GLexec update GDB 2010-09-08 Maarten Litmaath CERN.

Slides:



Advertisements
Similar presentations
Last update 01/06/ :23 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD Site Registration policy & procedures
Advertisements

CREAM: Update on the ALICE experiences WLCG GDB Meeting Patricia Méndez Lorenzo (IT/GS) CERN, 11th March 2009.
CREAM John Gordon GDB November CREAM number of sites now – gstat2 says 24. Batch systems supported Experiment Tests Feedback from sites. Evaluation.
New VOMS servers campaign GDB, 8 th Oct 2014 Maarten Litmaath IT/SDC.
HOW TO GENERATE PROFIT REPORT User’s Guide. Step 1. At the admin main window Step 2. Click Reports.
HEPiX October 2009 Keith Chadwick. Outline Virtualization & Cloud Computing Physical Infrastructure Storage Monitoring Security ITIL HEPiX Conference.
CERN IT Department CH-1211 Genève 23 Switzerland t EIS section review of recent activities Harry Renshall Andrea Sciabà IT-GS group meeting.
Lundi 12 octobre 2015 CA update procedure Hélène Cordier IN2P3/CNRS Computing Centre, Lyon, France.
WLCG Service Report ~~~ WLCG Management Board, 24 th November
LCG Introduction John Gordon, STFC GDB September 9th 2009.
CERN Using the SAM framework for the CMS specific tests Andrea Sciabà System Analysis WG Meeting 15 November, 2007.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
OSG Technology Area Brian Bockelman Area Coordinator’s Meeting February 15, 2012.
Alberto Aimar CERN – LCG1 Reliability Reports – May 2007
 Status of the ALICE Grid Patricia Méndez Lorenzo (IT)ALICE OFFLINE WEEK, CERN 18 October 2010.
Security aspects of the lcg-CE Maarten Litmaath (CERN) EGEE’08.
LCG Introduction John Gordon, STFC GDB September 14 th 2011.
LCG Introduction John Gordon, STFC GDB December14 th 2011.
LCG Introduction John Gordon, STFC GDB June 8 th 2011.
Site Manageability & Monitoring Issues for LCG Ian Bird IT Department, CERN LCG MB 24 th October 2006.
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
GDB Introduction Ian Collier STFC Rutherford Appleton Laboratory Group info (if required) GDB, January 13 th 2016.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Andrea Sciabà Hammercloud and Nagios Dan Van Der Ster Nicolò Magini.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Update Authorization Service Christoph Witzig,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Middleware Update Maria Alandes Pradillo.
Handling of T1D0 in CCRC’08 Tier-0 data handling Tier-1 data handling Experiment data handling Reprocessing Recalling files from tape Tier-0 data handling,
SouthGrid Status Pete Gronbech: 31st March 2010 Technical Meeting.
WLCG Operations and Tools TEG Report to the GDB Jeff Templon and Maria Girone 9 November 2011.
USING THE LDS.ORG CALENDAR IN MY CALLING – Calendar Editor.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks glexec/SCAS pilot service Status and short-term.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 December 2007.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons Maarten Litmaath On behalf of the WG participants GDB 09/09/2015.
OSG Technology Area Brian Bockelman Area Coordinator’s meeting October 12, 2011.
Probes Requirement Review OTAG-08 03/05/ Requirements that can be directly passed to EMI ● Changes to the MPI test (NGI_IT)
BACnet Connector Troubleshooting. What is your current issue? 1. My connector is down 2. I get a “Socket Timeout” error 3. I get an “Unknown object” error.
ALICE WLCG operations report Maarten Litmaath CERN IT-SDC ALICE T1-T2 Workshop Torino Feb 23, 2015 v1.2.
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
OpenSSL and Java 7 vs. 512-bit proxy keys
Multi User Pilot Jobs update
Pedro Andrade ACE Status Update Pedro Andrade
Should Kids Play RATED M GAMEs
Grid status ALICE Offline week Nov 3, Maarten Litmaath CERN-IT v1.0
Update on SHA-2 and RFC proxy support
glexec/SCAS pilot service
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
How to Fix Error Code 1025 in Mac Outlook 2011?
Fix Error 550 Connect at Customer Service Number to Fix Error 550 under expertise of tech Support team experts.
Malwarebytes Software Updating and Upgrading
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Malwarebytes Installation Error Number
Malwarebytes Installation Problem Number
Malwarebytes Problems Windows 10
Malwarebytes Installation Errors
Malwarebytes Updated to Fix Several Crashes
Quicken Update Problem With Bank
Quicken Update Problem With Bank
קורס פיננסי – מושגים פיננסיים / כלכליים
آشنايی با اصول و پايه های يک آزمايش
Team A.W.E.S.O.M.-O 4000 February 20, 2007.
Fix Garmin GPS Map Update Error
HO DOC Team Site – How to subscribe?
HEPiX October 2009 Keith Chadwick.
Operational Tools & Middleware Versions Monitoring
GEG - How to Flag Multiple Structures for Certification
Step 1: Click on the “Financial Information” tab, enter your FSA ID, and click the “LINK TO IRS” button.
If you win or lose, it is important to ALWAYS be a good sport.
MB Maarten Litmaath CERN v1.0
Types of Errors And Error Analysis.
This is my sheet And this is my sheet.
Presentation transcript:

gLexec update GDB Maarten Litmaath CERN

Maarten Litmaath (CERN)2 SiteLCG-CE / OSG-CECREAMCapability ASGCNagios OK, my tests badAuthZ/config errorOK BNL CERNOK CNAFNagios ~OK, my tests badLCMAPS error FNALOK for CMS-OK IN2P3LCMAPS errorAuthZ errorOK (some CEs) KITOK NDGFn/a NIKHEFOK PICOK RALOK SARAOK TRIUMFNagios bad, my 2 tests OK-

Nagios tests for “ops” LCG-CE – servicegroup=SERVICE_CE&style=detail Many OK CEs appear as “unknown”, SAM team to investigate CREAM – servicegroup=SERVICE_CREAM-CE&style=detail No results, SAM team have been informed Maarten Litmaath (CERN)3