NSPS OOOO & Fracking Air Quality Rule Updates Oil & Gas Environmental Compliance Conference – Appalachian Basin May 13-14, 2014 Robert Keatley, PE Senior.

Slides:



Advertisements
Similar presentations
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
Advertisements

METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL FURNITURE SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART RRRR July, 2006.
METAL FURNITURE SURFACE COATING MACT COMPLIANCE ASSURANCE
METAL COIL SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART SSSS May, CFR PART 63, SUBPART SSSS May, 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
Compliance Dates The final rule was published on January 25, 1995,
IRON & STEEL FOUNDRY MACT COMPLIANCE ASSURANCE
Steffes Engineered Flare System
Hydraulic Fracturing and Air Issues in the Oil and Natural Gas Sector
Railroad Commission of Texas Statewide Rule 32 and Flaring/Venting of Produced Gas Travis Baer, District 01 Engineering Specialist August 2014.
Anne M. Inman, P.E. Air Permits Division September 11, 2012.
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
RICE MACT and Oil Analysis
The Reciprocating Internal Combustion Engine (RICE) MACT Summary
Garry Kaufman Deputy Director Colorado Air Pollution Control Division June 6, 2014.
Colorado Reg Revisions
Regulatory Drivers for Reducing Solvent Emissions Barbara Johnson, PE Kansas State University Kansas Small Business Environmental Assistance Program March.
Tuesday Oct. 7, 2014 Implementation of Permit Exemption Criteria Category No. 38 Tom Corbett, Governor Dana Aunkst, Acting Secretary.
New Emission Rules for IC Engines Presented by Scott Wallace Devon Gas Services, L.P.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Implementation and Management of Leak Detection and Repair Programs – New Rules and Other Considerations Nebraska Ethanol Safety & Environmental Coalition.
Highlights of Colorado’s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014 Presentation to WESTAR May 2014 Will Allison Colorado.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Anne M. Inman, P.E. Manager, Rules Registration Section Erin Selvera, J.D. Special Assistant to Director Air Permits Division Texas Commission on Environmental.
Compliance Update NCMA 2015.
WESTAR Oil & Gas Conference October 2008 Lori Bocchino Wyoming Oil & Gas Permitting and New Rule/Policy Revisions.
VOC and NO x Rules Related to the Oil and Natural Gas Industries Air Quality Division Bob Gifford Air Quality Specialist, Air Quality Division Presented.
Installing Vapor Recovery Units to Reduce Methane Losses
The New Federal NESHAP Air Quality Rule for Oil and Natural Gas Area Sources Susan Bassett, Air Quality Team Leader URS Corporation Rocky Mountain EHS.
New Air Quality Regulation “NSPS OOOO” Oil and Natural Gas Industry Workshop October 24, 2012 Robert Keatley, PE Senior Engineer/Supervisor DEP – Division.
Mustang Watchdog April 22, 2014
Miscellaneous Organic NESHAP Compliance for a New Countermeasure Flare Production Facility at the Milan Army Ammunition Plant FRANKLIN engineering group,
New Orleans / ACC / SOCMA November 2003 Randy McDonald, OAR, USEPA.
Our Vision – Healthy Kansans living in safe and sustainable environments.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
Air Quality 101 Kansas Air Quality Program overview.
WILL ALLISON AIR POLLUTION CONTROL DIVISION APRIL 16, 2012 Oil and Natural Gas Air Pollution Standards.
Estimate of Air Emissions from Shale Gas Development and Production in North Carolina May 15, 2015 Presented to the Mining and Energy Commission Environmental.
EPA Overreach WATERS OF THE U S METHANE REDUCTION PLAN LEGISLATIVE /REGULATORY FORUM SEPTEMBER 16, 2015.
ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy.
EPA Natural Gas Star Annual Meeting © Chevron 2006 Chevron Experience: Methane Emission Mitigation Natural Gas STAR Producers & Processors Technology Transfer.
Environmental and Clean Air Regulations M IDSTREAM E NERGY L AW C ONFERENCE : M EETING THE D EMAND FOR I NFRASTRUCTURE H OUSTON, T EXAS December 7, 2012.
Latest on the Proposed WYDEQ BACT Policy Dana Wood, BP Senior Environmental Technical Advisor.
The Paper and Other Web Coating (POWC) MACT – Executive Summary The executive summary is a power point presentation designed to be used for basic education.
New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012.
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
1 Addressing Air Quality Impacts from Oil and Gas Development in Colorado WESTAR Conference October 23, 2008 Rose Waldman Colorado Air Pollution Control.
Standards Certification Education & Training Publishing Conferences & Exhibits Jay Christopher Business Unit Manager, Air & Process Services Trihydro Corporation.
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality.
Garry Kaufman Air Pollution Control Division.  Background on Oil and Gas Air Regulation in Colorado  Basis for Additional Air Quality Requirements for.
New Air Quality General Permit G70-A Overview WVONGA Air Permitting Issues Seminar September 12, 2013 Oglebay Resort, Wheeling, WV Laura Jennings Engineer.
RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010.
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifications Citizens Advisory Council March 15, Tom Wolf, Governor John Quigley,
Updates from Ohio EPA DAPC
Complying with Periodic Emissions Monitoring Requirements
NSPS OOOOa Overview Photo from
ARB GHG Oil & Gas Regulation
EPA’S New Source Performance Standard (NSPS)
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Simple but Complicated Air Quality Permitting for Generators
Air Permitting General Permit Updates
Saskatchewan Measurement Directive PNG017 DRAFT CHANGES
Uinta Basin Industry BMPs Stuart Siffring
Presentation transcript:

