C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O BJECTIVES AND D ESCRIPTION OF THE CDM O PERATIONS P LAN.

Slides:



Advertisements
Similar presentations
PoA Challenges & Opportunities
Advertisements

CDM METHODOLOGIES IMPROVEMENT 7 th CDM Joint Coordination Workshop th March 2011, Bonn, Germany Anne-Sophie Zirah - March 2011.
Factory Objectives Value of Asset Management Strategies.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF CPA S PREPARATION AND INCLUSION C ASE STUDIES AND E XPERIENCE.
[Organisation’s Title] Environmental Management System
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
PDD Preparation Cairo, June 14-15, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXVega Bahia Landfill Project Design Document.
Environmental Management System (EMS)
More CMM Part Two : Details.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROCESS TO P REPARE AND I NCLUDE CPA S UNDER A CDM P O A.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING.
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
Tipologie di Audit e loro caratteristiche Riunione sottogruppo GCP-GIQAR 21 Marzo 2006 Francesca Bucchi.
Hazard Analysis and Critical Control Points
Quality Assurance/Quality Control Policy
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING M ONITORING AND V ERIFICATION.
Software Configuration Management
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF V IETNAM R ENEWABLE E NERGY D EVELOPMENT P ROGRAM (REDP) O PERATIONS.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA LEVEL MONITORING, P REPARATION OF M ONITORING.
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
CS 4310: Software Engineering
S/W Project Management
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Ship Recycling Facility Management System IMO Guideline A.962
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
Basics of OHSAS Occupational Health & Safety Management System
Software Quality Assurance Activities
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
Verification: Quality Assurance in Assessment Verification is the main quality assurance process associated with assessment systems and practice - whether.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU. Quality Assurance José Viegas Ribeiro IGF, Portugal SIGMA.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING K EY C OMMERCIAL A SPECTS OF SUB -ERPA S.
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
Project Life Cycle.
Good Practice for monitoring plans Viewpoint of a DOE Marco van der Linden, SGS Climate Change Programme
Lecture 7: Requirements Engineering
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Verification from PPs perspective Round table on A/R CDM projects Carbon Finance Unit – World Bank August 24&25, 2009 Walter Oyhantçabal A/R WG.
Capturing the requirements  Requirement: a feature of the system or a description of something the system is capable of doing in order to fulfill the.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
1 Tempus Tempus Workshop Sarajevo 7 June 2006 « Good practice in Preparing an Application » Anne Collette European Training Foundation Tempus Department.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Case study municipality. 2 Contents Introduction The way Results Conclusion.
Verification, Validation and Internal Audits - Jose Jimenez Federal Facilities Program Manager – EPA Region III.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Response to an Emergency Training for 211 Staff in Ontario Updated September
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Presentation transcript:

C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O BJECTIVES AND D ESCRIPTION OF THE CDM O PERATIONS P LAN

C ARBON P ARTNERSHIP F ACILITY 2  Provide guidelines for implementation and monitoring of a CDM project  Present main equipment  Focus on the CDM instruments and how each monitors CDM data  Explain CDM parameters and formula  Highlight procedures and documents for QA/QC  Define responsibilities, organization and management of the PoA  Describe verification and inclusion process Objectives of the CDM operations plan

C ARBON P ARTNERSHIP F ACILITY 3 What is a landfill gas project?

C ARBON P ARTNERSHIP F ACILITY 4 Objective: help the CME materialize the project design  Main equipment: gas collection  Main equipment: flare and engines Description of the equipment

C ARBON P ARTNERSHIP F ACILITY 5 Objective: focus on CDM instruments and why they are used CDM equipment, data monitored and utilization in ER formula  Explain the logic behind each parameter Description of the equipment InstrumentCDM parameterUsed for Flow meterFlowNormalized flow Pressure sensorLFG pressureNormalized flow Temperature sensorLFG temperatureNormalized flow Gas analyzer% CH 4 in LFGTonnes of CH 4 captured ThermocoupleFlare temperatureFlare efficiency Exhaust gas analyzer% CH 4 and %O 2 in the flareFlare efficiency Electricity meterElectricity consumedProject emissions Electricity meterElectricity generatedBaseline emissions

