The NHF Schedule of Rates in modern procurement practice

Slides:



Advertisements
Similar presentations
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Advertisements

Abcdabcd Low Rise Buildings The Built Environment in which we live is composed of:- Buildings Travel systems Services Disposal & Treatment Systems. The.
Effective Asset Management John Holdsworth & Sue Philpott.
Homeowners’ meeting JMB is seeking to make service charges clearer and more fair, not higher or lower overall No cross-subsidy between leaseholders and.
Tenants’ Union of Tasmania Inc. Lesson Two Beginning a Tenancy.
Historic Buildings Grant-Aid Scheme Details Built Heritage Directorate NIEA.
Component Accounting Briefing
Council Housing to the Rescue Phil Roberts and Russell Shortland - NKDC.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
Civil Engineering & Architecture 2.3 Residential Design.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
FOR SALE 45 Sharow Grove Blackpool FY1 5NE 290 Church Street Blackpool Lancs FY1 3QA Fax: (01253)
E n v i r o n m e n t a l Health & Safety. April 2001Environmental Health & Safety2 What is IPM? Integrated Pest Management (IPM) is the coordinated use.
Key Findings and Implications for the Future from the Stock Condition Survey undertaken by Savills Presented by Winston Williams January 2008.
Hard to Treat Homes Bev Coombe Membership and Communications Manager.
CDM 2015 Are we there yet? Michael Anderson Anderson Bradshaw Limited.
CONSTRUCTION BLUEPRINT READING
FOR SALE Napier Avenue Blackpool FY4 1PA Large Garage and patio garden PVCu Double Glazing & Gas Central Heating No Chain & close to the Promenade Large.
Real Estate Principles and Practices Chapter 15 Property Management © 2014 OnCourse Learning.
Presented By: Wanda T. Lindstrand 4757 Highway 17 Bypass ∙ Myrtle Beach, SC What You Need to Know About… FHA 203(k) Rehabilitation Loans.
Housing and Interior Design Mrs. Dollard.  The recorded weather conditions of a region which are determined by temperature and meteorological changes.
How to build a two storey house
Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Three manufacturing costs Direct material cost: Consist of all those material that can be identified with a specific product. Example: wood used in manufacturing.
Training on Financial Management for Fiscal and Asset Managers Technical Assistance for Community Services and Housing Development Center April 2, 2008.
Estate Policy.  When GRIDCo was formed, there was the need to manage and maintain the company’s properties in a manner which would support its operational.
Life Cycle Assessment of a New Zealand house Barbara Nebel & Zsuzsa Szalay Scion.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
General Info Types of Houses Legal Terms Costs of Renting Costs of Buying
Purchasing a Home Copyright 2011© Texas Education Agency. All rights reserved 1.
OVERVIEW Our project is to build a safe efficient, renewable, money saving environment such as an orphanage in a location that is known for natural disasters.
Chapter 5 The Income Statement
HEALTH AND SAFETY IN THE HOME POLICY JULY HEALTH AND SAFETY AT HOME POLICY Why do we have this Policy? In order to make sure our properties are.
United Nations Workshop on Revision 3 of Principles and Recommendations for Population and Housing Censuses and Evaluation of Census Data, Amman 19 – 23.
FOR SALE 132 Park Road Blackpool Lancs FY1 4ES 3 Bedrooms Rear porch/ conservatory PVCu Double Glazing Gas Central Heating Price: £74,950 Middle Terraced.
And get it fixed up the way YOU want it… Homes needing at least $5000 in repairs Property values are higher than sale price Homebuyer qualifies for.
National Landlords Association NLA NEWS and UPDATE Joanne Dron.
Real Estate Principles and Practices Chapter 15 Property Management © 2010 by South-Western, Cengage Learning.
Customer Committee 21 st October 2015 ASSET MANAGEMENT STRATEGY Debbie Whitfield Head of Property Services.
Buildings Insurance How to work out your Sums Insured Working out your Buildings Sum Insured Your home is probably the most valuable asset and you need.
Mobile Working For Housing Repairs and Maintenance Mick Roberts Repair Operations Manager Ongo Homes.
Housing Capital Programme. How is work identified? Stock Condition Survey Structural Surveys Life-cycle replacement Proposals from Area Housing Teams.
AUSTERVILLE RECTIFICATION PROJECT. PROJECT DETAILS 1148 OF DWELLINGS TO BE RECTIFIED BUDGETED AT R / UNIT TOTAL BUDGET R 96 million EXPECTED.
Building pride in Cumbria Do not use fonts other than Arial for your presentations WELCOME Cumbria County Council Supplier Engagement Events Roundthorn.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
South Tyneside Homes The Decent Homes Programme January 2007.
St Mary’s House Lutterworth Extra care housing for older people Our service - Sally Taylor.
Preparing For A REAC Inspection Presented by: Patrick Ortiz Lead Housing Programs Analyst New Mexico Mortgage Finance Authority (505)
504 Home Repair and Rehab Loans and Grants & 502 Direct Loan Program.
The Design Team Carl James.
Principal Officer Housing Strategy & Standards
Purchasing a Home.
Feasibility.
Estimating Project Costs
NOAC CCMA GOOD PRACTISE IN LOCAL GOVERNMENT Housing Reletting System
Electrical Gas Plumbing Heating & Cooling
COST PLANNING AND ESTIMATION
Pre-Contract Cost Control
Urang is a leading company specialize in the management and maintenance of residential and commercial property and blocks. Its years of experience and.
What is a 203K Loan? An FHA Rehabilitation Mortgage (Average 203K rehab is $7,500) First Lien Position Owner Occupied Assumable.
Municipal Efforts for Urban Renewal and Development of Cities
NOAC CCMA GOOD PRACTISE IN LOCAL GOVERNMENT Housing Reletting System
Designing the tiny house
20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
Production account THE CONTRACTOR IS ACTING UNDER A FRAMEWORK CONTRACT CONCLUDED WITH THE COMMISSION.
145 Main Street, Burton Joyce, Nottingham
Hardwick Park Farm, Hardwick Estate, Norwood
Municipal Efforts for Urban Renewal and Development of Cities
Presentation transcript:

The NHF Schedule of Rates in modern procurement practice David Miller Rand Associates

Where We are and Where We Want to Be Where we are now with the NHF Schedule of Rates - Version 5.1 Background Existing Content Inclusive Nature Rates and Adjustments Does it cover all the Stock Use in Procurement The Future - What do we want for Version 6

Background Developed from the requirements of 8 RSL members of the Hammer SW Group Now has: 328 Housing Associations 53 Local Authorities 347 in England, 21 in Wales, 6 In Scotland, 7 in Northern Ireland

Existing Format Three Levels of Description Property Record File Description (short) 1 line up to 50 characters Works Order Description (medium) 4 lines up to 50 characters each line Tender Purposes Description (long) 12 lines up to 50 characters each line

Existing Content 1 ELEMENTS Foundations External Works Fencing & Gates Drainage Brickwork Masonry Roofing Scaffolding Joinery

Existing Content 2 ELEMENTS Plasterwork Floor and Wall Tiling and Sheet Flooring Painting Cleaning & Clearance Glazing Plumbing Heating & Gas Appliances Electrical Disabled Works Special Treatments

Existing Content 3 FORMAT Elements reflect Trade Preamble sections Some Sections are repeated in more than one element Bath panels in Joinery and Plumbing Bathroom Ancillaries in Joinery and Plumbing Showers in Plumbing and Electrical Some solid fuel items both in Brickwork and Heating Special Treatment Elements incorporates: Mould Treatment Timber Treatment Chemical DPC Treatment Pest Control Artex Removal

Existing Content 4 PRIORITIES: E Emergency Works U Urgent Works R Routine Works X User Defined

Inclusive Nature Each item in SOR is intended to represent the entire work content of the particular repair and or maintenance item ordered and the Contractor’s percentage adjustment is deemed to include for all ancillary items not specifically referred to on the description of the SOR item but which are necessary to achieve the satisfactory repair or renewal.

Rates and Adjustments All Labour, Materials, Plant And Transport. Overheads and Profit Removal of Contractor’s Debris Means of Access up to Two Storey ridgeline First Time Fix- adequate van stocks etc Empowerment of operatives on variations

Does it cover all the Stock? -1 General Needs Sheltered Supported Housing Student/NHS Staff Accommodation Market Rent Schemes Leasehold/Shared Owner Liabilities Estate works Care and Repair Schemes

Does it cover all the Stock? - 2 The need to cover all stock types, the components of 400+ subscribers and cater for: Responsive Day to Day Void property/change of tenancy Package/minor planned works Decent Homes works Emergency works Results in a current library of 2900 items

Use in Procurement – Primary Means of Payment Traditional format with % adjustment Partnering traditional identifying profit/head office overheads and % adjustment Partnering identifying profit/head office overheads, preliminary costs and % adjustment

Use in Procurement – Secondary Means of Payment Payment on basis of fixed rate per order, reconciled on a periodic basis back to SOR Payment on basis of fixed value per dwelling with SOR being used to reimburse works to Voids, High Value works orders, communal clearance, Tenant recharge works etc

Use in Procurement – As a Monitoring tool Open book accounting reconciled back to SOR to establish whether best value is being achieved Record of what work has been undertaken

Use in Procurement – Other Uses? Before we move on to looking at what the format and content of version 6 should be, have any of you had experience of using the NHF SOR in other methods of procurement?

Version 6 - 1 Should we separate Responsive Day to Day and Voids Should we separate the most frequently incurring items from those less used but still required. Should we separate repairs from renewals. Trade or Elemental format e.g all works associated with bathrooms or solid fuel appliances in their own section regardless of trade involvement.

Version 6 - 2 How much rationalisation: Any Others ?? have all windows measured in sq metres regardless of numbers of opening and fixed lights, size etc have all glazing msd in sq metres regardless of pane size have a standard cost for redecorating rooms with variances in specification applied by % add assume that all ‘old’ components like metal windows, cast iron gutters etc have been renewed with modern products One standard void item covering all the prime basic works done on void eg lock change, gas and electric tests, pre-occupation check, condition inspection, change wc seat, overhaul taps, cistern etc. Any Others ??

It’s over to you now Version 6 - 3 What else would you like to see in Version 6 It’s over to you now