RQMT LRO Configuration Management Plan 431-PLAN-xxxxxx RLEP Continuous Risk Management Plan 430-PLAN LRO Integrated Independent Review Plan 431-PLAN LRO Mission Requirements Document 431-RQMT LRO Work Breakdown Structure& Dictionary 431-WBS LRO Project Plan 431-PLAN LRO Safety Plan 431-PLAN-xxxxxx LRO Reliability Plan 431-PLAN-xxxxxx LRO Instrument & Subsystem Performance Assurance Implementation Plans (7) LRO Risk Management Implementation Plan 431-PLAN-xxxxxx LRO Integration & Test Plan 431-PLAN-xxxxxx Sibling Mission Level 2 Requirements Documents (13) Status Key Released In CCB Baseline Review Draft in Development Review Instrument Contracts & In-House System Implementation Plans

NASA’s Goddard Space Flight Center LRO Project Control & Reporting Monthly Cycle Instrument Monthly Reporting Contract 533 Reports – Cost Plan, Act & Var. Schedule Status Cost & Workforce variance Analysis Budget Reserve Liens/Encumbrances Technical Progress& Problems Technical Resource margins Top Risks and Ranking Spacecraft Subsystems & Ground System Monthly Reporting SSC 533 Reports – Cost Plan, Act & Var. H/W Procurement Cost & Performance Schedule Status Cost & Workforce Variance Analysis Budget Reserve Liens/Encumbrances Requested Technical Progress& Problems Risks Reported thru Systems Meetings Project Analysis & Synthesis Cost Variance & Analysis Work Force variance & Analysis Performance Milestone Status Reserve Status Schedule Slack Technical Resource margins Risk Identification & Ranking Mission Systems Technical Risk Review, Analysis, & Tracking Technical Resource Margins Integration & Test plan/schedule Technical Progress & Problems Report RLEP Pre-MSR (400) MSR/QSR (GSFC PMC w/ESMD Attend) LRO generates legacy GSFC reporting products At Phase C Project level EVM products will be added.

NASA’s Goddard Space Flight Center Project Risk Reporting Technical Performance Risks Project Control & Implementation Risks Trade-off Safety Risks System Safety, Payload Safety, & Launch Site Safety Industrial Safety, Ground Safety, Facility Safety, & OSHA Hazard Analysis – PHA, SHA, & OSHA Mission Assurance Assessment/Risk Assessment – Matrix, FTA, & PRA (as needed) Residual Risks and Ranking Unresolved Safety Risks Risk Management Board Performance/Design Requirements Mission Success Assessments/Reliability & Risk Assessment Technical Performance Margins & Variance Technical Risk Review, Analysis, & Tracking Residual Risks and Ranking Unresolved Technical & Operations Risks Constraints Cost Plan, Act & Var. Cost & Workforce Variance Analysis Integration & Test Progress & Problems Budget Reserve Liens/Encumbrances Requested Residual Risks and Ranking Unresolved Programmatic Risks Risks Reported thru Systems Meetings LRO Project Risk Management Flow

NASA’s Goddard Space Flight Center LRO Risk Management Tracking, Ranking, & Reporting Example LRO Risk # LROP-22 (in database) as reported 6/30/05 LRO Manages Risk Continuously RM Board is comprised of core systems team and senior project management. Meets monthly. Process is guided by Risk Management Coordinator on Project Staff. Identification of Risks accomplished by both grassroots risk identification at instrument/subsystem level and top down by management/systems identification of mission risks. Specialized techniques applied by systems team for reliability and safety assessments.  Both reliability engineer and safety engineer are part of systems team. LRO will develop PRAs for critical mission events Example

NASA’s Goddard Space Flight Center LRO Lifecycle Cost Estimate Development LRO LCC estimate is in process. Initial Guiding Boundary Conditions 2008 launch Delta II class LV Accommodate Investigations sought by ORDT/AO $400M cost target put forth in FAD Conceptual Cost Estimates Parametric estimate based on historical data for recent mission with similarities Application of simple CERs by Project Initial Grassroots Estimates Done at subsystem level - Subsystem estimates experience based - Instruments per AO LCC estimate for Confirmation Process Results from reconciliation of Grassroots & RAO estimates. Reviewed by GSFC PMC Refined Grassroots Estimates Done at subsystem level - Subsystem estimates prelim. design based - Instruments per proposals, C/D/E contracts In Progress GSFC RAO Cost Modeling Mission input data defined/delivered by Project In Progress POP 04-1 (FY06) POP 05-1 (FY07)