Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.

Slides:



Advertisements
Similar presentations
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
Advertisements

Fundamentals of Pressure Relief Devices
PARCC Progress Update 1 June 26, In the Last Year… 2 June 2012 Minimum Technology Specifications, Version 1.0, Released Item Development Began August.
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
BakerRisk also has the ability to utilize other software tools to complete a full flare system analysis: ChemCad® Dynamic flare header hydraulics Flare.
TIA Engineering Manual 6 th Edition Preview and Overview.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Committee on Refinery Equipment May 2011 Update to the Refining Subcommittee Kelly Smith, ConocoPhillips, Chair, CRE.
Committee on Refinery Equipment 2007 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
Subcommittee On Pressure Relief Systems API CRE Update Clark Shepard Spring 2010.
ISCC Report Spring Refining Meeting 2007 Seattle, Washington.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Policy Oversight Committee Update Board of Directors Meeting June 25-26, 2012 Stuart C. Sweet, MD, PhD.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair
Doc.: IEEE /527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
ISO Current status of development ​ ​ ISO development process ​1​1.
1 ISO/PC 283/N 197 ISO Current status of development November 2015.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
RTF Staff, Subcommittee and Work Updates January 23, 2013.
Doc.: IEEE r1 Submission May 12, 2002 Dr. John R. Barr, Motorola Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
The TNI National Environmental Laboratory Accreditation Board Update Daniel Hickman, NELAP Board Chair.
San Francisco, CA. SC8 Liaison Report
19th January 2012 Don Wells (Hess)
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
TG Chair: Darren Bane (BHI)
Preparation of the Self-Study and Documentation
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SPRING MEETING April , 2015 Seattle, Washington
API FALL MEETING November , 2015 Long Beach, CA
API SPRING MEETING May , 2016 Chicago, IL
API FALL MEETING November , 2014 Denver, Colorado
Histocompatibility Committee
API RP 17A - Discussion Points
2016 Exploration & Production Standards Conference Subcommittee 10
doc.: IEEE <doc#>
First 8 slides are what was presented in San Fransisco…
doc.: IEEE <doc#>
API SC 10, Work Group 3 Update:
doc.: IEEE <doc#>
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
Exit Capacity Substitution and Revision
doc.: IEEE <doc#>
HMC-4 Meeting 15th May 2018 London
Common Understanding Way forward
Review plan of the nature reporting – update 6
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Presentation transcript:

Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard

Expected Publication Date Standard/RP Title Current Edition Date Notes or Comments Expected Publication Date Std 520 Part 1 Sizing, Selection, and Installation of Pressure-relieving Devices in Refineries Part I—Sizing and Selection 8th Edition, December 2008 Work items beginning in Spring 2011 9th Edition 2013 RP 520 Part 2 Sizing, Selection, and Installation of Pressure-relieving Devices in Refineries Part II—Installation 5th Edition, August 2003 Reaffirmed 1Q11 Waiting on 6th Edition Reballot 6th Edition Waiting for committee and API guidance Std 521 (ISO 23251) Pressure-relieving and Depressuring Systems January 2007 Reviewed Issues with DIS Ballot Through ISO November 2012 (FDIS) Std 526 Flanged Steel Pressure Relief Valves 6th Edition, May 2009 None 7th Edition 2Q14 Std 527 Seat Tightness of Pressure Relief Valves 3rd Edition, July 1991 Re-affirmed July 2007 2012 Std 2000 (ISO 28300) Venting Atmospheric and Low-Pressure Storage Tanks Nonrefrigerated and Refrigerated 6th Edition, November 2009 (API adopt back); ISO release 2008 DIS June 2011 December 2012 1

