Project Athena Workshop – 7-8 June 2010 - ECMWF Jim Kinter – Project Overview Team Workshop 7-8 June 2010 ECMWF – Reading, UK Project Athena: Overview.

Slides:



Advertisements
Similar presentations
Project Minerva Workshop COLA at George Mason University September 2013.
Advertisements

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Center for Computational Sciences Cray X1 and Black Widow at ORNL Center for Computational.
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
IBM 1350 Cluster Expansion Doug Johnson Senior Systems Developer.
The Role of High-value Observations for Forecast Simulations in a Multi- scale Climate Modeling Framework Gabriel J. Kooperman, Michael S. Pritchard, and.
From Athena to Minerva: A Brief Overview Ben Cash Minerva Project Team, Minerva Workshop, GMU/COLA, September 16, 2013.
Scientific Advisory Committee – April 2010Jim Kinter - COLA Overview Proposal Scientific Advisory Committee Meeting 12 April 2010.
Resolution and Athena – some introductory comments Tim Palmer ECMWF and Oxford.
Climatology and Climate Change in Athena Simulations Project Athena Team ECMWF, June 7, 2010.
Scientific Grand Challenges Workshop Series: Challenges in Climate Change Science and the Role of Computing at the Extreme Scale Warren M. Washington National.
Preliminary Results from Project Athena Project Athena Team Presentation to the COLA Scientific Advisory Committee April 12, 2010 Very (Major Computing.
Project Athena Overview Project Athena: Origins  The World Modeling Summit (WMS) in May 2008 called for a revolution in climate modeling to more rapidly.
Blocking in the ECMWF model: Sensitivity to resolution and model physics Antje Weisheimer Thomas Jung Tim Palmer.
What is a climate model?. Substitutes for reality Closely mimics some essential elements Omits or poorly mimics non-essential elements What is a Model?
SC November 2013 Ben Cash, COLA From Athena to Minerva: COLA’s Experience in the NCAR Advanced Scientific Discovery Program Animation courtesy.
NCEP Central Operations Capabilities “Where America’s Climate, Weather, Ocean, and Space Prediction Services Begin” Brent Gordon NCEP/NCO/Systems Integration.
EGU 2011 TIGGE, TIGGE LAM and the GIFS T. Paccagnella (1), D. Richardson (2), D. Schuster(3), R. Swinbank (4), Z. Toth (3), S.
Grid for Coupled Ensemble Prediction (GCEP) Keith Haines, William Connolley, Rowan Sutton, Alan Iwi University of Reading, British Antarctic Survey, CCLRC.
Improvement of extreme climate predictions from dynamical climate downscaling Yang Gao 1, Joshua S. Fu 1, John B. Drake 1, Yang Liu 2, Jean-Francois Lamarque.
Open Science Grid For CI-Days Internet2: Fall Member Meeting, 2007 John McGee – OSG Engagement Manager Renaissance Computing Institute.
National Weather Service National Weather Service Central Computer System Backup System Brig. Gen. David L. Johnson, USAF (Ret.) National Oceanic and Atmospheric.
Larry Marx and the Project Athena Team. Outline Project Athena Resources Models and Machine Usage Experiments Running Models Initial and Boundary Data.
Information Technology at Purdue Presented by: Dr. Gerry McCartney Vice President and CIO, ITaP HPC User Forum September 8-10, 2008 Using SiCortex SC5832.
The Climate Prediction Project Global Climate Information for Regional Adaptation and Decision-Making in the 21 st Century.
Scientific Advisory Committee – April 2010Jim Kinter - COLA Collaborations Collaborations Scientific Advisory Committee Meeting 13 April 2010.
Status of RSA LAPS/MM5 System Sustainment John McGinley, Steve Albers*, Chris Anderson*, Linda Wharton NOAA Earth System Research Laboratory Global Systems.
The Red Storm High Performance Computer March 19, 2008 Sue Kelly Sandia National Laboratories Abstract: Sandia National.
What is a Climate Model?.
Jaguar Super Computer Topics Covered Introduction Architecture Location & Cost Bench Mark Results Location & Manufacturer Machines in top 500 Operating.
Office of Science Office of Biological and Environmental Research DOE Workshop on Community Modeling and Long-term Predictions of the Integrated Water.
ARGONNE NATIONAL LABORATORY Climate Modeling on the Jazz Linux Cluster at ANL John Taylor Mathematics and Computer Science & Environmental Research Divisions.
Geosciences - Observations (Bob Wilhelmson) The geosciences in NSF’s world consists of atmospheric science, ocean science, and earth science Many of the.
