Field Location The Kristin Field, discovered in 1997, is situated 20 km south west of Åsgard (Smørbukk) and stretches into PL 134B and PL 199. The Kristin.

Slides:



Advertisements
Similar presentations
Norwegian supplier of special services to the SubSea construction market for numerous of projects. PROJECT PROGRESS and DELIVERY ON TIME as governing work.
Advertisements

Natural Gas Market Conditions and Unisource Natural Gas Bills Bob Gray, Arizona Corporation Commission Staff February 24, 2004.
Railroad Commission of Texas Statewide Rule 32 and Flaring/Venting of Produced Gas Travis Baer, District 01 Engineering Specialist August 2014.
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
New England’s Regional Renewable Resource Development Efforts New England States Committee on Electricity November 3, 2011.
Valhall development timeline. Licence award Licence award: The Valhall block 2/8 was among the more attractive in the first offshore licensing round announced.
Designers & Fabricators of Water & Waste Water Equipment Water Pump Stations.
B9 Coal Deploying Fuel Cells to Generate Cheap, Clean Electricity from Fossil Fuels.
William Simpson Atlanta, GA May 3, 2010
Remote Hot-tap on Åsgard
Facilities and Infrastructure December 10, Barletta Construction: Parent Organization In 1914, Vincenzo Barletta, a recent immigrant from Italy,
Low-GWP Alternative for Small Rigid PU Foam Enterprises Conversion Demonstration from HCFC-141b-based to Cyclopentane-based Pre-blended Polyol in the Manufacture.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Johan Castberg Production Challenges
Delivering LNG to remote sites to service pipeline interrupts on a temporary basis.
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
Floating Production Systems
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
General_Presentation.ppt February 2010 Slide 1 R\200060\Commercial\Typing\_GeneralPresentation\Presentations DORIS\PresentationDORISDiapo\PresentationSimplifiée.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
1) The history of Technip 2) Range of services
Tomas rönn Fuel flexible Power generation.
Imported Liquified Natural Gas and its Role in Energy Independence Samuel Brown.
Presentation Overview
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
Hanford Status Slides. Cask/Transportation System Fabrication of Casks complete (5 total) Delivery of 3 (of 5) trailers complete MCO Loading System (MLS)
TietoEnator © 2003presentationPage 1 Daily production & activity report standardisation Meeting 5-6 april 2005.
IRAQI GAS DEVELOPMENT PLANS AN OVERVIEW
Provident Energy Management Inc. Electrical Deregulation Presentation for DEL Property Management Inc. Proud Members: Continental Automated Building Association,
Åsgard Subsea Gas Compression. Norwegian Petroleum Directorate The Norwegian Petroleum Directorate (Norwegian: Oljedirektoratet) or OD is a Norwegian.
Three Gorges Dam The Worlds Largest Hydro-Electric Plant.
Investment Project Black Sea Ship-building Yard. 2 Key Information Public JSC “Black Sea Ship-building Yard” is one of the largest ship-building.
Introduction Oil & Gas engineering services company
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Pork Management Conference Accounting Roundtable June 18, 2015 Drew Hesker The Maschhoffs, LLC
WINTER PREPAREDNESS PLAN ALLIANT GAS. Alliant Gas is the propane gas company that operates as a regulated utility in the towns of Payson and.
Facilities Engineering *1 st draft By: Saha. Development options ProposalDevelopment OptionEstimated Cost (Mil) A FPSO converted to Tanker Hull 300 kbo.
Incorporating Bio- methane Projects With Utility Systems Merlin Raab- Mgr. Renewable Policy & Contracts July 22, 2008 WPUI- Conventional and Alternative.
Return With Honor Zappalá Return With Honor Zappalá-2001.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
PHASE 7 FACILITIES ENGINEERING
LSU Petroleum Engineering Research and Technology Transfer Laboratory “The Well Facility”
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
PROJECT BACKGROUND Location coordinate :
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Bengt Lie Hansen Senior Vice President, Hydro Oil & Energy The Giant Ormen Lange Field Development Hydro’s model for arctic offshore projects World Gas.
A proposed solution to basic conveyance and ecosystem restoration problems By Robert Pyke Ph.D., G.E. Robert Pyke, Consulting Engineer Lafayette, CA.
West Dikirnis Field Development Project Execution Case Study.
1 Ventilation Systems Capital Asset Projects Safety Significant Confinement Ventilation System (15-D-411) Exhaust Shaft (15-D-412) Ronald.
North Coast Wind Farm Tolano Environmental Consulting.
Petro Data Mgt III- Facilities Petroleum Professor Collins Nwaneri.
North East Gas Interconnector Project Community and Business Roadshow July 2015.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
At the Ballarat City Gate Construction and Commissioning of a Shell and Tube Heat Exchanger Speaker: Godwin Wong.
All-Russia D.I. Mendeleyev Scientific and Research Institute for Metrology (Vniim) (FGUP "D.I.Mendeleyev VNIIM") Konstantin Popov
“We believe in providing products and solutions that will increase our customers’ productivity and profitability.”
T o t a l s u b s e a s o l u t i o n s AB-X-PR Subsea 7 Inc. Results for First Quarter April
1 Punch list / Close Out - Project Completion Best Practices May 2016.
West Cambridge Data Centre Ian Tasker Information Services.
Downtown Marina and Promenade January 8, 2008 Agenda Items 6.05 & 6.09.
European Energy Southern Gas Corridor to Europe
Next Generation Deepwater Facilities A View Forward Based on the Past by Ken Arnold K Arnold Consulting, Inc.
-EL ABBARI Younes, FADIL Najib (CNESTEN) -SADIQ Younes (AMSSNuR)
Qualification Criteria and Available Tender Capacity
Compressed Natural Gas Supply Vehicles
Riser and Flowline Hose Systems Design to Installation
Petro Data Mgt III- Facilities
Presentation transcript:

Field Location The Kristin Field, discovered in 1997, is situated 20 km south west of Åsgard (Smørbukk) and stretches into PL 134B and PL 199. The Kristin field will be a gas and condensate producing field. Kristin might be developed as a field centre for Haltenbanken Sør including the following fields:  Kristin  Lavrans  Ragnfrid  Erlend  M-prospect  Future discoveries in the vicinity of Kristin The Haltenbanken Sør field is located at the western part of the Halten Terrace, approximately 240 kilometers off the Norwegian West Coast. The water depth across the field ranges from 240 to 370 m. The PDO was approved by the authorities in December Kristin license has a commitment to deliver gas from Field Installations The Kristin development will consist of subsea completed wells from four templates with subsea production facilities installed in the central and northern areas of the Kristin field producing to the Kristin Semi. The Semi has full process capacity and will be producing stabilised condensate. The condensate will be transported to a floating storage unit for export (Åsgard C). Gas will be transported directly from the Kristin Semi to Åsgard Transport.

The Kristin Semi consists of the Hull and the Topsides. The Topsides consist of following main items:  Living Quarters  Utility & Power Generation Module  Process & Process Support Module  Manifolds & Riser Balcony Module  Flare Tower The main items are also displayed in the figure below:

The main functions of the Kristin Semi are:  Gas dehydration  Gas export through Åsgard Transport  Condensate stabilization  Condensate export to a storage unit The Kristin Semi will be split into the following main contract packages: Con trac t FormatDescription 11EPCHOverall Engineering, Procurement and Hook-up of the Kristin Semi and Fabrication of both the Process & Process Support Module and the Utility & Power Gen. Module FCFabrication Contract of both the Manifolds & Riser Balcony Module and the Flare Tower. FCFabrication Contract, Hull EPCEngineering, Procurement and Construction Contract, Living Quarters and Helideck

Project Main Design Criteria The Kristin Semi shall have the following capacities:  18.3 x10 6 Sm 3 /SD Rich Gas Export rate from the Kristin Semi  Sm 3 /SD Condensate export rate.  Sm 3 /SD total liquid handling capacity in inlet separator. The Kristin Semi will be installed in a water depth of 315 meters. The Living Quarters will be designed for 104 persons. The number of risers is 24. The Kristin Semi shall have the flexibility to handle future tie-ins from other adjacent fields.