N. Dos Santos1 TX54 Mobile Shielding Door 106th CEMESTE – 13.06.07 N. Dos Santos/ TS-LEA Floor steel plates and anchors system Chassis assembly Chassis.

Slides:



Advertisements
Similar presentations
Unit 5 Steel Frame Construction
Advertisements

An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
Advanced Construction Technology
Concrete Pre Cast Panel By Peter Spence ID:
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
1 Installation of Delphi Frame  ITS Installation.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
Rectangular framed structures
Chapter 19 Floors.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
EDMS Nr /02/ tons, Platform – Q = daN, aprox. length to cover 4 m Cabling Groove – Q = 500 daN, aprox.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Wall Framing Grimsby Secondary School Technology Dept.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Refurbished Booster RF John Reid October 24, 2012.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Technical Specification Handling Engineering Group.
LHCb Radiation Shielding Wall – Status Wall Description Front Part 1 Aprox. 6 m Front Part 2 Aprox. 6.6 m Labyrinth.
LHCb Radiation Shielding Wall – Lifting Tool Overview.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
C-shaped steel beam pulley cable pulley lifting and installation work status.
SUBJECT - Technical Terms OF Doors And Types Of Doors.
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a.
Keep Your Home Grounded With Expert Answers to Your Foundation Repair Questions.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Gonzales Iron Works Custom Steel Awnings Austin TX
Gonzales Iron Works Custom Metal Fabrication Austin TX
SX1 manipulation VERSION 1 Version
Escalator Installation
MICE Partial Return Yoke Mechanical Design
SBS- Counterweight Support and Magnet Assembly - Status
VIEW SERIES Track Assembly & Installation
CE Status: Activities executed until 03/08 and ongoing
TAS at IP1 Present situation and plans
EHN1 Neutrino Installation Plans
LCD Splicing Screens Wall-mounted Guide
Far Detector Activities Late 2017 – Early 2018
BASEPLATES SLIDE SHOW.
The Garage Assembly Instruction By Laser Dollhouse Designs
Operations, Risks & Hazards
STEEL PLATES.
Reader Swap out Guide.
Senad Kudumovic Design engineer
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Neutron guide Shielding Concept
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Presentation transcript:

N. Dos Santos1 TX54 Mobile Shielding Door 106th CEMESTE – N. Dos Santos/ TS-LEA Floor steel plates and anchors system Chassis assembly Chassis concreting Concrete blocks installation and survey

N. Dos Santos2 TX54

N. Dos Santos3 What is TX54 Mobile Shielding Door? 1 chassis (20T of steel) 4 airpads (125T each) 20 m rail for chassis guiding 12m3 of concrete (inside chassis) 14 pre-fabricated concrete blocks 3m x 4.3m x 7m, 250T 2 tirfor and anchors system

N. Dos Santos4 TX54 Door – Floor plates and anchors 6mm steel plates, fixed to floor and welded together for airpads

N. Dos Santos5 TX54 Door – Floor plates and anchors Wall and floor anchors Trifor will move the 250t door with airpads

N. Dos Santos6 TX54 – Chassis Assembly 2 weeks assembly by Pakistan team - IHEP

N. Dos Santos7 TX54 – Chassis Assembly Assembly at bottom of PM54 shaft

N. Dos Santos8 TX54 – Shimming and rail installation Shimming done between airpads and chassis feet

N. Dos Santos9 TX54 – Chassis Concreting Concreting done by TS-CE contractor (Scrasa)

N. Dos Santos10 TX54 – Chassis Concreting 12m3 of concrete – 10 trips with SDX5 overhead crane

N. Dos Santos11 TX54 – Chassis Concreting Concrete drying

N. Dos Santos12 Airpads connections Movement test, this week Survey to be done with chassis under shaft and on it’s final position 12 pre-fabricated concrete blocks delivered and installed on chassis, 25th June (14T each block), with survey 2 last blocks delivered end of July Door movement with all blocks TX54 – Next steps… 12m3 of concrete – 10 trips with SDX5 overhead crane