Modern Era Retrospective-analysis for Research and Applications: Introduction to NASA’s Modern Era Retrospective-analysis for Research and Applications:
11 Predictability of Monsoons in CFS V. Krishnamurthy Center for Ocean-Land-Atmosphere Studies Institute of Global Environment and Society Calverton, MD.
IDC HPC USER FORUM Weather & Climate PANEL September 2009 Broomfield, CO Panel questions: 1 response per question Limit length to 1 slide.
3 rd Annual WRF Users Workshop Promote closer ties between research and operations Develop an advanced mesoscale forecast and assimilation system   Design.
Adrianne Middleton National Center for Atmospheric Research Boulder, Colorado CAM T340- Jim Hack Running the Community Climate Simulation Model (CCSM)
- Vendredi 27 mars PRODIGUER un nœud de distribution des données CMIP5 GIEC/IPCC Sébastien Denvil Pôle de Modélisation, IPSL.
Cyberinfrastructure What is it? Russ Hobby Internet2 Joint Techs, 18 July 2007.
ESG Observational Data Integration Presented by Feiyi Wang Technology Integration Group National Center of Computational Sciences.
COST 723 WORKSHOP – SOFIA, BULGARIA MAY 2006 USE OF RADIOSONDE DATA FOR VALIDATION OF REGIONAL CLIMATE MODELLING SIMULATIONS OVER CYPRUS Panos Hadjinicolaou.
Cray Environmental Industry Solutions Per Nyberg Earth Sciences Business Manager Annecy CAS2K3 Sept 2003.
The evolution of climate modeling Kevin Hennessy on behalf of CSIRO & the Bureau of Meteorology Tuesday 30 th September 2003 Canberra Short course & Climate.
PSC’s CRAY-XT3 Preparation and Installation Timeline.
TeraGrid Quarterly Meeting Arlington, VA Sep 6-7, 2007 NCSA RP Status Report.
1 NSF/TeraGrid Science Advisory Board Meeting July 19-20, San Diego, CA Brief TeraGrid Overview and Expectations of Science Advisory Board John Towns TeraGrid.
Tropical Cyclones in IFS and NICAM Julia V. Manganello Center for Ocean-Land-Atmosphere Studies (Many thanks to Kevin Hodges!) Athena Workshop, 7-8 June.
Cyberinfrastructure: Many Things to Many People Russ Hobby Program Manager Internet2.
Welcome to the PRECIS training workshop
One-year re-forecast ensembles with CCSM3.0 using initial states for 1 January and 1 July in Model: CCSM3 is a coupled climate model with state-of-the-art.
NICS Update Bruce Loftis 16 December National Institute for Computational Sciences University of Tennessee and ORNL partnership  NICS is the 2.
Of what use is a statistician in climate modeling? Peter Guttorp University of Washington Norwegian Computing Center
RIME A possible experiment for Advancing Antarctic Weather Prediction David H. Bromwich 1, John J. Cassano 1, Thomas R. Parish 2, Keith M. Hines 1 1 -
Presented by LCF Climate Science Computational End Station James B. White III (Trey) Scientific Computing National Center for Computational Sciences Oak.
Wide Band Power and Harmonic Amplitude of Precipitation Alex Ruane John Roads Scripps Institution of Oceanography / UCSD Ramat Gan, Israel: July, 2006.
Climate-SDM (1) Climate analysis use case –Described by: Marcia Branstetter Use case description –Data obtained from ESG –Using a sequence steps in analysis,
Slide 1 CLOUDS AND STORMS PROJECT ATHENA Very high resolution global climate simulations with the ECMWF model Martin Miller ECMWF (Acknowledgements to.
Scheduling a 100,000 Core Supercomputer for Maximum Utilization and Capability September 2010 Phil Andrews Patricia Kovatch Victor Hazlewood Troy Baer.
NOAA Vision and Mission Goals Pedro J. Restrepo, Ph.D., P.E. Senior Scientist, Office of Hydrologic Development NOAA/NWS First Q2 Workshop (Q2 - "Next.
PEER 2003 Meeting 03/08/031 Interdisciplinary Framework Major focus areas Structural Representation Fault Systems Earthquake Source Physics Ground Motions.
Northwest Indiana Computational Grid Preston Smith Rosen Center for Advanced Computing Purdue University - West Lafayette West Lafayette Calumet.
TEMPLATE DESIGN © H. Che 2, E. D’Azevedo 1, M. Sekachev 3, K. Wong 3 1 Oak Ridge National Laboratory, 2 Chinese University.
INTRODUCTION TO XSEDE. INTRODUCTION  Extreme Science and Engineering Discovery Environment (XSEDE)  “most advanced, powerful, and robust collection.
SCEC Capability Simulations on TeraGrid
Climate , Climate Change, and climate modeling
Climate Models Current News and Weather
Modeling the Atmos.-Ocean System
Science Objectives contained in three categories
Data Curation in Climate and Weather
Presentation transcript:

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Team Workshop 7-8 June 2010 ECMWF – Reading, UK Project Athena: Overview

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Project Athena  NSF impetus: Supercomputer availability and interest in outcome of 2008 World Modeling Summit  Hypothesis: Exploring high spatial resolution and process- resolving models can dramatically alter simulation of climate  COLA role: formed and led an international collaboration involving over 30 people in 6 groups on 3 continents  Two state-of-the-art global AGCMs at the highest possible spatial resolution  Dedicated supercomputer at NICS for Oct’09 – Mar’10  Data ~900 TB total  Long term - model output data will be invaluable for large community of climate scientists (unprecedented resolution and simulation duration) and computational scientists (lessons learned from running dedicated production at nearly petascale)

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Revolutionizing Climate Modeling 2008 World Modeling Summit Established Requirements for Climate Change Modeling: Dedicated High-End Computing International Collaboration Apologies to Eugene Delacroix

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Origin of Project  The World Modeling Summit (WMS) in May 2008 at ECMWF called for revolution in climate modeling to more rapidly advance improvement in climate model resolution, accuracy and reliability  The WMS recommended petascale supercomputers dedicated to climate modeling at at least 3 international facilities  Dedicated petascale machines are needed to provide enough computational capability and a controlled environment to support long runs and the management and analysis of very large (petabyte) data sets  The U.S. National Science Foundation, recognizing the importance of the problem, realized that a resource (Athena supercomputer) was available to meet the challenge of the World Modeling Summit and offered to dedicate the Athena supercomputer over a six-month period in  An international collaboration was formed among groups in the U.S., Japan and the U.K. to use Athena to take up the challenge

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Science Goals Hypothesis: Increasing weather and climate model resolution to accurately resolve mesoscale phenomena in the atmosphere (and ocean and land surface) can dramatically improve the fidelity of the models in simulating the mean climate, the variances and covariances, and the representation of extreme events (already demonstrated that it improves the fidelity of cloud systems). Hypothesis: Simulating the effect of increasing greenhouse gases on regional aspects of climate, especially extremes, may, for some regions, depend critically on the spatial resolution of the climate model. Hypothesis: Explicitly resolving important processes in the atmosphere (and ocean and land surface), without parameterization, can even further improve the fidelity of the models, especially in describing the regional structure of weather and climate.