NSPS OOOO & Fracking Air Quality Rule Updates Oil & Gas Environmental Compliance Conference – Appalachian Basin May 13-14, 2014 Robert Keatley, PE Senior Engineer/Supervisor DEP – Division of Air Quality

 New Source Performance Standard (“NSPS”) OOOO - Standards of Performance for Crude Oil and Natural Gas Production, Transmission and Distribution  Published August 16, 2012  Amended September 23, 2013  Compliance Date - Flowback October 15, 2012  Compliance Date - Pneumatic Controllers October 15, 2013  Compliance Date- Storage Vessels April 15, 2014 and April 15, 2015 NSPS OOOO

 Natural gas wells (“not oil wells”) – hydraulically fractured  Centrifugal Compressor – using wet seals  Reciprocating Compressor  Pneumatic Controllers - continuous bleed  Each Storage Vessel (PTE 6 tpy VOCs) – crude oil, condensate, produced “water”, & intermediates  Natural Gas Processing Plants – LDAR  Sweetening Plants NSPS OOOO Affected Facilities

 Applies to each hydraulically fractured/refractured gas well drilled (commenced construction, modification, or reconstruction) after August 23, 2011  Hydraulically fractured/refractured includes wells fractured w/ Water, Nitrogen, and/or Carbon Dioxide Well Completions

 Each well drilled after 8/23/11 and before 1/1/2015 must:  Flowback Operations - reduce VOC emissions with a completion combustion device (typically a flare) on or after October 15, 2012  Completion Combustion Devices must be equipped with a “reliable continuous ignition source”  Sources have a general duty to safely maximize resource recovery and minimize releases to the atmosphere Well Completions

Completion Combustion Devices (aka Flares)

 Gas Wells drilled on or after January 1, 2015  “Green Completions” - route recovered liquids into storage vessels or re-inject the liquids into the well or another well and route recovered gas into a gas flow line, collection system, re-inject into the well or another well, or use as fuel, “with no direct release to the atmosphere”  Salable quality gas must be routed to the flow line Well Completions

 Two (2) day Notification - prior to commencement of each gas well completion beginning October 15, 2012  Electronically Notify DEP and EPA by using and  Instructions and form available on DAQ’s website Well Completions

 Must maintain a daily log for each gas well completion operation (digital photo alternative)  Records of duration of flow into a line; duration of combustion; duration of venting (digital photo alternative)  Specific reasons for venting in lieu of capture or combustion  Digital photographs w/ Lat. & Lon. of all the equipment used during flowback with specific location (alternative) Well Completions

 Annual report - for each gas well and equipment the report must provide a list of all well completions and any deviations where well completion operations or equipment (storage vessels, etc) were not performed in compliance  Must be certified by the responsible official  Must submit initial report within 90 days may arrange a common schedule for annual reporting Well Completions

