Assignment 3 Unit 21Kyle Barrass Presentation of a Construction Project.

Slides:



Advertisements
Similar presentations
Common Components of a Traditional Wood Framed Building
Advertisements

Gantt Chart.
Assignment: Draw the four elevations of your building
Timber Framed Structures
Activity Produce a project plan – George Bailey has bought a plot of land on which he wants to build a house. The house will be two storeys high and will.
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe.
Architectural Drawing
 Objectives (students will be able to): Select a traditional roof style and create a roof plan for a two-story house Calculate the pitch of a roof using.
ARCHITECTURAL STYLES WATKINS. Determine owner’s needs Successful design Represents owner’s lifestyle Meets owner’s needs.
Creating a section view using floor plans
 In Slovakia according to the climate, weather and geographic conditions, plus energy house cannot be built because the only source of energy can be used.
1 Presentation 25 CONSTRUCTION MATERIAL. 2 Learning Outcomes By the end of this meeting, students will be expected to be able to : Students can explain.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Rectangular framed structures
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Technical boclair academy Building Drawings.
Drafting Rear Elevations. Start with outer frame when drafting standard flat. Heights are generally in multiples of 2’-0”. Outer Frame.
Cellular construction
Prefabricated Timber Frame Construction
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
Chapter 8: House Construction
Basic Building Techniques. Exploration Time Use the next 15 minutes to build. After the 15 minutes are up, everything will need to be broken apart and.
Btec Construction Unit 5 Methods of construction for domestic buildings.
Chapter 35 Section Layout.
Floor Framing Unit 29.
Wall and Ceiling Construction
Common Components of a Traditional Wood Framed Building
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
Ag Construction Studs Vertical framing boards are called.
Sustainable Construction Methods
Wood Construction CTC-375.
Integrants: Arliss Delgado Ricardo Uzcategui Universidad Simón Bolívar Ingles para arquitectos y urbanistas II.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Competency: Draw exterior elevations
1 Presentation 10: FLOOR SYSTEM COMPONENTS. 2 Framing Methods Platform Framing: –Each floor is constructed and then walls are placed on top.
Unit 6/P6 – Timber Frame Construction Name ________________
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
Orthographic Drawings
Week 6 Timber based columns
APPLICATIONS OF TECHNOLOGY
Drafting 2 (Arch) Quiz Review #5
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Introduction to Elevations
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Prefabricated Timber Frame Construction
Major Steps In Building a SFR
Timber Framed Buildings
WALL Barrios Laura Bigott Dairet
Gantt Chart Presentation Name Course Name
Common Structural Forms
Curriculum for Excellence
Διαθεματική εργασία Μ.Παπαδημητρίου και κ.Κώνστα Θεοφανή(Γ1,Γ2)
BUILDING CONSTRUCTION 1
Progress Charts.
Introduction to Elevations
•Connecting to the Foundation & Bearing
DrawING exterior elevations
Competency: Draw exterior elevations
Section and Details Vocabulary and Basic Information
Name____________________________ Tutor Group _____
Building Drawings.
Name____________________________ Tutor Group _____
Applications of Timber Teaching Resource
Project Name – ID # 7/1/2009 Current Project Status Project Issues
Location Plans & Site Plans
Gantt Chart.
Think About it….. Jot down everything you think you know about residential wall framing. Hint: think about what you already know about floor framing.
Presentation transcript:

Assignment 3 Unit 21Kyle Barrass Presentation of a Construction Project

First Stage of the Construction Building The first step was to design a drawing of the building to give the client an idea of what he wanted.

First Stage of the Construction Building The client decides on what he wants.

First stage of the construction Building Before the building was even started there was a Gant chart make to know what was going to happen, when it was going to happen and how long it should take.

Designing the Building After the design on the building was chosen I designed a mini version of the timber frame.

Designing the Building Before the brick walls started the timber frame flooring was put into place.

Designing the Building After the mini model of the timber frame was done the work on the foundations had already been done so work on the brick and block walls was started.

Designing the Building The work on the building was set back down to the bad weather, it was set back by a few weeks.

Designing the Building As the brick walls had been held back the timber frame walls were being put together.

Designing the Building After the timber frame walls were built the work on the window frames and door frames started.

Designing the Building The Gant chart had to be changed as the bad weather set the building back by a few weeks, as you can see in the photo below.

Designing the Building As you can see the brick walls had been kicked down by someone coming onto the site, so the brick and block building was set back even more.

Designing the Building Here are the students putting the plywood on the timber floor.

Designing the Building The timber framed walls were put up and as you can see we ran into a little problem that was easily solved.

Designing the Building The first timber roof trust was built and the only thing that needed changing was the length of the overhang.

Designing the Building The plywood was put onto the timber walls and the roof trusts were constructed with more overhang.

Designing the Building The work on the brick and block building was started again and the block work was started on the timber and block building.

Designing the Building The rest of the roof trusts were put in place and then the ply wood was put in place.

Designing the Building The work on the tiling being done and the rest of the brick and block building is being done at the same time.

Summary Timber frame construction was erected quicker than traditional building Adverse weather had little impact on timber frame construction Quality issues with some of the timber walls and roof construction – to improve inspection off-site