M N P Onshore & Offshore SHIPBUILDING PROJECTS JSC "KRASNOE SORMOVO" SHIPYARD"

Slides:



Advertisements
Similar presentations
MNP – ONSHORE & OFFSHORE GROUP QUALITY MANAGEMENT SYSTEM
Advertisements

Quality Management Training Quality circles Bench Mark Kaizen.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
ISO 9001: Countdown to 2015 Presented by Ellen Diggs Ellen Diggs Consulting February 11, 2015 It’s Not Just for Manufacturing Anymore!
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
Nomad Aviation Employee Training on ISO 9001 – the globally recognized quality management system 1ISO 9001 Training for Employees-Rev. B.
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Quality Management System
INDUSTRIAL & SYSTEMS ENGINEERING
1 Assessment: Audits. Assessment: Audits - Module 9 2 Learning Objectives At the end of this activity, you will be able to: Develop a process to prepare.
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
ISO 9000 Certification ISO 9001 and ISO
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
5.2 Personnel Use competent staff Supervise as necessary
Software Process Improvement Initiative
ISO 9000 Implementation Imran Hussain.
ISO 9000 Introduction Imran Hussain.
JENN SHAFNER BRIAN KROUSE CLINT KEHRES. Pre ISO 9000  The BS 5750 standard required factories to document manufacturing procedures.  BS 5750 was known.
CLINICAL ENGINEERING part(3) Dr. Dalia H. Elkamchouchi.
OAS REGIONAL PROJECT QUALITY MANAGEMENT. What percentage of time in the work day do you have to devote to solving PROBLEMS? - ours or someone else´s (suppliers,
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
ISO 9001 Quality Management System
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Quality Management System
Basics of OHSAS Occupational Health & Safety Management System
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Lec#3 Project Quality Management Ghazala Amin. 2 Quality Specialist-Job responsibility Responsibilities Reports monitoring and measurement of processes.
Visit us at E mail: Tele:
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
Visit us at E mail: Tele:
QUALITY MANAGEMENT STATEMENT
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The following training presentation is for all 1Prospect subcontract employees and is taken upon joining a contract or task order to which 1Prospect is.
SEN 460 Software Quality Assurance. Bahria University Karachi Campus Waseem Akhtar Mufti B.E(C.S.E) UIT, M.S(S.E) AAU Denmark Assistant Professor Department.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 Quality Management Z SUZSANNA E SZTER T ÓTH R ITA D ÉNES Department of Management and Corporate Economics 1 March 2016.
ORGANIZATIONAL FEASIBILITY STUDY 1 Chapter (5) Lecturer.Ahmed El Rawas.
Working to Raise the Bar in the Quality, Professionalism and Value of Integration Services.
Management, Supervision, and Decision Making Chapter 2.
The following training presentation is for all Advancia Corporation subcontract employees and is taken upon joining a contract or task order to which Advancia.
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
Chapter 15 Telecommunication Department Management.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
ISO 9001: 2015 BUSINESS PROCESS IMPLEMENTATION GENERAL AWARENESS
What is ISO? ISO is that the world’s largest developer of voluntary International Standards. International Standards provide state of the art specifications.
Personnel.
UNDERSTANDING ISO 9001:2008.
ISO/IEC
The following training presentation is for all subcontract employees and is taken upon joining a contract or task order to which we are the Prime vendor.
Quality Management Process
Structure and Responsibility
ISO An introduction Part 3
Learn Your Information Security Management System
Awareness program on ISO/TS16949:2002
External Validation of Quality Programs
UNIT V QUALITY SYSTEMS.
Prepared by: Miss Samah Ishtieh
Quality Management Systems – Requirements
ISO An introduction Part 3
Project proposal for ISO 9001:2008 implementation
ISO 9000 Dr. S. Thomas Foster, Jr..
ISO 9001:2008 Quality Management Systems
External Validation of Quality Programs
Presentation transcript:

M N P Onshore & Offshore SHIPBUILDING PROJECTS JSC "KRASNOE SORMOVO" SHIPYARD"

JSC “Krasnoe Sormovo Shipyard” Quality Management Policy The main strategic target of the company’s quality policy is to provide competitiveness and profitability of the company by production and realization of products which meet Customers’ requirements. Tasks that the top management determined to the company’s personnel to achieve the main strategic target Production and realization of the products which meet the requirements of the clients To make products of high quality by exact following a production process (technology of production) Quality management system certification in accordance with GOST and ISO requirements, permanent perfectibility and effectivization of the system

JSC “Krasnoe Sormovo Shipyard” Quality Management Policy The main tasks for the stated target achievement. Production of qualitative products and permanent quality improving Control and analysis of the references, proposals and claims of the clients and Register during building period, trials, and operation of the product. Appropriate functioning of the quality management system and permanent work for its improvement Development and execution of measures for product quality and work performance improvement (quality reporting system and measurement assurance improvement, modification and replacement of the old equipment, improvement of the information support system and management structure system, personnel training, etc.)

JSC “Krasnoe Sormovo Shipyard” Quality Management Policy Initial action principles Initial action principles for policy realization and tasks solutions  Personal responsibility of the top management of the company for the development, implementation, maintaining and control of the quality system. Assigning of the authorized representative (responsible person)  Allocation of funds to conduct the quality policy and to achieve the stated objective  Information of the employees about the general targets and tasks  Integrated solutions of the tasks about the production of the high quality goods and prevention of the quality problems The responsibility of each employee for the quality of their work and goods produced by them. Each person is to know his task and responsibility extent, to be a professional, to improve his professional skills, to analyze his working results and to contribute suggestions for improving of the labor and production quality.

JSC "KRASNOE SORMOVO" SHIPYARD" QUALITY MANAGEMENT SYSTEM QMS JSC "KRASNOE SORMOVO" SHIPYARD" 1 QMS Analysis, Planning and Continuous Improvement   Analysis of quality management system   Quality policy and objectives management   Quality planning and resource allocation 1 QMS Analysis, Planning and Continuous Improvement   Analysis of quality management system   Quality policy and objectives management   Quality planning and resource allocation 2 Measurements, analysis and improvements.   Production monitoring and measurements   Process monitoring and measurements   Consumer satisfaction monitoring and measurements   Internal auditing   Corrective and preventive actions 2 Measurements, analysis and improvements.   Production monitoring and measurements   Process monitoring and measurements   Consumer satisfaction monitoring and measurements   Internal auditing   Corrective and preventive actions 3 Measuring equipment management.   Metrological evaluation of technical documentation   Management of production control, measurement and test equipment   Management of control, measurement and test equipment, metrological assurance 3 Measuring equipment management.   Metrological evaluation of technical documentation   Management of production control, measurement and test equipment   Management of control, measurement and test equipment, metrological assurance 4 Production manufacturing and delivery planning, finance management   Contract analysis   Production planning   Finance management 4 Production manufacturing and delivery planning, finance management   Contract analysis   Production planning   Finance management 5 Production Preparation   Project design documentation management   Special and vital technological processes management   Technological performance control   Planning of the technical development of the company 5 Production Preparation   Project design documentation management   Special and vital technological processes management   Technological performance control   Planning of the technical development of the company 6 Purchasing   Vendors evaluation and selection   Purchasing contracts signing and management   Incoming inspection   Analysis of purchases quality 6 Purchasing   Vendors evaluation and selection   Purchasing contracts signing and management   Incoming inspection   Analysis of purchases quality 8 Production   Production planning   Equipment and outfitting management   Production monitoring and measurements   Management of control, measurement and test equipment, metrology   Non-standard production management   Infrastructure and ecology   Health and industrial safety 8 Production   Production planning   Equipment and outfitting management   Production monitoring and measurements   Management of control, measurement and test equipment, metrology   Non-standard production management   Infrastructure and ecology   Health and industrial safety 7 Personnel Management   Determination of need in staff and supply with staff   Planning and conduction of training   Personnel attestation   Motivation 7 Personnel Management   Determination of need in staff and supply with staff   Planning and conduction of training   Personnel attestation   Motivation

SAFETY MANAGEMENT SYSTEM Professional recruitment, medical control in the yard hospital, employees training and attestation in the yard training center and technical college Safety and healthy conditions, work clothes, hygiene and protection means for employees Free medical service, arrangement of employees rest at leisure and during vacation

CERTIFICATES

JSC "KRASNOE SORMOVO" SHIPYARD" NUMBER OF EMPLOYEES Number of workers – 2121 persons