 Group 1 Storage Vessels - installed after 8/23/11 and on or before 4/12/2013 with potential VOC emissions of six (6) tons/year or greater (each vessel) determined by 10/15/2013 and that are located at the well site more than 180 consecutive days  Group 2 Storage Vessels – installed after 4/12/2013 with potential VOC emissions of six (6) tons/year or greater (each vessel) determined by April 15, 2014 or within 30 days of startup (whichever is later) and that are located at the well site more than 180 consecutive days  Vapor Recovery Units (VRUs) can be used to limit PTE provided they comply with the cover and closed vent system design requirements of NSPS OOOO “vented to the process”  DAQ’s permitting threshold is 6 lbs VOC/hr (144 lbs/day) for the entire well site “Potential Emissions Not Actual Emissions”  Exemption less than 4 tpy VOC “Actuals” without controls (12 consecutive months, then monthly) – VRUs not considered control devices for NSPS OOOO  VRUs “do not” count toward reduction in PTE for Rule 13 permitting Storage Vessels

 Group 1 & 2 Storage Vessels shall reduce VOC emissions by 95%  Group 2 must achieve emission reductions by April 15, 2014  Group 1 must achieve emission reductions by April 15, 2015  May install “practically enforceable” controls to reduce PTE  “Once In Always In”, but may remove controls if actuals below 4 tpy VOC Storage Vessels Cont’d

 Enclosed Combustion Devices (aka flares) must operate with no visible emissions for periods not to exceed a total of 1 minute during any 15 minute period – Monthly Method 22 VE checks for a minimum of 15 minutes  Enclosed Combustion Devices must have continuous burning pilot flame installed and operated and maintain the device to be leak free  Annual visual/smell LDAR of closed vent systems  Must operate control device at all times vapors are vented Storage Vessels Cont’d “Non-Manufacture” Tested Controls

 Combustion Controls “Enclosed Combustors” must be operated with no visible emissions (VE), except a total of 2 minutes during any hour  Method 22 VE must be performed each calendar quarter for 1 hour  Continuously monitor the inlet gas flow rate to demonstrate the flow is equal to or less than the max. specified by manufacturer  Continuously monitor for pilot flame at all times Storage Vessels Cont’d “Manufacturer” Tested Controls

 Control Device “exempted” from performance testing, if performance test conducted by manufacturer in accordance with NSPS OOOO  Boiler or process heater vent stream introduced with the primary fuel is exempt from performance testing  Performance testing required for non-manufacturer tested controls to demonstrate compliance with 95% reduction within 180 days Storage Vessels Cont’d Performance Testing Controls

Storage Vessel – Combustor Control Device “Thermal Vapor Incinerator” (aka Enclosed Flare)

 Pneumatic controllers - installed after 8/23/2011 (extraction) & 10/15/2013 (wellhead to extraction) – each pneumatic controller must be tagged with month & year of installation  Reduce VOC emissions at wells to extraction plants (6 scf/hr or less bleed rate) and at extraction plants (zero bleed rate) by using a low bleed or no bleed design by October 15, 2013  Exemptions for less than or equal to 6 scfh continuous bleed and based on functional needs, including but not limited to response time, safety and positive actuation Pneumatic Controllers

 Reciprocating compressors before extraction - reduce emissions by the replacement of rod packing (every 26,000 hours of operation or 3 years) *well site engines are exempt  Centrifugal compressors (Wet Seal) - required to install air pollution control equipment to reduce emissions by 95% and to monitor this equipment *well site engines are exempt Compressor Engines after 8/23/2011

 MACT Subpart HH – Dehydration Unit Updates * Annually update Wet Gas Analysis and GLYCalc determination ;if the station’s actual emissions are greater than 50% of major source thresholds (storage vessels included, not engines) *Updated samples and GLYCalc determinations by October 12, 2012 or within one year prior *Must use the maximum designed glycol pump recirculation rate when determining major source status *Must include storage vessels in determining major source status of HAPs (excludes surge control vessels and knockout vessels) Other Big Changes

 NSPS KKK Replaced with NSPS OOOO  LDAR requirements at Extraction Plants that commenced construction, modification, or reconstruction after August 23, 2011  Requires LDAR in accordance with NSPS VVa, which has lower leak definitions Other Big Changes

 Compliance dates have changed  Non-road Engines are not subject to this rule  New exemption for existing area source engines defined as “Remote” stationary RICE  Remote RICE exempt from emission testing requirements  Must evaluate the status of their “Remote” stationary RICE every 12 months  Non-remote 4SLB & 4SRB engines > 500 HP must have a catalyst installed by Oct. 19, 2013 (unless granted an extension) MACT ZZZZ RICE Engines Rule Updated

Robert Keatley, PE Division of Air Quality th Street, SE Charleston, WV Phone: ext Questions?