BREEAM at Lancaster University March 2012 Suzanne Parkinson, Head of Project Delivery.

Slides:



Advertisements
Similar presentations
North West Fire & Rescue Services PFI Project Colin Schofield Project Manager Tony Clarke Seymour Harris Architecture on behalf of Balfour Beatty.
Advertisements

Innovate Green Office Engineering the future – The UKs greenest office? Doug King Principal, King Shaw Associates Consulting Engineers.
Sustainability Fire AJ 100 London and South East Practice of the Year 2009 FX Interior Design Practice of the Year 2008.
Emerado Public School: Energy Audit & Energy Conservation Alternatives Undergraduate Thesis Mechanical Engineering Kristin McKenzie March 15th, 2007.
East Bridgford Project Existing Projects The Green Box Project Adaptation Techniques used within this project:- Natural ventilation is increased by a passive.
1 Making buildings better Building Tight Chris Knights.
Sustainable Construction
Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)
Tas seminar/demonstration on Part L 2006 of the Building Regulations Presented by Alan Jones EDSL February
National Home Energy Conference 16 May 2006 Woking – Progress So Far Ray Morgan Chief Executive, Woking Borough Council.
Sustainable Architecture Presented by Caroline Batson Senior Architect and Sustainability Manager.
BREEAM use at the University of Bristol. Overview Background Our Approach Progress to date Lessons learnt.
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
Presentation 1 Arnaud Gibert Bintou Ouedraogo Danny Tang Naeema Hafeez Paul Dupuy.
Summary of Heat Loss Calculations Assessing overall heating requirements for building (E) Component U-ValueAreaHeat Loss Rate (W o C -1 ) Walls U walls.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
A growing sector in figures. europeAn bioenergy outlook 2014 ©AEBIOM - European Biomass Association The European Biomass Association (AEBIOM) released.
Post Occupancy Evaluation of Sustainable Development Projects in the Education Sector Leanne McMillan, Senior Consultant, BRE Scotland.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
London Student Housing Conference 30 June 2008 Designing in Sustainability Victoria Hands and Ian Spencer London School of Economics & Political Science.
Towards Net Zero Energy Buildings: Dynamic Simulation of office Building in Three Climate Zones of Europe Nusrat Jung 1,2, Jari Shemeikka 1, Risto Lahdelma.
NEW HARMONY APARTMENTS DAVIS, CA. NEW HARMONY APARTMENTS OWNER: MUTUAL HOUSING CALIFORNIA TEAM: KUCHMAN ARCHITECTS PC - ARCHITECT BARRISH PELHAM & ASSOCIATES,
Calculation of Energy Performance of Buildings - Lithuanian Case. Dr
Presentation 2 TEAM ZERO Arnaud Gibert Bintou Ouedraogo Danny Tang Naeema Hafeez Paul Dupuy.
Kara Steeland Adena Kass William Finnicum Global Change 1-Section 5.
Green Building Residential Construction
Passive House Seminar for Professionals from the Building Sector
SUSTAINABILITY ON THE DEFRA ESTATE John Hives FRICS Head of Capital Development & Sustainability Estates Division Presented at - Procurement Solutions.
Phoenix Convention Center Phoenix, Arizona Introducing the Building Energy Asset Score Building Performance Session 2: Elements of Building and Data Management.
Including Sustainability in the Brief Kate Mills Senior Sustainability Consultant, BRE
Green Star – Campus Group Work. Rating tool framework Management Indoor Environment Quality Energy Transport Water Materials Land Use and Ecology Emissions.
Project Managers Guide to Energy and Water Efficiency Measures in University Buildings Energy Consortium Conference 8 th December 2006 MATTHEW EDIS Building.
Riga Technical University Institute of Heat, Gas and Water technology OFFICE BUILDING NIGHT COOLING POTENTIAL IN BALTIC REGION RENARS MILLERS, ALEKSANDRS.
Sustainable Construction Methods
14 July 2009 JOHN WHEATLEY COLLEGE EAST END CAMPUS.
Cranbrook A zero carbon case study 10 th July 2012 Mike Wood Centre for Energy and the Environment.
Sustainability in Non Domestic Construction By Professor Christopher Gorse – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike.
Earth’s Changing Environment Lecture 15 Energy Conservation.
Sustainable Lancaster University. Sustainability : Why bother ? Climate Change Depleting natural resources Rising utilities & fuel prices.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
BREEAM HIGHER EDUCATION AND LABORATORIES Peter James Higher Education Environmental Performance Improvement (HEEPI)
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
Carbon Emissions and the Need for Improved Energy Efficiency.
The American Recovery and Reinvestment Act: A NIH Overview.
Brent Sustainability Forum - Civic Centre Update Brent Council Aktar Choudhury Civic Centre Team.
To reduce negative environmental impacts. To move towards more natural habitats. To reduce operating costs. To enhance building marketability. To improve.
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
Btec level 2 Construction UNIT 3 Sustainable Construction-energy use.
Going Green Is it Worth it? Melbourne Convention and Exhibition Centre AIPC July 2010.
UCCCfS: Climate Change Action Plans Monday 11 th May 2009 Derek Marshall Estate Development Manager - Dundee College.
Construction Unit 5, Lesson 3 Explanation Presentation © 2011 International Technology and Engineering Educators Association, STEM  Center for Teaching.
Running on Hydrogen Fuel Cells! State of the art design!
BREEAM 2008 Update Ama Ndukwe BRE Global, Sustainability Group.
FP7 SmartCities READY. Participating Cities VäxjöDemonstration Aarhus, DenmarkDemonstration Kaunas, LithuaniaObservation Project duration: 60 months Expected.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Edexcel BTEC Level 2 Diploma in Construction Influencing Factors Unit 3 Sustainability in the Construction Industry.
Mexico 2050 Calculator Training Week – th August 2013.
8. VENTILATION  When there is a difference between outdoor and indoor temperature, ventilation can be accomplished by natural means. Strategically placed.
Renewable Energy Technologies and the Building Schools for the Future Programme Property Group - M&E Team Michael J Rigby M & E Team Manager Mechanical.
Why Green is Better An overview of green infrastructure in the built environment BTG Green Infrastructure event, Tremough, 6 th November 2012 Tony Norton.
Storage and Warehousing Techniques
Sustainability Assessment of Family House - Case Study
Getting to Zero Carbon Heather Stamp Low Carbon R&D Manager
Building Environmental Systems
Specifics of multi-apartment building deep complex retrofitting
Sustainability and the Built Environment
bre Innovation Park Visitor Centre:
Pre-Contract Cost Control
20 Chestnut Drive, Mansfield
Green Building and Sustainable Architecture
Presentation transcript:

BREEAM at Lancaster University March 2012 Suzanne Parkinson, Head of Project Delivery

Contents Masterplan Refresh Projects completed On site projects Future works Lancaster University BREEAM experience Case Study – Lancaster Institute of Contemporary Arts (LICA) Outstanding BREEAM assessment

Capital works completed 2005 to date

LU BREEAM Awards

Lancaster Institute of Contemporary Arts (LICA)

Example image HALO DUT LICA location N

LICA – Aerial View Example image

Lancaster Institute of Contemporary Arts (LICA) 4900m 2 gross floor area over three floors top floor (1900m 2 ) is currently shell space basic building cost : £1,178/m 2

 Tendered in June 2009 Under budget therefore.... The University had a couple of aspirations:  BREEAM Bespoke Excellent -> BREEAM HE Outstanding  2 storey to 3 storey  MS appointed in August 2009 Lessons Learnt Example image

Timber Cross Laminated Construction All floors, walls, roof, stairs, columns and beams made from cross-lam or glu-lam timber Raw material – from sustainably managed forests Factory based component pre-fabrication

Ventilation Strategy – Double height space Extract picking up heat from lighting rigs for heat recovery (75% efficient)up heat from lighting rigs for heat recovery (75% efficient Underfloor heating in sprung floor from lighting rigs for heat recovery (75% efficient Displacement ventilation, variable flow linked to occupancy

Electrical Design Constraints on distribution and servicing (no GF floor void, partial ceiling void) Minimising the ‘clutter’ Significant interfacing with specialists BREEAM compliant lighting and controls

BREEAM Assessment

Energy Use Drive towards aiming for Outstanding came from the advantages of timber construction Some of the principle points: Air tightness 3.02 m 3 /(h.m 2 ) EPC of 21 Heat recovery Enhanced U-Values Renewable technology Water management District heating with CHP Photovoltaic cells (150m2)

Predicted electricity consumption – 73.4kWh/m 2 Predicted fossil fuel consumption - 148kWh/m 2 Predicated renewable energy generation – 3.46kWh/m 2 TOTAL CONSUMPTION – kWh/m 2 per annum Energy Use

Water Use Predicted Water Use – 2m 3 / person / annum 50% Water use to be provided by rainwater using the rainwater harvested from the roof Remaining rainwater is discharged into the pond which provides attenuation

Design for BREEAM compliance - Building Form - Timber Frame Interaction between credits - Materials & Waste - Energy & Pollution - Free cooling & mechanical cooling Time-limited credits during: - design stage - construction stage Inconsistencies of BREEAM criteria BREEAM Assessment

Management of BREEAM process Design and construction teams interaction In depth knowledge of BREEAM manual & assessment calculations Potential credits evaluation at all stages of assessment Safety margin Assessment involvement to achieve target Progression between Design Stage & Post Construction BREEAM Assessment