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview COLA - Center for Ocean-Land-Atmosphere Studies, USA (NSF-funded) ECMWF - European Center for Medium-range Weather Forecasts, UK JAMSTEC - Japan Agency for Marine-Earth Science and Technology, Research Institute for Global Change, Japan University of Tokyo, Japan NICS - National Institute for Computational Sciences, USA (NSF-funded) Cray Inc. Collaborating Groups Codes NICAM: Nonhydrostatic Icosahedral Atmospheric Model IFS: ECMWF Integrated Forecast System Supercomputers Athena: Cray XT quad-core Opteron nodes (18048) #30 on Top500 list (November 2009) – dedicated Oct’09 – Mar’10 Kraken: Cray XT dual hex-core Opteron nodes (99072) #3 on Top500 list (November 2009) replaced Athena – allocation of 5M SUs

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Many Thanks To … ECMWF –Mats Hamrud –Thomas Jung –Martin Miller –Tim Palmer (co-PI) –Peter Towers –Nils Wedi NICS –Phil Andrews (co-PI) –Troy Baer –Matt Ezell –Christian Halloy –Dwayne John –Bruce Loftis –Kwai Wong Cray –Pete Johnsen –Per Nyberg JAMSTEC/U. Tokyo –Chihiro Kodama –Masaki Satoh (co-PI, U. Tokyo) –Hirofumi Tomita (co-PI, JAMSTEC) –Yohei Yamada NSF –AGS: Jay Fein –OCI: Steve Meacham, Rob Pennington COLA  Emilia Jin  Jim Kinter (PI)  Larry Marx  Julia Manganello  Cristiana Stan  Tom Wakefield  Deepthi Achutavarier  Jennifer Adams  Eric Altshuler  Ben Cash  Paul Dirmeyer  Bohua Huang

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview National Institute for Computational Sciences University of Tennessee and ORNL partnership NICS is funded by the National Science Foundation, is located at Oak Ridge National Lab, and is managed by the University of Tennessee NICS operates the first academic petascale supercomputer in the world Leverages the capabilities of the ORNL computing complex Managed by UT-Battelle for the Department of Energy

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview NICS and Athena NICS provides and supports computational resources for academic researchers: Cray XT5 and XT4, SGI UltraViolet for visualization and data analysis, CPU-GPU cluster, scratch and archival storage, … The Cray XT4 – Athena – the first NICS machine in 2008 –Replaced by Cray XT5 – Kraken – in March 2009 – gigabytes RAM & 1 AMD 2.3 GHz quad- core processor –17.6 terabytes aggregate memory & 18,048 cores –165 teraflops peak performance – Other resources: 85 TB Lustre file system, 258 TB auxilliary file system (called Nakji) and a 5-node 16-core 128 GB RAM system (called Verne) to help with data management

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview NICS Support for COLA Team The Athena project by COLA received an extraordinarily high- level of direct support. –Contract with Cray provided hardware support during business hours. –NICS systems staff (Matt and Rick) and computational science staff (Kwai, Christian, Dwayne) attentive almost 24/7. –NICS management and staff were committed to making this project a success. – COLA was our partner not our customer. Direct support was smoother because the COLA team was so well prepared for the challenges.

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Precision NICS Athena Support Team

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Production Computing Supporting a single project on Athena provided some flexibility not otherwise available. NICS could change priorities and queuing parameters to be more effective. Supercomputer Tetris Problem: keeping the scheduler busy running 2 codes and using extra nodes for post- processing. COLA and ECMWF staff used ~70M hours over 6 months on Athena – out of a total of ~79M hours over the period. Athena has been very reliable.

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview NICS Lessons Learned Dedicated usage of a relatively big supercomputer greatly enhances productivity Dealing with only a few users and their requirements allows for more efficient utilization Challenge: Dedicated simulation projects like Project Athena can generate enormous amounts of data to be archived, analyzed and moved around. NICS (and TeraGrid) do not currently have enough storage capacity. Data management is a big challenge and should be studied carefully. Preparation time: 2 or 3 weeks at least are needed before the beginning of dedicated runs to test and optimize the codes and to plan strategies for optimal use of the system. Communication throughout the project is essential: (weekly telecons, lists, personal calls, …) Project Athena was a valuable experience, demonstrating the value of developing good teamwork practices - COLA was our partner not our customer. NICS has submitted a proposal to NSF for continued funding to support computing on Athena.

