Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss COSMO STC Report Lugano, 13th of September 2012 Philippe.

Slides:



Advertisements
Similar presentations
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss COSMO STC Report Sibiu, 5th of September 2013 Philippe.
Advertisements

1 National Institute of Meteorology Brazil - INMET The NWP System at INMET COSMO Model Gilberto Ricardo Bonatti Antônio Cardoso Neto REUNIÓN DE EXPERTOS.
Di1a: 1 UFFICIO GENERALE PER LA METEOROLOGIA Short term plans of activities related to NWP at UGM Zurich Sept Massimo Ferri.
Slide 1 EUMETNET SRNWP Interoperability Workshop 2008 Slide 1 Interoperability with regard to Boundary Conditions Alfred Hofstadler Meteorological Applications.
Francesca Marcucci, Lucio Torrisi with the contribution of Valeria Montesarchio, ISMAR-CNR CNMCA, National Meteorological Center,Italy First experiments.
Short-Range NWP Programme 13th SRNWP Meeting 11 October 2006 Zurich (Switzerland)
Expert Team on System Aspects and Interoperability Programme Glenn Greed, UKMO, Project Manager Interoperability Ulrich Schättler, DWD, Chairman of the.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
COSMO GM2013.E.Astakhova,D.Alferov,A.Montani,etal The COSMO-based ensemble systems for the Sochi 2014 Winter Olympic Games: representation and use of EPS.
Interoperability between the European NWP modelling systems Ulrich Schättler, François Bouttier, Xiaohua Yang, Radmila Brozkova, Alan Radford A Report.
Numerical Weather Prediction at DWD COSMO-EU Grid spacing: 7 km Layers: 40 Forecast range: 78 h at 00 and 12 UTC 48 h at 06 and 18 UTC 1 grid element:
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
Summary of MAP D-PHASE Strategy and Requirements MAP D-PHASE / Olympics Project Meeting 6 February 2006 Prepared by: Ron McTaggart-Cowan.
10° COSMO GENERAL MEETING Plans and State of Art at USAM/CNMCA Massimo Ferri.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss High-resolution data assimilation in COSMO: Status and.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Operational COSMO Demonstrator OPCODE André Walser and.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss News from COSMO COSMO User Workshop 2010.
9° General Meeting Adriano Raspanti - WG5. 9° General MeetingAthens September Future plans CV-VerSUS project future plans COSI “The Score” new package.
COSMO Priority Project CORSO “ C onsolidation of O peration and R esearch results for the S ochi O lympic Games” General Meeting 2011.
Status of COSMO Software and Documentation Ulrich Schättler Deutscher Wetterdienst COSMO Annual Meeting 2003.
Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
SPM review COSMO General Meeting, 13 September 2012.
COSMO Priority Project CORSO “ C onsolidation of O peration and R esearch results for the S ochi O lympic Games”
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss PP VERSUS2 Status Report VERSUS Meeting 04/03/2010, Langen.
A. Montani. - COSMO-LEPS for Sochi 2014 Development of a LAM-EPS system for Sochi Winter Olympics Andrea Montani C. Marsigli, T. Paccagnella ARPA-SIMC.
WG4: Sibiy, 2 September 2013 COSMO Project CORSO: Consolidation of Operational and Research results for the Sochi Olympics Status COSMO.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss SPM report / Science Plan COSMO General Meeting, 10 September.
1 Short Report of 28 th Meeting of the COSMO Steering Committee (STC) Rome, 5 September 2011 Detlev Majewski, Head of STC Deutscher Wetterdienst, Offenbach,
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz First Experience with KENDA at MeteoSwiss Daniel Leuenberger,
Status of the COSMO-Model Package Ulrich Schättler.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Quantitative precipitation forecast in the Alps Verification.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of MeteoSwiss 18 September 2008 COSMO GM 2008.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 3: Overview status report COSMO General Meeting, 19.
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
Status of the COSMO-Software and Documentation WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache, Bogdan Maco National Meteorological Administration of Romania.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Science Plan, PPs, PTs, and more … COSMO General Meeting,
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of the COSMO-1 configuration at MeteoSwiss Guy.
A.Montani; The COSMO-LEPS system. Recent developments and plans for the COSMO-LEPS system Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate.
Bogdan Rosa 1, Marcin Kurowski 1 and Michał Ziemiański 1 1. Institute of Meteorology and Water Management (IMGW), Warsaw Podleśna, 61
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Aerosols and Climate Processes, Institute.
Activities of the new WG7 Chiara Marsigli. WP Development of COSMO-LEPS Maintenance and updates of the operational suite at ECMWF (A. Montani) Study,
Philippe Steiner, MeteoSwiss COSMO General Meeting September 22th, 2005 Plans of MeteoSwiss for next year.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of the COSMO-1 configuration at MeteoSwiss Guy.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Ensemble activites and plans at MeteoSwiss André Walser.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE: IMGW in COSMO AUTHOR: Michał Ziemiański DATA:
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache National Meteorological Administration of Romania.
New task within PT Support Activities “Support of COSMO licensees”
Report from the Scientific Project Manager
Overview on the Work of WG 6
Responsible member: Hungarian Meteorological Service Period:
Summary of WG6 activities
“Consolidation of the Surface-to-Atmosphere Transfer-scheme: ConSAT
Jerusalem, 14th of September 2017 Andrzej Wyszogrodzki
Meteorological applications and numerical models becoming increasingly accurate Actual observing systems provide high resolution data in space and time.
20th COSMO General Meeting, 3-7 September 2018, St. Petersburg, Russia
COSMO GENERAL MEETING HELLENIC NATIONAL METEOROLOGICAL SERVICE (HNMS)
NWP Strategy of DWD after 2006 GF XY DWD Feb-19.
Ulrich Schättler Source Code Administrator
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
Preparing a new Model Version according to Source Code Management
Activities of WG7 Chiara Marsigli.
NWP Test Suite: some updates
Presentation transcript:

Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss COSMO STC Report Lugano, 13th of September 2012 Philippe Steiner

2 COSMO GM 2012 meeting | Lugano, th STC meeting on 10th/11th Sept. Participants: P. Steiner (Switzerland, chair) D. Majewski (Germany) A. Raspanti (Italy) T. Tzeferi (Greece) G. Stancalie (Romania) D. Kiktev (Russia) M. Ziemianski (SPM) Excused: R. Bakowski (Poland), replaced by M. Ziemianski

3 COSMO GM 2012 meeting | Lugano, Decisions (1) Approved the version 1.1 of the COSMO Standards for Source Code Development (source code management) Approved the latest version of the PP plan KENDA Approved the task 1 and the new PP plan CORSO Asked for a reworking of the PP plan VERSUS2 Realistic plan to implement all necessary features enabling the replacement of existing tools by VERSUS Prepare the maintenance of VERSUS afterwards Setup mechanisms and train the involved people

4 COSMO GM 2012 meeting | Lugano, Decisions taken (2) Approved the new PP plan POMPA Extension until End of 2014 No prolongation of PP UTCS and PT Mire PP CELO approved (COSMO-EULAG Operationalisation) PL Zbigniew Piotrowski (IMGW) – PP CALMO approved (Calibration of COSMO Model) PL Antigoni Voudouri (HNMS) – PP ConSAT (Consolidation of Surface Atmosphere Transfer) and PT NWP Test Suite discussed

5 COSMO GM 2012 meeting | Lugano, Election of new WGC WG3a Federico Grazzini stepping back after nearly 5 years Many thanks! Elected by unanimity: Matthias Raschendorfer (DWD) WG6 Uli Schättler stepping back after about 14 years ! Many many thanks! Uli Schättler remains SCA for COSMO Elected by unanimity: Massimo Milleli (ARPA-Piemonte) Officially in charge from the 15th of September 2012 on

6 COSMO GM 2012 meeting | Lugano, Licensing of COSMO Software Currently 6 licensees 6 more candidates (3 very concretely from June 2013 on) About 20 additional candidates for free license Very good support done by A. Smalla (DWD), C. Barbu and R. Dumidrache (NMA) Time consuming activity because of the lack of good computer (and quite often insufficient English language) skill of the new COSMO users. New COSMO installations in more than 4 countries and interventions in total in 17 countries during 2012.

7 COSMO GM 2012 meeting | Lugano, Map of model distribution until 2012

8 COSMO GM 2012 meeting | Lugano, Licensing of COSMO Software Standard contracts have been agreed: Licensing contract for COSMO for developing countries (to be issued beginning of 2013) Licensing contract for Fieldextra for developing countries Licensing contracts for INT2LM for EUMETNET members Licensing contract for Fieldextra for EUMETNET members (both for the implementation of Interoperability)

9 COSMO GM 2012 meeting | Lugano, New candidate to COSMO Formal application of Israel Meteorological Service to COSMO received the 7th of August 2012 Approval of the directors needed to start the official two years period as applicant

10 COSMO GM 2012 meeting | Lugano, Funded COSMO activities Money from the licenses is dedicated to support the work COSMO in funding, e.g.: visits to COSMO partner (e.g. within a PP/PT) invitation of experts to COSMO meetings/conferences participation of COSMO scienstists to conferences Review of the funded activities showed that the expected effect to intensify the exchanges is insufficient! Don’t forget to make (good) use of this possibility!

11 COSMO GM 2012 meeting | Lugano, Strategy of COSMO member for the next years

12 COSMO GM 2012 meeting | Lugano, Four strategic tasks in the Forecasting Strategy 1.Centralisation / automation (partly) of production of severe weather warnings 2.Integrated forecasting system for nowcasting and very short range forecasting 3.Leading aviation service in Europe 4.Support to renewable energy production DWD Strategy

13 COSMO GM 2012 meeting | Lugano, tasks in Numerical Modelling Strategic Concept, e.g. Task 1:COSMO-DE-EPS Task 2:ICON-EPS Task 4:ICON development Task 5:Shared physics library for ICON and COSMO model Task 6:Regional version of ICON together with COSMO / CLM Task 13:Ensemble data assimilation Task 14:Further development of operational NWP system Task 12:Integrated forecasting system Task 19:Forecasts in the field of renewable energy DWD Strategy

14 COSMO GM 2012 meeting | Lugano, COSMO-1: 8x daily 24 hours forecasts 1 km grid size (convection permitting) Boundary conditions: IFS 10km 4x daily COSMO-E: 2x daily 5 days forecasts 2.2 km grid size (convection permitting) 21 ensemble members Boundary conditions: VarEPS 20km 2x daily Strategy of MeteoSwiss Project COSMO-NExT

15 COSMO GM 2012 meeting | Lugano, Current Status New machine at CSCS providing development capacity Continuous assimilation (nudging) & daily forecast COSMO-1 First setup of KENDA (COSMO-2, identical members)

16 COSMO GM 2012 meeting | Lugano, Italian NWP Strategy Reorganization of Italian Meteorogical Service as National Distributed Meteorological service: Sinergy of existing resources to optimise them: Air Force Met Service, Civil Protection, Regional Met services

17 COSMO GM 2012 meeting | Lugano, Now operational: DA with LETKF based on HRM on Euro-Atlantic area COSMO-ME 7km, 00 & 12UTC runs up to +78 (DA interpolation from LETKF) COSMO-IT 2.8km, 00 & 12UTC runs up to +24 (nudging) Operational near future: DA with LETKF based on COSMO on European area, optimisation of resources converging to DA with KENDA COSMO-ME 7km, 4 runs/day up to +72 / +48 interm. runs (DA from LETKF) COSMO-IT 2.8km, 4 runs/day up to +21 (nudging) (or possibily Rapid update cycle with 8 runs/day) Italian NWP Strategy

18 COSMO GM 2012 meeting | Lugano, Under the hypothesis of CNMCA Supercomputer upgrade (actually 15 Tflops) probably based on hybrid machines CPU/GPU Operational next years: EPS system based on LETKF and COSMO-ME 7km 2 runs/day on Mediterranean area as high resolution EPS EPS system based on COSMO-IT 2.8km, 2 runs/day runs on Italian area as very high resolution EPS In strict collaboration with ARPA Bologna Italian NWP Strategy

19 COSMO GM 2012 meeting | Lugano, Strategy at HNMS Use of COSMO not only for operational weather forecasts but is also applied for: Marine forecasts for small routes between Greek islands WAVE model Support of research institutes and Greek authorities Post processing products for Hellenic Air Force (icing, turbulences etc) Strategy for future work: COSMO-ART COSMO-CLM COSMO-LEPS (to become forecaster-friendly within HNMS) FIELDEXTRA Improve quality/quantity of data for assimilation

20 COSMO GM 2012 meeting | Lugano, Status of COSMO-ART Model successfully compiled and ready to be used, initially only for research purposes. A memorandum with NOA about to be established (National Observatory of Athens) NOA will provide data to HNMS (emissions of pollutants, area -point sources characteristics,…) and HNMS will perform simulations (past cases) Strategy at HNMS

21 COSMO GM 2012 meeting | Lugano, Instytut Meteorologii i Gospodarki Wodnej – PIB Current status: Model runs: COSMO 7km with data assimilation, 4 times per day COSMO 2.8 km, 2 times per day Additional tools: Sea wave model (WW3) based COSMO-7km output Dispersion model of volcanic ashes based on COSMO-7km Soaring forecasts (end of test phase) (predictions of conditions for gliders based on COSMO-2.8km) … Strategy of IMGW

22 COSMO GM 2012 meeting | Lugano, Instytut Meteorologii i Gospodarki Wodnej – PIB Hardware Plans (2012/2013) Plans for a new Linux cluster to test, develop and run models at high resolution (7, 2.8 km and higher) About 50 TFlops sustainable, scalable up to over 100TFlops Model(s) development (for 2013 onwards): Soil model with implementation of soil data assimilation Resolution increased up to 1km, possibly in quasi-operational mode, preferably over mountains Start implementation of convection-resolving EPS Strategy of IMGW

23 COSMO GM 2012 meeting | Lugano, COSMO 4.18 – starting from July 2012 COSMO 7 km nudging data assimilation for synop (AOF format) two runs/ day (00 & 12UTC) COSMO 2,8 km resolution no data assimilation one run per day (00 UTC) Operations at NMA

24 COSMO GM 2012 meeting | Lugano, For operational activities Implementation of BUFR2NETCDF software and advanced testing for SYNOP; Testing BUFR2NETCDF for TEMP and PILOT data; Data assimilation for TEMP and PILOT data; Preparing radar data and converting into GRIB format for data assimilation Implementation of COSMO-ART (already done) for regional pollutant transport and air quality monitoring Preparing the emission files with help from KIT colleagues for operational use In consortium COSMO: Further participation in support activities, KENDA and VERSUS Possible participation in PT NWP test suite Plans at NMA

25 COSMO GM 2012 meeting | Lugano, SYSTEM COSMO-RU GME  x = 20 km COSMO-RU7  x = 7 km COSMO-RU2  x =2.2 km Domain: 900 km * 1000 km Grid: 420*470 * 50 Step: 2.2 км Time step: 15 c Forecast: 24 h Cores: 400 Grid: * 60 Step: 20 km Time step: 70 c Forecast: 7 days Гидрометеорологический центр Россиb COSMO-RUsib  x =14 km GME: initial and boundary data Domain: 4900 km * 4340 km Grid: 700*620 * 40 Step: 7 km Time step: 40 c Forecast: 78 h Cores: 800 Domain: 5000 km * 3500 km Grid: 360*250 * 40 Step: 14 km Time step: 80 c Forecast: 78 h Cores: 48

26 COSMO GM 2012 meeting | Lugano, : New domain for COSMO-RU data assimilation with grid step 6.6 km (2000x1000x40). This COSMO configuration will provide initial data for various nested model configurations Plans at RHM

27 COSMO GM 2012 meeting | Lugano, Numerical aspects contribute to the development of 1km –resolution COSMO model system in the course of preparations to Sochi 2014 Physical aspects contribute to development of parameterizations: PBL (aspects of steady stratification) Land-surface (mire and forests) microphysics scheme modification of parameterizations for 1-km resolution provide Valday hydrological observations for SRNWP data pool Verification: contribute to development of VERSUS implement radar data use in forecast verification develop the object-oriented methods for mesoscale products Plans at RHM

28 COSMO GM 2012 meeting | Lugano, Ensemble prediction: contribute to WG7 activity develop the mesoscale EPS in the course of preparations to Sochi Games Applications develop graphical tools for dissemination of COSMO products to all forecasting centers of Russia prepare the climatological COSMO version for the MSU supercomputer (computer “CHEBYCHEV”, staff of MSU) and to participate on CLM Community activities develop commercial applications Potential new aspect: possible membership of RHM in ECMWF Plans at RHM

29 COSMO GM 2012 meeting | Lugano, Resources in strategic areas Stategic areas for the future development of COSMO: Robust dynamical core for very high horizontal resolutions and mountainous terrain High-resolution regional ensemble forecasting Data assimilation for convective-scale ensemble forecasting Physical parameterizations for convective-scale forecasting (atmosphere and surface) Efficient use of the next generation computer architectures Expertise in COSMO assessed and deficiencies identified Input for strategic development of the COSMO members Discussion in progress