Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June 25 - 27, 2008 Nuclear.

Slides:



Advertisements
Similar presentations
CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
Advertisements

Auditing, Assurance and Governance in Local Government
1 Extension of Construction Authorization for the Mixed Oxide Fuel Fabrication Facility David Tiktinsky Senior Project Manager Division of Fuel Cycle Safety,
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
NRC LICENSE APPLICATION PROCESS
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Combined licensing approach Vienna, 2-7 December 2012 Tea Bilic Zabric.
NHPA, Section 106, and NEPA Highlights and Misconceptions.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Draft RMP/EIS. Objectives Write a draft land use plan and EIS. Issue a draft land use plan and EIS for public review.
Protection Against Occupational Exposure
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
Kiggavik Project Final Hearing Presentation
COMPLIANCE WITH SUNSHINE LAW. Sunshine Law The Sunshine Law is established by Article I, Section 24 of the Florida State Constitution and Chapter 286,
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
ACADs (08-006) Covered Keywords Commission, regulation, advisory, standards. Description This presentation provides general information about each of the.
U.S Regulatory Process for Uranium Production Facility Licensing and Operation Daniel M. Gillen.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
NE 127 – Codes, Standards, and Regulations Power Industry Regulations INSTRUCTOR: Chattanooga State CC.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
13 th Nuclear Utility Meteorological Data Users Group Meeting Lessons Learned From Establishing Design- and Operating-Basis Regional Meteorological Conditions.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
U.S. Nuclear Regulatory Commission: Proposed Tribal Policy Statement National Tribal Air Association February 26, 2015 Michelle Ryan, Intergovernmental.
Strengthening Science Supporting Fishery Management  Standards for Best Available Science  Implementation of OMB’s Peer Review Bulletin  Separation.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Part 190 NPRM: Administrative Procedures - 1 -
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Regulatory Framework for Uranium Production Facilities in the U.S.
1 CDBG and Environmental Review For Local Officials.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Welcome to the Public Comment Hearing on the Proposed Regulatory Update to the California Environmental Quality Act AB 52, Gatto (2014) Heather Baugh Assistant.
PHILIPPINES Report: Policies and implementation strategies on HUMAN RESOURCE DEVELOPMENT to introduce NPPs Adopting RAIS 3.2 AS THE NATIONAL REGISTER OF.
Egyptian Nuclear and Radiological Regulatory Authority (ENRRA)
Waste Confidence/Continued Storage – Status Update
Dispute Resolution Between ICT Service Providers in Saudi Arabia
NRC Update of Low Level Waste Emerging Issues
NRC’s Category 3 Source Security and Accountability Initiatives
South Carolina Perspective on Part 61 Proposed Revisions
Office of Nuclear Material Safety and Safeguards (NMSS)
NRC’s Decision Process: Judging The Safety Of A Proposed Repository
Ensuring Nuclear Safety Culture in Ghana: Regulatory Perspective
NRC’s LLW Regulatory Program: Update of Emerging Issues
Updating the NRC’s Alternative Disposal Request Guidance Document
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Joseph D. Anderson, Chief
The Rulemaking Process
Overview of NRC Low-Level Waste Activities and Initiatives
Communication and Consultation with Interested Parties by the RB
Research and Test Reactor Safety: The Regulatory Perspective
Adding Nuclear Power to the Grid
NE 127 – Codes, Standards, and Regulations Power Industry Regulations
NRC Panel Discussion on Part 61 Proposed Rule. June 25, Perry D
Chapter 6 Powers and Functions of Administrative Agencies.
License Amendments Patrick Boyle Nuclear Engineer
Presentation transcript:

Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear Utilities Meteorological Data Users Group (NUMUG)

Combined License Review Process  Acceptance Review  Safety Review (10 CFR Part 52) ـ6 Phases  Environmental Review (10 CFR Part 51) ـ4 Phases  Atomic Safety and Licensing Board (ASLB) Hearing  Commission License Decision

Safety Evaluation Report Final EIS Commission Decision Safety Review Environmental Review ACRS Meeting Acceptance Review Hearing Notice (FRN) ACRS Report ASLB Hearing COLA Scoping Activities Draft EIS Comments on Draft Opportunities for Public Participation Publicly Available Documents Combined License Review Process ACRONYMS FRN – Federal Register Notice ASLB – Atomic Safety and Licensing Board ACRS – Advisory Committee on Reactor Safeguards EIS – Environmental Impact Statement

Acceptance Review The regulations in 10 CFR Part 2 prescribe the requirements for determining the acceptability of an application. technical sufficiency completeness In accordance with 10 CFR 2.101(a) or Section 2.815, the NRC may determine, at its discretion, the acceptability for docketing of an application based on the technical sufficiency of the application as well as the completeness of the application. Meteorology Guidance Documents: ● NRC Regulatory Guide 1.206, Sections through ● NRC NUREG-0800, Sections through 2.3.5

Environmental Review NEPA: National Environmental Policy Act ER: Environmental Report EIS: Environmental Impact Statement