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Athena Experiments

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Public Sharing of Athena Data via ESG NSF requires that data must eventually be publicly available The Earth System Grid (ESG) is a network of data nodes and gateways at national labs and research centers in the US that collectively allow secure access to massive distributed data sets ESG can publish data that reside on tape under HPSS ESG also provides “Extending Services” (metadata search, subsets, server-side analysis, etc.) ESG Services are currently limited to data on spinning disk in CF-compliant NetCDF format Discussions have begun to serve a small subset of Athena data on a trial basis

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Selected Results Kinetic energy spectra QBO Resolution dependence of snow NICAM simulation (21 May – 31 August 2009)

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Global Kinetic Energy Spectra of High Resolution Models Observations suggest that the globally integrated kinetic energy spectrum of the atmosphere has two “regimes”, one for synoptic scales (~ km), and one in the mesoscales (~ km). If the globally integrated kinetic energy E ke is given as: where k is the magnitude of the dimensional wavenumber, then E(k) ~ k -3 for the synoptic range E(k) ~ k -5/3 for the mesoscale range (in general E(k) ~ k -n ) Some controversy exists about this result: - the observations are not straightforward to interpret - there is no satisfactory theory explaining both regimes - models/ reanalyses don’t get precisely n = -3 and -5/3 Courtesy David Straus

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Aircraft observations showing spectra of wind components and T, plotting log(E) vs. log(k), so that the slope of the straight lines indicate the exponent n in the previous slide. Courtesy David Straus

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Preliminary Results from NICAM and IFS T1279 -One NICAM run JJAS One IFS T1279 run JJAS 1981 (from Nov 1980 start) Results likely to be sensitive to inter-annual variability: - spectra of stationary (time-mean) flow (not shown) - spectra of transient flow at large scales (small wavenumbers; not shown) Results not likely to be sensitive to inter-annual variability: - spectra of transient flow at synoptic and smaller scales (see next slide) - estimated slope n of spectra at synoptic and smaller scales Courtesy David Straus

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Energy Spectra (analysis at T512 - smaller scales show mostly dissipation) Transient with periods less than 8 days: Black IFS Blue NICAM Transients with periods greater than 8 days: Green IFS Red NICAM Note how NICAM has much more energy at smaller scales!! High frequency energy dominates for both models Log(k) Courtesy David Straus Log(EKE-divergent) Log(EKE-rotational) Log(k)

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Least squares fit to slope, n (E(k) ~ k -n ) (analysis at T512 - smaller scales show mostly dissipation) Transient with periods < 8 days: Black IFS Blue NICAM Transients with periods > 8 days: Green IFS Red NICAM NICAM shows two spectral regimes for dominant transients (periods < 8 days): n=2.8 in synoptic range, n=2.3 in mesoscale range. IFS shows only one spectral regime for black curve. Log(k) Slope(EKE-divergent) Slope(EKE-rotational) Log(k) Courtesy David Straus

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview KE Spectra - Tentative Conclusions (1)IFS T1279 and NICAM both dissipative for scales less than those resolved by T512 (2)NICAM has greater divergent and rotational kinetic energy for small scales, for transients of either time scale (3)The dominant transient energy – high frequency rotational kinetic energy (periods < 8 days) shows two regimes in NICAM (although the slopes are not the classical n = 3 and n = 5/3). This is not the case in IFS. (4) Low frequency flow (periods > 8 days) also shows interesting behavior (5)Importance of non-hydrostatic dynamics Courtesy David Straus

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Quasi-Biennial Oscillation Zonal Mean Zonal Wind (5S-5N) Anomaly IFS T159Rean-2IFS T1279

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Quasi-Biennial Oscillation Zonal Mean Zonal Wind (5S-5N) Mean Annual Cycle IFS T159Rean-2IFS T1279

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview IFS JFM Mean Snow Depth CONUS Transect at 40 N Interpolated high-resolution agrees with native T159 Orographic features are not represented

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview Reduced Native Decreasing Resolution Biases Distribution

Project Athena Workshop – 7-8 June ECMWF Jim Kinter – Project Overview May Tropical Cyclone Aila 23May09 25May09 21May09 Single case example: NICAM simulation accurately predicted development, evolution and track of TC Aila over 5-day period