2013 Lexus LX570 Armoring process. ETA: 2 weeks This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.

Slides:



Advertisements
Similar presentations
Maternal and Child Health Bureau Seminars on Adolescent Health: Nutrition and Physical Activity, Part I July 30, 2003 Health Resources and Services Administration.
Advertisements

This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
ACSIP. Beebe Middle School ACSIP Plan: Math and Literacy.
Project Status Chemical Engineering Lab Scheduler Team 5 This presentation will probably involve audience discussion, which will create action items. Use.
Generation of highly parallel code for TigerSHARC processors An introduction This presentation will probably involve audience discussion, which will create.
Project Status Group B-4 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Customizing Word Microsoft Office Word 2007 Illustrated Complete.
Information & Computer Science Dept.
Al Akhawayn University School of Humanities and Social Sciences Communication Studies Course „Public Relations Communication“ Prof. Dr. Mohammed Ibahrine.
Introduction 12 VDC to 120 VAC Inverter Juan Tello This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
1 of 3 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Hospital Management System A complete solution for Hospital Services and Activity This presentation will probably involve audience discussion, which will.
MEDIEVAL UNIT This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action.
Integrating Technology into Business classes Michael Wong April 24, 2002 This presentation will probably involve audience discussion, which will create.
R. Rucinski, Fermilab Feb. 9, 2005 Project Status 2 cassette VLPC Cryostat Russ Rucinski - Fermilab This presentation will probably involve audience discussion,
Computer Science Program Center for Entrepreneurship and Information Technology, Louisiana Tech University This presentation will probably involve audience.
Breeding Excellence Abroad A Journey In the Caribbean This presentation will probably involve audience discussion, which will create action items. Use.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Chapter 3 – The Analysis Workflow CSC532: Fall 2003 Original presentation by Joshua Hughes Zehra Raoshan Kiran Balagani Guang Li This presentation will.
Albuquerque Plan Review: Regulations, Processes, and Recent Changes Bob Golden, Golden Associates LLC Expediter for Building Permits This presentation.
Mid Term Report Integrated Framework, Visualization and Analysis of Platforms This presentation will probably involve audience discussion, which will create.
Invoice Pick Entry - Menu Location Use this function to invoice orders from your location shipped via UPS.
My Life Scott Stillwell This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Karl Marx The German Ideology A Contribution to the Critique of Political Economy Prepared by: Erin Mustard Jackeline Hernandez This presentation will.
GRID Event display for the HRD D. Protopopescu University of Glasgow, U.K. DESY, Hamburg, May 2005 This presentation will probably involve audience discussion,
Evening High School Ms. Baisden Intro to Computers Intro to Word Processing Typing This presentation will probably involve audience discussion, which will.
CSC 532 Term Paper Topic decision: 10/10/02 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
Orchard-Maler Assertion Proposal SAML F2F #3 David Orchard, Eve Maler This presentation will probably involve audience discussion, which will create action.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
1 PowerPoint II Slide Transitions, Animations, and Links.
Manufacturer Reporting Update Matt McCarron, CIWMB This presentation will probably involve audience discussion, which will create action items.
THE BOOK BANK MAKERERE UNIVERSITY LIBRARY This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to.
How abstract components are returned when schema.getElementDeclarations() is called – an animation in 3 slides -- schemas that use and July 26, :00pm.
Irish Financial Regulator Requirements for Management of Liquidity Risk An Industry Perspective This presentation will probably involve audience discussion,
Electronic Engineering Dept.1 Final Year Project - Progress Presentation Wifi Controlled Robotics Mark Heneghan This presentation will probably involve.
Project Status [Project Name] [Presenter Name] This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
Health Resources and Services Administration Maternal and Child Health Bureau Presentation For DataSpeak May, 2003 Health Resources And Services Administration.
NYCDEP Harbor Survey Program Beau Ranheim Section Chief, Marine Sciences This presentation will probably.
IRRI - Genetic Resources Information Management System (GRIMS) This presentation will probably involve audience discussion, which will create action items.
Recycler Pbar Transfer -Gattuso 1 Recycler weekly Summary This presentation will probably involve audience discussion, which will create action items.
1 LoTAG conference – 11 th May 2015 LoHEG - London Highway Engineering Group Update Co-chair – Dale Foden/Ian Hawthorn This presentation.
LoTAG conference – 1st March 2016
The Rhetorical Triangle
Introduction to Rental Management
Continuous Random Variables
Einstein’s Special and General Theories of Relativity.
Pretest Chapter 17 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Final Project Presentation
Adding Priced subClins
Martha Grabowski LeMoyne College
واشوقاه إلى رمضان مرحباً رمضان
by Manish Shah & Eugene Park CSPP 523 Jan.21, 2002
Presented by: Arlene N. Baratang
Evaluation of Data Fusion Methods Using Kalman Filtering and TBM
Continuous Random Variables
Dartmouth College Status Report
IEEE Rail Transit Vehicle Interface Standards Committee
Baseline Matching / Grading
Test Flow: Acceptance & defect criteria The First half RUP summary
Lesson Seven: Maintaining Patient Lists
Project - Execution stage
Department of Information Technology (DoIT)
* L. E. Turner and M. R. Smith, University of Calgary, Alberta, Canada
INCB PERMITS & REQUIREMENTS FOR ESTIMATES.
7 - Managing - Misbehavior
Minnesota Counties Computer Consortium(MCCC) Community Registry
CBT Management and Process
Presenting Project Status
Integrated Cryptographic Network Interface Controller
Presentation transcript:

2013 Lexus LX570 Armoring process. ETA: 2 weeks This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab Type in action items as they come up Click OK to dismiss this box This will automatically create an Action Item slide at the end of your presentation with your points entered.

Chassis delivery & inspection Day 1: Chassis delivery Day 1: Chassis delivery Vehicle is inspected and road tested. Vehicle is inspected and road tested. Vehicle is assigned a production number Vehicle is assigned a production number Each vehicle is visually inspected daily by qualified quality control inspector. Each vehicle is visually inspected daily by qualified quality control inspector.

Week #1 Vehicle is stripped of all original parts Vehicle is stripped of all original parts All original parts are documented, numbered and stored. All original parts are documented, numbered and stored.

Week #1

Armoring process Minimal use of welding seams not to compromise the integrity of the ballistic steel Minimal use of welding seams not to compromise the integrity of the ballistic steel Armoring the vehicle firewall Armoring the vehicle firewall Armored overlaps and splash returns to prevent projectiles from penetrating through gaps. Armored overlaps and splash returns to prevent projectiles from penetrating through gaps. Rear bulkhead with complete ballistic armored overlap. Rear bulkhead with complete ballistic armored overlap. Custom heavy duty hinges to support the added weight of the armored doors and rear bulkhead Custom heavy duty hinges to support the added weight of the armored doors and rear bulkhead

Armoring process continued

Week# 2 reassembling the vehicle The exterior of the vehicle remains unchanged and is indistinguishable from the original manufacturers ’ The exterior of the vehicle remains unchanged and is indistinguishable from the original manufacturers ’ All original parts are reinstalled when permitted. All original parts are reinstalled when permitted.

Upgrade made to suspension & brake system Replace OEM brakes with HD Brake system to safely provide stopping power to the vehicle. Replace OEM brakes with HD Brake system to safely provide stopping power to the vehicle. Fully upgraded suspension to support the added weight of the armoring. Fully upgraded suspension to support the added weight of the armoring.

Finished product

Quality control Once the armoring process complete, our quality inspection department will subject the vehicle to a rigorous post production inspection. Once the armoring process complete, our quality inspection department will subject the vehicle to a rigorous post production inspection. Complete interior inspection to insure correct fit and finish. Complete interior inspection to insure correct fit and finish. Exterior inspection to insure no flaws or damage Exterior inspection to insure no flaws or damage Road test to ensure vehicle is operating at optimal performance. Road test to ensure vehicle is operating at optimal performance. BEFORE VEHICLE IS READY TO SHIP IT IS THOROUGHLY INSPECTED ONE LAST TIME IN ORDER TO CONFIRM THE ACCURACY OF THE PREVIOUS INSPECTION BEFORE VEHICLE IS READY TO SHIP IT IS THOROUGHLY INSPECTED ONE LAST TIME IN ORDER TO CONFIRM THE ACCURACY OF THE PREVIOUS INSPECTION