Phase 1 Phase 1: Preliminary Safety Evaluation Report (PSER) and Requests for Additional Information (RAIs) Safety Review The Safety Evaluation Report (SER) documents the technical review of the Safety Analysis Report (SAR) by the U.S. Nuclear Regulatory Commission (NRC) staff. The NRC staff must be able to support the conclusions presented in NUREG-0800, Sections through Requests for Additional Information (RAIs) are a tool to help the NRC staff reach the conclusions presented in the SER. Technical Reviewer Technical Editor and Licensing Assistant Office of General Counsel NRC Project Manager COL Applicant Branch Chief NRC Project Manager RAI PROCESS

Safety Review Regional Climatology NRC Staff Conclusions  The staff finds that the applicant has established the meteorological characteristics at the site and in the surrounding area acceptable to meet the requirements of 10 CFR (c)(2) and (d) with respect to determining the acceptability of the site.  The staff finds that the applicant has considered the most severe natural phenomena historically reported for the site and surrounding area in establishing the design bases for SSCs important to safety.  The staff has determined that the applicant has considered these historical phenomena with margin sufficient for the limited accuracy, quantity, and period of time in which the data have been accumulated. * Note, this information was taken from NUREG and is not meant to be an all inclusive list

Safety Review Local Meteorology NRC Staff Conclusions  The staff finds that the applicant has identified and considered the meteorological, air quality, and topographical characteristics of the site and the surrounding area are acceptable and meet the requirements of 10 CFR (c) and 10 CFR (d) with respect to determining the acceptability of the site.  The staff has determined that the use of these methodologies results in design basis containing margin sufficient for the limited accuracy, quantity, and period of time in which the data have been accumulated. * Note, this information was taken from NUREG and is not meant to be an all inclusive list

Safety Review Onsite Meteorological Monitoring NRC Staff Conclusions  The staff finds the applicant has established consideration of the onsite meteorological monitoring program and the resulting database are acceptable and meet the requirements of 10 CFR and 10 CFR with respect to determining the acceptability of the site.  The staff finds that the onsite data provide an acceptable basis for making estimates of atmospheric dispersion for design basis accident and routine releases. * Note, this information was taken from NUREG and is not meant to be an all inclusive list

Safety Review Short-Term Accident Dispersion NRC Staff Conclusions  The staff concludes that the applicant’s atmospheric dispersion estimates are acceptable and meet the relevant requirements of 10 CFR (c)(2).  The staff concludes that the atmospheric dispersion estimates are appropriate for the assessment of consequences from (1) radioactive releases for design basis accidents and (2) onsite and offsite releases of radiological and hazardous materials. * Note, this information was taken from NUREG and is not meant to be an all inclusive list

Safety Review Long-Term Routine Dispersion NRC Staff Conclusions  The staff concludes that representative atmospheric dispersion and deposition factors have been calculated for 16 radial sectors from the site boundary to a distance of 50 miles (80 kilometers) as well as for specific locations of potential receptors of interest. * Note, this information was taken from NUREG and is not meant to be an all inclusive list

Safety Review Phase 2 Phase 2: Safety Evaluation Report (SER) with Open Items (OIs) Unresolved RAIs become Open Items (OIs). All OIs will need to be “closed” before any application licensing decision.

Safety Review Phase 3 Phase 3: Advisory Committee on Reactor Safeguards (ACRS) Reviews SER with OIs The Advisory Committee on Reactor Safeguards (ACRS) is statutorily mandated by the Atomic Energy Act of 1954, as amended. The Committee has three primary purposes: 1. To review and report on safety studies and reactor facility license and license renewal applications 2. To advise the Commission on the hazards of proposed and existing reactor facilities and the adequacy of proposed reactor safety standards 3. To initiate reviews of specific generic matters or nuclear facility safety- related items. The ACRS is independent of the NRC staff and reports directly to the Commission

Safety Review Phase 4 Phase 4: Advanced SER with No OIs Remaining OIs could potentially become license conditions. If all OIs are closed, the NRC staff has adequate information to reach all off the conclusions presented in NUREG-0800, Section through

Safety Review Phase 5 Phase 5: ACRS Review of SER with No OIs Applicant presents a summary of the SAR. Staff presents and defends the technical completeness and sufficiency of the SER. The ACRS drafts a letter to the Commission providing feedback on the NRC staff’s technical review. The SER may need to be amended depending on ACRS feedback.

Safety Review Phase 6 Phase 6: Final Safety Evaluation Report (FSER) with No OIs The SER becomes “final” when all open items and ACRS concerns have been addressed. hearing file This document, along with all of the supporting technical information, becomes part of the hearing file.

ASLB Hearing The Panel conducts all licensing and other hearings as directed by the Commission, primarily through individual Atomic Safety and Licensing Boards or single presiding officers appointed by either the Commission or the Chief Administrative Judge. The Panel, which has no fixed number of positions, is composed of (1) administrative judges (full-time and part-time), who are lawyers, engineers, and scientists and (2) administrative law judges (ALJs) who are lawyers. Administrative judges and ALJs serve as single presiding officers or on three-member boards, which generally are chaired by a lawyer, for a broad range of proceedings. 10 CFR Part 2: RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Mandatory Hearing vs. Uncontested Hearing

Commission Decision The Commission as a collegial body formulates policies, develops regulations governing nuclear reactor and nuclear material safety, issues orders to licensees, and adjudicates legal matters. The final licensing decision is made by the Commission. For More Information: