PBES Seismic Research at the University of Washington John Stanton, Marc Eberhard, Kyle Steuck, Jason Pang, Todd Janes, Olafur Haraldsson, Hung Viet Tran,

Slides:



Advertisements
Similar presentations
Precast Bent System for Bridges in Seismic Regions
Advertisements

Actions and Retrofit of Post Earthquake-Damaged Bridges
Connection Details for Prefabricated Bridge Elements and Systems
Seismology and Earthquake Engineering :Introduction Lecture 3
Experimental Testing of Drift- Sensitive Nonstructural Systems – Year 4 The Pathways Project San Jose State University Equip Site:
1 Volpe The National Transportation Systems Center Finite Element Analysis of Wood and Concrete Crossties Subjected to Direct Rail Seat Pressure U.S. Department.
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Structural System Overview
Engineering Perspectives on First Year of New Reactor Construction Mohamed Shams, Ph.D., PE Structural Engineering BC US NRC, Office of New Reactors July.
By: “The Slackers” Danny Efland Maria Cuellar Joel Irvine.
Section 4 Loss of Prestress Emphasis on Items specific to Post-tensioned systems Developed by the pTI EDC-130 Education Committee lead author: Brian.
Fundamentals of Building Construction, Materials & Methods, 5 th Edition Copyright © 2009 J. Iano. All rights reserved. Plant-Cast Precast Concrete Concrete.
SHRP2 Project R04 Bridge Designs for ABC
Spliced Precast Girders
PCI 6 th Edition Handbook History. Presentation Outline PCI history Notable modifications to the 6 th Edition General chapter by chapter overview.
ADSC/CALTRANS CIDH Pile Workshop Spring Overview of Structural Design and Detailing of Large Diameter Drilled Shafts (Caltrans Practice) Amir M.
Chapter-7 Bond Development Length & Splices
Connection Details for Prefabricated Bridge Elements and Systems
UNBONDED PRE- STRESSED CONNECTIONS Prof. John F. Stanton University of Washington, Seattle, Washington, USA The ROSE School, Pavia. June 2009.
2E8 Materials (Civil Engineering Component) Civil Engineering Materials Department of Civil, Structural and Environmental Engineering Trinity College Dublin.
Section 3 design of post-tensioned components for flexure Developed by the pTI EDC-130 Education Committee lead author: trey Hamilton, University of.
UNBONDED POST-TENSIONED HYBRID COUPLED WALLS Yahya C. KURAMA University of Notre Dame Notre Dame, Indiana Qiang SHEN, Michael MAY (graduate students) Cooperative.
EFFECT OF LARGE OPENINGS IN UNBONDED POST-TENSIONED PRECAST CONCRETE WALLS Michael Allen Yahya C. Kurama University Of Notre Dame Notre Dame, IN.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Yahya C. Kurama University of Notre Dame Notre Dame, Indiana, U.S.A
UNBONDED POST-TENSIONED HYBRID COUPLED WALLS
Strong-column/weak-beam
Experimental & Analytical Studies of Drilled Shaft Bridge Columns Sandrine P. Lermitte, PhD Student Jonathan P. Stewart, Assistant Professor John W. Wallace,
 Project Delivery  Design Considerations  Lessons Learned.
Shake Table Testing of a Large Scale Two Span R-C Bridge Univ. of Washington *PI: Marc Eberhard Co-PI: Pedro Arduino Co-PI: Steven Kramer RA: Tyler Ranf.
POTENTIAL ISSUE TEAM STUDIES CONCRETE CODIFICATION OPPORTUNITIES 1. CONCRETE SHEAR WALLS Current Codes provide detailed provisions for the seismic design.
CEE Capstone II Structural Engineering
Experimental Study on the Damage Evolution of Re-bar Concrete Interface Lu Xinzheng SCE, THU CSE, NTU 1999/2000.
Seismic Performance Assessment of Flat Plate Floor Systems John W. Wallace, Ph.D., P.E. Thomas Hyun-Koo Kang, Ph.D. Student Department of Civil and Environmental.
Damage Illustrations. Potential Bridge Damage Bridge Component / DamagePossible Cause Approach Slab or Pavement  Raised, lowered, cracked, or buckled.
Post-Tensioned Precast Concrete Coupling Beams for RC Walls
Concrete Construction
WS Atkins Bridge Engineering Research Activities Mike Chubb.
Note: Moment Diagram Convention
Introduction Advantages Dis-advantages Methods of Pre-stressing Mix Design Curing Laboratory Test Visit Report.
Tests of High-Performance Fiber- Reinforced Concrete Coupling Beams James K. Wight F.E. Richart, Jr. Collegiate Professor Dept. of Civil and Env. Eng.
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Feng Xiong PhD Professor of Civil Engineering Sichuan University Nonlinear Finite Element Analysis for Precast Short Column Connections Under Cyclic Loading.
SHEAR IN BEAMS. SHEAR IN BEAMS Introduction Loads applied to beams produce bending moments, shearing forces, as shown, and in some cases torques. Beams.
HFL Testing Briefing - WSDOT ABC Meeting University of Washington Marc O. Eberhard, John F. Stanton, Olafur S. Haraldsson, Todd Janes, Hung.
STRUT & TIE MODELS (S-T-M)
Jennifer Soderstrom University of Washington
TOPICS COVERED Building Configuration Response of Concrete Buildings
1 HVACR116 – Trade Skills Structural Drawings. 2.
Prestressed concrete is a method for overcoming concrete's
Civil and Environmental Engineering Departments
Team UCDSESM Yihai Bao, YeongAe Heo, Zhiyu Zong University of California, Davis April 4 th, 2008 Prediction for Progressive Collapse Resistance of a 2D.
University of Notre Dame Notre Dame, IN
EXAMPLE 9.3 – Part V PCI Bridge Design Manual BULB “T” (BT-72) THREE SPANS, COMPOSITE DECK LRFD SPECIFICATIONS Materials copyrighted by Precast/Prestressed.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Prestressed Concrete I.  *Unfavorable effects induced from the presence of cracking in reinforced concrete: To expose the reinforcement to corrosion;
Practical Design of PT Buildings
Controlled Rocking of Steel Braced Frames
Rapid Construction of Bridge Piers with Concrete Filled Tubes
EAS 453 Pre-stressed Concrete Design
Vulnerable Structural Elements
Condition of Prestressing of the Ft. Lauderdale- Hollywood Airport Deconstructed Segmental Bridges Luis M. Vargas Beiswenger Hoch and Associates.
Investigation of the Effects of End Region Deterioration in Precast, Prestressed Concrete Bridge Girders Royce Floyd, Cameron Murray, Darion Mayhorn DONALD.
Visit for more Learning Resources
Mohammad Maher Jaradat Raghad Abdel-Salam Owaidat
RCC UNIT-12 Prestressed Concrete
Masonry Bearing Walls.
ASSESSEMENT AND REHABILITATION OF STRUCTURES
Presentation transcript:

PBES Seismic Research at the University of Washington John Stanton, Marc Eberhard, Kyle Steuck, Jason Pang, Todd Janes, Olafur Haraldsson, Hung Viet Tran, Phillip Davis, Gunnsteinn Finnsson, Jeffrey Schaefer. University of Washington FHWA P2P Exchange Workshop, Seattle,

Partners WSDOT WSDOT Berger-ABAM Berger-ABAM Concrete Technology Corporation Concrete Technology Corporation Tri-state Construction Tri-state Construction

Acknowledgments FHWA (Highways for Life) FHWA (Highways for Life) WSDOT WSDOT PEER PEER TransNOW TransNOW Valle Foundation Valle Foundation PacTrans PacTrans NSF-NEES NSF-NEES

Objective Develop a family of seismic bridge PBES connections for: Rapid construction Rapid construction Superior seismic performance Superior seismic performance Designers can mix and match connections to suit local conditions.

Key Elements 1. Large bars grouted in ducts. (Rapid construction)

Key Elements 2. Socket connections. (Rapid construction)

Key Elements 3. Unbonded pre-tensioned columns. (Seismic performance)

Construction Procedure 1) Excavate footing.

2) Position and brace precast column. Construction Procedure

3) Place footing reinforcement and cast. Construction Procedure

4)Set cap-beam, grout bars into ducts. Construction Procedure

5) Place girders, diaphragms and deck. Construction Procedure

Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails

Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails

Large Bar Connection (Cap Beam) Bars grouted into ducts. Bars grouted into ducts. Few, large bars simplify fit-up. Few, large bars simplify fit-up. Is development length a problem? Is development length a problem?

Large Bar Connection (Cap Beam) #18 Bar Anchorage Tests - Pullout tests. - Need 6d b to develop yield, 10d b to develop fracture. - Bar can easily be anchored within cap beam.

Large-Bar Connection Cyclic Lateral Load Testing

Large-Bar Connection Failure occurs in the column. Failure occurs in the column. PC Connection behaves the same as c.i.p. PC Connection behaves the same as c.i.p. Cyclic Lateral Load Testing

Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails

Footing Connection: Construction Headed bars

Performance Footing Connection - Performance Headed bars provide good load transfer. Internal forces: Strut and Tie Model.

Footing Connection Hooked bars facing out (Conventional cip) Load transfer is tangential to hook. Poor transfer.

Spread Footing Connection Vertical (gravity) load. Lateral (seismic) load.

Spread Footing Connection Constructability: Column has no projecting bars.Column has no projecting bars. No “form-savers”.No “form-savers”. Easy to fabricate and transport.Easy to fabricate and transport. Note: Top steel not yet in place

Spread Footing Connection Structural Performance Terminators provide better anchorage than hooked bars facing outwards.Terminators provide better anchorage than hooked bars facing outwards. Failure occurs in column, not footing.Failure occurs in column, not footing. Seismic performance as good as, or better than, conventional c.i.p. construction.Seismic performance as good as, or better than, conventional c.i.p. construction.

Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails

Drilled-Shaft Connection

DS-1 DS-2

Drilled-Shaft Connection Performance depends on spiral in transition region. 100% c.i.p. spiral  failure in column.100% c.i.p. spiral  failure in column. 50% c.i.p. spiral  failure in transition.50% c.i.p. spiral  failure in transition. Hoop tension strength of transition region concrete appears to be important. Third drilled shaft specimen (in lab now) has thin concrete in transition region.Third drilled shaft specimen (in lab now) has thin concrete in transition region.

Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails

Background Unbonded prestressing tendons for elastic restoring force. Yielding steel for energy dissipation. Self-centering structural systems

Pre-Tensioned System 1.Pre-tensioning solves corrosion problems perceived to exist in post-tensioning. 2.Pre-tension in a plant. Good QC.Good QC. No special equipment or extra site time needed (compare with post-tensioning).No special equipment or extra site time needed (compare with post-tensioning). 3. Can add rebars for energy dissipation.

Pre-Tensioned System PC cap- beam Sleeved strand Bonded strand c.i.p. footing Bonded rebar Cracking plane

Test Specimens Footing specimen Cap beam specimen

Test Specimens - Footing connection

Test Specimens- Footing details Screw-thread adjustment device Load cell Strand chuck Strand sleeve Bonded region Void under column

2% drift

Load vs. Displacement RC: does not re-center UBPT: re-centers

Preliminary Results 1. System re-centers. 2. No strands broke. 3. No loss of strand bond. 5. Damage to concrete at interface, possibly promoted by stub bars from footing.

New pre-tensioned specimen in lab now: New pre-tensioned specimen in lab now: 1.Use HyFRC (Hybrid fiber reinforced concrete) in the plastic hinge zone to reduce crushing. 2.Use stainless steel rebars to increase drift capacity and energy dissipation.

Thank You

Background Accelerate on-site bridge construction. Use precast concrete components. Connection details: seismic-resistantconstruct

Column-to-Cap-Beam Connection

Precast column Precast cap beam 6 # 18 rebar 8.5” corrugated steel ducts High strength grout Cap-Beam Connection: Large bars

Column-to-Footing Connection

Pre-Tensioned System

2% drift

6% drift

Spread Footing Connection after seismic testing Foundation undamaged. Foundation undamaged.

Spread Footing Connection – Gravity Load Test (Damaged) column crushed at: 3.5 * (1.25DL LL). No damage to footing. No sign of punching failure.

SF-1 H f /D c = 1 Slots in column base More diagonal rft. 100% Caltrans stirrups SF-2 H f /D c = 1 No slots Less diagonal rft. 50% Caltrans stirrups

Spread Footing Thickness SF-1 and SF-2. H foot = D col SF-3. H foot = 0.5 D col

SF-1 H f /D c = 1.0 Slots in column base More diagonal rft. 100% Caltrans stirrups SF-3 H f /D c = 0.5 No slots Less diagonal rft. Heavy beam shear reinforcement

SF Movie

After testing. SF-3

DS-1 100% transverse reinforcement in transition region DS-2 50% transverse reinforcement in transition region

Next Steps: Next Steps: 1.Test pretensioned, cap-beam specimen. 2. Bond tests on epoxy-coated strand. 3. Data analysis and design methodologies. Looking Forward: 1. Methodology calibration tests (Grouted ducts, spread footings, drilled shafts) 2.High-performance materials (e.g. ECC at rocking interface).

Precastprestressedc.i.p. RC (ref) PrecastRCCap-beam to column Column to spread footing spread footing Column to drilled shaft drilled shaftConnectionDetails NEXT !