C ARBON P ARTNERSHIP F ACILITY 6 Monitored parameters must be: Recorded automatically when continuous monitoring is required Exhaustive Consistent Analyzed Unalterable Auditable Backed up Archived CDM aspect of data and calculations Calculations must be: Reproducible Strictly compliant with the PoA-DD / CPA-DD Computed on a regular basis (monthly or weekly) You must be able to know almost in real time how much CERs are generated You must be able to spot an inconsistency and take a corrective action as quick as possible Objective: highlight the CDM nature of parameters and calculations

C ARBON P ARTNERSHIP F ACILITY 7 Objectives: - Ensure the monitoring implemented will support the CER claim - Avoid CDM mistakes or, if any, spot them immediately - Be prepared for a CDM audit What do you need?  Monitoring process: - Organization: should be well defined - Procedures: should be clear to everyone - Clear definition of monitoring responsibilities  Means of quality control: - Tools: checklist, records etc. - Communication between stakeholders - Site visits / spot checks And project awareness! Quality Control / Quality Assurance

C ARBON P ARTNERSHIP F ACILITY 8 Example of tools for quality control of waste projects :  Training of stakeholders: people must be aware of basic CDM rules. For example: consequences of a calibration delay or impact of a missing parameter  Calibration planning: avoid calibration delay, in particular if an external third-party is needed for calibration (e.g. flowmeter)  Monitoring records database : synthesis of site operation information relevant for CDM (instruments ID, calibration information, electricity consumed, CER generated)  QA/QC checklist: control of key CDM information by the CME - has the CPA provided the information to the CME? - is this information correct / complete? - is there any CDM issue?  Emergency procedures - Failure of a CDM device: availability of spare parts - Loss of data: back up, reason and fixing Quality Control / Quality Assurance

C ARBON P ARTNERSHIP F ACILITY 9 Objectives: - Define the organizational structure - Ensure roles and responsibilities are clearly defined at both CME and CPA levels - Explain the PoA record keeping system (management of PoA information flow and documentation)  Proposed organizational chart  Detailed description of roles and responsibilities, including task and profile of each CDM team member - CPA level: Biogas technician, LFG plant manager, monitoring manager or coordinator - CME level: CDM PoA manager, IT officer, CDM and carbon finance director Organization and management of the PoA

C ARBON P ARTNERSHIP F ACILITY 10  PoA record keeping system: managing PoA documentation Implementation of a shared database with a CDM logic structure. Example of Land Bank of the Philippines: Organization and management of the PoA

C ARBON P ARTNERSHIP F ACILITY 11 Objectives: - Describe shortly the audit process - Highlight the main sections of Monitoring Report - Focus on the documents provided at verification  Verification: - Audit preparation is key - Responsibilities of all stakeholders - Coordination between CME and CPA Operators - Management of communication with DOE - Documents required for verification: link between MR content and CPA database - Timeframe from production to CER issuance: - Minimum 3 months incompressible at the UNFCCC - Verification delay: it all depends on you! Verification process

C ARBON P ARTNERSHIP F ACILITY 12 Objectives: - Describe shortly the audit process - Highlight the main sections of CPA-DD - Advise on selection of a new CPA (landfill)  Inclusion: - Selection of new CPA for inclusion: criteria for the selection of a « good » CPA from a CDM perspective - Project due diligence - Due diligence of CPA Implementer - Compliance with PoA-DD: eligibility, additionality, project scope, monitoring constraints - Understand the challenge of not being too specific in writing the CPA-DD What is written in the CPA-DD must be implemented Inclusion process

C ARBON P ARTNERSHIP F ACILITY 13 Training on CDM Operations Plans and Sub-ERPA Contracting Washington D.C., USA, 1 st April 2014