Project Cost Estimating A Synthesis of Highway Practices Presented by: Christine M. Fiori, Ph.D., P.E. Arizona State University.

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

Transportation Estimators Association Annual Conference Synthesis on Construction Unit Cost Development Stuart D. Anderson, PhD, PE Texas Transportation.
ESTIMATING - A CONTRACTORS PERSPECTIVE. Company History/Background Oman Construction was founded in 1876 First bridge contract in 1881 First Highway Contract.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Migrant Education Comprehensive Needs Assessment
Global Congress Global Leadership Vision for Project Management.
Best Practices for an Owner Estimating Organization
Project Management 6e..
Open Procurement Process Gauteng Provincial Treasury Process Mapping 30 th October 2014.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Copyright 2009  Develop the project charter: working with stakeholders to create the document that formally authorizes a project—the charter  Develop.
Benjamin J. Deaver Advisor – Dr. LiGuo Huang Department of Computer Science and Engineering Southern Methodist University.
Project Cost Management Estimation Budget Cost Control
CEVP ® Cost Estimate Validation Process TEA Conference 2004 Jay Drye, P.E. Assistant State Design Engineer Monica Bielenberg, P.E. CREM Program Manager.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
1 CDBG Procurement Requirements For Local Officials.
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Construction Engineering 221 Cost Estimating and Bidding.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Chapter 17 Acquiring and Implementing Accounting Information Systems
05/31/2012 Page 1 Financial Management: Timekeeping.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Chemical Engineering Department
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
Audit of Public Procurement
From Research Prototype to Production
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 3 1 Software Size Estimation I Material adapted from: Disciplined.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
 Job evaluation is the process of systematically determining the relative worth of jobs to create a job structure for the organization  The evaluation.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Municipal Assistance Bureau Recommended Bid Analysis Procedures June 24, 2014.
NCHRP Task 53 Stuart Anderson, Texas A&M Univ. Clifford Schexnayder, Arizona State Univ. Keith Molenaar, Univ. of Colorado Independent Cost Estimates.
TIME AND EFFORT NEW FLEXIBILITY GUIDELINES. ALLOCATING PAYROLL COSTS: TIME DISTRIBUTION Rules set out in OMB Circular A-87  Must demonstrate that employees.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
Introduction to Procurement for Public Housing Authorities Independent Cost Estimates and Cost/Price Analyses Unit 3.
Chapter-5 PROJECT MANAGEMENT 1. Project Management Project Management – > a carefully planned and organized effort to accomplish a specific (and usually)
McGraw-Hill/Irwin © The McGraw-Hill Companies 2010 Internal Control in a Financial Statement Audit Chapter Six.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
Project Cost Management
Light Rail Transit Project
Auctions and Competitive Bidding
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Developing the Overall Audit Plan and Audit Program
Estimating Project Costs
(Additional materials)
Software Documentation
Request for Proposal & Proposal
Proposed Budget for FY10 – FY12 December 10, 2009
PROJECT DELIVERY METHODS
A Professional Team Approach
Directed Change Constructive Change
SPOT CHECKS 2016.
Presentation transcript:

Project Cost Estimating A Synthesis of Highway Practices Presented by: Christine M. Fiori, Ph.D., P.E. Arizona State University

Arizona State University Research Team Clifford J. Schexnayder, Ph.D., P.E.  Eminent Scholar Sandra L. Weber, Ph.D., P.E.  Associate Professor Christine M. Fiori, Ph.D., P.E.  Assistant Professor Jonathon E. Burns  Graduate Student

Overview Introduction Methodology Data Analysis Results Recommendations Conclusions

Why Estimate? Estimates influence:  allocation decisions  influence long-term spending plans  serve as a framework for accounting and control Serves as a baseline to measure project management performance Estimate also works the project into the DOTs five (5) year project plan

Research Focus Review of DOT estimating practices Primarily concerned with pre-bid estimates Conceptual estimating procedures were also examined Current challenges of large transportation reconstruction projects in urban environments.

Methodology All fifty DOTs were contacted and interviewed Points of contact were generated using an AASHTO committee member list and by researching state DOT web sites. Each DOT was electronically forwarded an advance copy of the survey and an interview was scheduled.

Interview Goals Document estimating practices of state DOTs Ascertain methods for the resolution of discrepancies between DOT estimates and bid prices Identify problems that remain largely unresolved across the country Determine practices that produce estimates within a + 5% variability between the DOT estimate and contractor bid.

Data Analysis Project ranges were established, allowing differentiation between DOTs Determined program size Efforts were made to maintain a sufficient number of DOTs in each category to support the validity of conclusions

Project Data Four Ranges of Project Cost  $10 to $25 Million  $25 to $100 Million  $100 to $200 Million  Greater than $200 Million

DOT Program Classification Projects Greater than $10 Million  Small DOTs < 20 projects  Medium DOTs projects  Large DOTs projects

How are DOTs Estimating? Conceptual Estimates Contingencies Life Cycle Cost Pre-Bid Estimates Computer Use Personnel Training

Conceptual Estimates 31 DOTs use estimating cost data that are based solely upon historic cost averages for similar projects 18 other states determine quantities based on the conceptual design and follow the same procedures that are used for pre-bid estimates  3 of these states prepare detailed estimates based on preliminary design information. One state reported allowing engineers to use whatever method they thought best to generate conceptual estimates.

Contingencies? Conceptual Contingency DOT’s Practicing Set Percentage20 Graduated Scale15 Engineering Judgment15

Life Cycle Cost Analysis 27 DOTs complete on pavement materials only 14 DOTs perform during the conceptual phase 9 DOTs were unaware of any analysis performed during project development

Pre-Bid Estimates Three methods  Historical Data  Detailed Estimate  Combining historical data with actual cost development

Historical Bid Price Estimating Number of bids used Number of DOTs Reported Projects Number reported more than 5% over Estimate % Low only Low and Second Three Lowest All All Except High and Low Reasonable Price

Detailed Estimating Requires a great deal of knowledge  Construction methods  Supply systems  Labor markets  Method productivity Requires more time to prepare a detailed estimate 19 states perform detailed estimates for major work items, using historic databases to track costs  Dedicated estimating sections whose personnel have the necessary construction experience.  Use computer software that supports estimate development.

Computer Use Most widely used estimating software is the TRNS*PORT Estimator module 23 were using the software 7 using Bid Tabs 1 uses HCSS Heavy Bid 1 uses AutoCAD – quantity takeoff 18 use their own in house program

Personnel Experience 40 years  Some DOTs facing a shortage of qualified estimators due to retiring of experienced personnel 26 DOTs have separate dedicated estimating sections 24 DOTs personnel prepare estimates as an ancillary duty

Training 10 DOTs have formal estimator training programs in place or under development Mentoring and on the job training (OJT) are used extensively by all DOTs 16 DOTs have manuals that cover estimate preparation 2 DOTs are in the process of developing estimating manuals 32 DOTs do not have formal written guidance for estimate preparation that can be referenced by the estimator

Estimate Items Overhead Contractor Mobilization Demolition Work Traffic Control DOT supplied materials Unique and Specialty Items

Incentive Funds 26 DOTs have incentive funds programmed in the construction estimate 9 DOTs have incentive funds that come from other projects that are below budget 10 DOTs have incentive funds that are paid out of project contingency funds 5 DOTs currently have no incentives program in place

Other Estimating Considerations 23 DOTs operate with contingency budgets, 27 DOTs without 33 DOTs adjust their estimate based on schedule, 17 do not 38 DOTs adjust their estimates based on special conditions, 12 DOTs do not 38 DOTs adjust their estimates based upon the location within the state, 12 DOTs do not

Project Award 26 states require no action for award on bids below DOT estimate 12 DOTs require justification if it is more than 10-30% below DOT estimate Bids 5-25% above DOT estimate must be reviewed depending on the state laws 8 DOTs require all projects be reviewed prior to award

Collusion Detection 7 DOTs do not actively attempt to detect 11 DOTs require contractors to sign a form that is submitted with the bid 34 DOTs run a bid history for each project and contractor to see if there is a pattern in project awards

Releasing Information 20 DOTs release during project planning an anticipated project cost range 22 DOTs release after award all bidder information and total project amount 10 DOTs release the information at the bid letting 19 DOTs release a copy of the DOTs estimate including quantities and unit costs

Bid Comparison Data for all DOTs

DOTs using Detailed Estimating

DOTs using Historic Bid Price Estimating

Projects valued between $10-$25M

Projects valued between $25-$100M

Challenges of Major Projects Stretch available resources to the limit ─ labor, material, management skill, and information systems Have a high profile with political subdivisions and the public Are very noticeable by regulators Are unusually long duration projects and there is less likelihood of maintaining continuity of management

Reasons for Cost Overruns Protection of the natural environment from the effects of the project Protection of the public health and safety from the effects of the project Controls on the use of labor or procurement Other government standards or regulations Whether or not the project embodied any first-of- a-kind technology.

Recommendations Estimating Guidance Conceptual Estimates Design Phase Cost Control Pre-Bid Estimates Award Release of Estimate Design Build Projects Projects Valued Over $100 Million

DOT’s must consider: How are estimates usually done? What do we need to do to get a valid estimate? How do we develop a reliable cost estimating and validation process? The estimating process must evaluate variability and risk using logical, reasonable statistical (probability) methods

To ensure future success DOT’s must... Avoid false precision Relate contingency to the layman’s everyday experiences with uncertainty Invest in continuous and transparent QA/QC of your estimating processes