Std 521 (ISO 23251) Currently greater than 400 comments submitted on 521 Ballot (closing June 15) Session planned for July 2011 to work on comments Chemical Safety Board submitted response concerning revisions made to address 2007 CSB recommendations Five comments provided; response framed during meeting Task group formed to develop API response (John Burgess - Lead) Plan to draft response for Fall 2011 meeting Comment highlights: 1. “unaccepted risk” – point to API 752 and 4. Urging use of flare - inherently safer alternative – Provide comment when flare is not always inherently safer. API Environmental working on industry response to EPA regarding flare Paul Eichemer attended meeting as liaison for API Environmental; EPA continues to formalize position and is looking at minimum heating value Providing Table 11 clarification in next edition of API 521

API RP 520 Part 2 Inlet Pressure - Proposals for Path Forward Revise API 520 Part 2 (6th Edition) Ballot to incorporate all changes except those related to Inlet pressure drop and other sections addressing PRV chattering reverting back to the 5th edition wording. Update guidance addressing PRV chattering in RP 520 Part 2 when there is stronger technical support for the revisions. Agree to text reviewed at Fall 2010 meeting allowing 5% with safety margin (2%) and engineering analysis requirements when exceeding 5%. Update guidance addressing PRV chattering in RP 520 Part 2 when there is stronger technical support for the revisions. (note 1) Ballot after completing 1 and work on adding design guidance for liquid filled systems to reduce chattering potential. Ballot after completing 2 and work on adding design guidance for liquid filled systems to reduce chattering potential. Note 1 - Consider working with DIERS on engineering model (stability) Note 2 - Work with API on path forward for Re-Balloting in light of OSHA involvement.

API 526/527 and 2000 2000 – Continue to work document revisions for preparation of ballot 527 – Need to correct publishing mistakes made to the 2007 reaffirmed version

Changes to Pressure Relieving Systems Over Last 5 Years Improved Pressure Relieving Systems Modeling - Industry has been modeling pressure relief and flare systems using commercial software to better estimate pressure relieving rates and flare system hydraulics. API 521 and 2000 have been adopted as ISO documents increasing global review and application API 521 is always undergoing continuous improvement. The last version included improved guidance on 1) hierarchy of mitigation based on inherent safety, 2) expansion to address fire types and details of methodology, 3) introduction of low probability contingencies, 4) expanded flare limits, 5) addition of toxic limits for atmospheric releases and 6) added cautions around CBDs. API 2000 content revisions include improved basis for tank vent sizing and added cautions open vent discharge

Back-Up

PERF 99-05 PRV Stability Project Project winding down with equations developed to model lift of PRV Contracted phases complete with final report expected after meeting Meeting scheduled for Thursday to determine if additional work should progress, how to use the tool and what is the tools limitations Results for valves tested at 50 psig and 250 psig appear to indicate model reasonably predicts chattering based on test data; Needs additional work to determine unknown variables Some limitations including: Requires variables for each valve; two of which can only be determined through testing Not sure if models can be extrapolated above 250 psig set pressure Need to understand effect of larger vessels/system (increased capacitance)

API 520 (Part 2) – 3% Status and Ballot API SCPRS approved ballot for 6th Edition with comments OSHA sent letter with regard to inlet pressure drop revisions in 520 ballot (April 2010) Met with OSHA to review letter and API’s path forward (Sept 2010) API SCPRS task group agreed to revisions to inlet pressure drop (5% with safety factor) With goal to include a performance basis for exceeding 5% OSHA’s Jim Lay, attended API Fall 2010 committee meeting. During API Fall 2010 meeting agreed to develop survey for data collection that would support inlet pressure drop to 5% is lower risk (Not supported by all members) API Law placed hold on 5% inlet pressure drop survey Reaffirmed current API 520 Part 2 version to meet API/ANSI standards document review cycle to reset review process for additional 5 years (January 2011) API task group recommended a ballot (without revisions to inlet pressure drop; using 5th edition wording) OSHA continues to inquire on status with regard to API 520 Part 2 - Inlet Pressure Drop (April 2011) Subcommittee looking at Lift Criteria/Cycling analysis to allow greater then 5% inlet pressure drop PERF Stability project (goal to provide guidance with regard to PRV stability) reviewing results of funded phases to determine path forward. API completing literature search on incidents.