SPP.org 1. Economic Portfolio Update – CAWG Meeting – AEP Offices, Dallas August 27, 2008.

Slides:



Advertisements
Similar presentations
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
Advertisements

1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
Transmission Expansion Kansas Wind and Renewable Energy Conference Topeka, KS September 23, 2008.
Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July.
Evaluating the Benefits of the SPP EHV Buildout Moving forward on policy for funding 765 KV Larry Holloway CAWG Meeting February 25, 2009.
SPP.org 1. Draft Business as Usual Plan SPP.org 3 Wind - Business as Usual.
1 EPRI Funded RGGI Modeling Runs Investigating the Impact of Nuclear Power Plant License Renewal September, 2005 Modeling performed by ICF Consulting for.
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
Wind Energy Update October 6, OG&E’s Commitment to Wind Energy (2007) Make Oklahoma a national leader in renewable energy Mission Accomplished!
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
SPP.org 1. Priority Project Update Bruce Rew Vice President, Engineering.
Utility’s Perspective Of Future Transmission September 23, 2008.
Northwest Power and Conservation Council Effects of Alternative Scenarios on Sixth Power Plan Northwest Power and Conservation Council Whitefish, MT June.
Midwest Energy, Inc. Transmission Planning and Expansion
1 Renewable Energy in the Northwest: Wind Energy Presented By Stephen C. Hall STOEL RIVES LLP Journal of Environmental Law and Litigation Symposium University.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ERCOT PUBLIC 6/17/ LTSA Scenario Results June, 2014.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Business Sensitive Big Sandy 1 FGD Analysis February 2006 DRAFT Strategic Policy Analysis Portfolio Management Analysis Advanced Environmental Technology.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
SPP.org 1. Southeastern Inter-Regional Planning Update (SIRPP) Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
ERTAC Growth Approach - EGUs ERTAC-EGU Development Group - Webinar May 16, 2013 Robert Lopez, WI-DNR - Presenter.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
Allocation of CO 2 Emission Allowances in RGGI Dallas Burtraw, Karen Palmer, Danny Kahn Resources for the Future Presentation to RGGI Stakeholder Meeting.
PJM©2008 Potential Effects of Proposed Climate Change Policies on PJM’s Energy Market Paul M. Sotkiewicz, Ph.D. Senior Economist PJM Interconnection Organization.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
SPP.org 1. ESRPP 2009 Regional Studies Initial Results ESRPP Stakeholder Meeting August 12, 2009 Astor Crown Plaza New Orleans, Louisiana.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Balanced Portfolio 1 Project Original Cost Estimate Q Latest Update Cost Variance% Change Sooner - Cleveland 345 kV $33,530,000$58,906,000$59,880,000$26,350, %
Debra Lew, NREL (speaking for a large team at GE, 3TIER and NREL) UWIG Western Wind and Solar Integration Study Update.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
1.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
1 Rate Impact Task Force’s Updated Results for it’s Report to the SPP Regional State Committee January 24, 2011.
Rate Design Proposal for SPP: Integrated Transmission Plan and Priority Projects Mike Proctor CAWG May 27, 2009.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
Balanced Portfolio Update PCWG August 28,
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 2 Entergy ICT Transmission Planning Summit July 29, 2008 Astor Crown Plaza.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
OPPD’s Wind Development in Nebraska Nebraska Wind Energy Conference November 9, 2009 Christene Bywater, P.E. Project Manager.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
PJM ©2007 NERC LTRA Workshop August 16, 2007 Paul McGlynn Manager, Transmission Planning Department.
Forecasting Power System Hourly Load and Emissions for Air Quality Modeling ERTAC-EGU Model Development Group – Webinar & Outreach slides Robert.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
RENEWABLES AND RELIABILITY
Contents Introduction Focus area Wind scenarios
Entergy Integration Study Update
Texas North Transmission Improvements
Closing the Biomass Power Cost-Price Gap
Strategic Plan and Economic Upgrade Process
CAWG Teleconference – January 5, 2011
Presentation transcript:

SPP.org 1

Economic Portfolio Update – CAWG Meeting – AEP Offices, Dallas August 27, 2008

SPP.org 3 Portfolios - Review Portfolio 3 is associated with wind levels beyond the 2,600 MW in 2008 Previous Analysis 1.(April, 2008) show strong benefits for generic wind growth modeled at 7 GW in the SPP footprint. 2.(July, 2008) without wind above current levels, Portfolio 3 is not cost- beneficial Modifications to Portfolio 3 are required for: 1.Specific, not generic wind locations 2.Sizing and location of wind collector systems matched with assumptions on levels of wind generation. Portfolio 3-A is associated to current wind levels Previous Analysis (Sep, 2008) demonstrates benefits exceeding costs under current wind levels in SPP Portfolio 3-A is used to separate out the impact of carbon policy from wind development by keeping wind at current levels.

SPP.org 4 Portfolio 3 (with S-K-A*) Lines: Spearville-Knoll-Axtell* Spearville-Comanche Co-Woodward-Tuco Tolk-Potter Sooner-Cleveland Iatan-Nashua Pittsburg-Fort Smith Substation Upgrades: Anadarko Transformer Chesapeake Transformer Swissvale-Stilwell Tap (at West Gardner) El Dorado-Longwood Series Compensation

SPP.org 5 Potter Iatan Nashua Pittsburg Ft. Smith/VBI El Dorado Longwood Tuco Tolk Woodward Spearville Comanche Co Cleveland Sooner Anadarko XF Swissvale – Stilwel Tap Knoll Axtell Chesapeake Substation Upgrade New 345 kV Transmission Circuit New 765 kV Transmission Circuit Portfolio 3, w/ SKA

SPP.org kV Construction and Additional Wind Higher wind levels identify greater benefit for P3 April 2008 analysis used generic wind locations P3 at 345 kV probably will not support 7GW of wind Numbers shown are indicative, refined high wind analysis currently being conducted and will consider specific more wind locations * Note: Incremental 765 kV benefits not considered. Benefits show are for 345 kV construction Quanta EHV Study identifies 4,600 MW as the point 765 kV is required SPP higher wind (7,000 MW) analysis presented at April, 2008 CAWG identified large benefits for higher wind injection at generic wind locations *

SPP.org 7 Wind Injection Locations Adjustments for wind location have a large impact on design For example, only 240 MW modeled on Finney – Potter 345 kV line (e.g. Hitchland) despite the fact that queue has large development in that area Generation Interconnect queue has 8,000+ MW on this transmission line Higher levels of wind injection will likely need 765 kV support similar to Figure 1 Spearville Finney Comanche Co. Loop 1 Woodward Hitchland` Figure 1 -

SPP.org 8 Portfolio 3-A: For Analysis for Current Wind Levels of 2,600 MW Lines: Spearville-Comanche Co-Woodward-Tuco Pittsburg-Fort Smith Seminole-Muskogee Wichita-Reno Co- Summit Substation Upgrades: Potter Transformer = removed

SPP.org 9 Iatan Nashua Seminole Muskogee El Dorado Longwood Tolk Reno Co Spearville Wichita Cleveland Sooner Anadarko XF Swissvale – Stilwel Tap Summit Knoll Axtell Potter Chesapeake Substation Upgrade New 345 kV Transmission Circuit New 765 kV Transmission Circuit Portfolio 3-A

SPP.org 10 Carbon Tax ($/ton) Sensitivity SPP Staff has conducted a sensitivity to Carbon Tax on the Balanced Portfolio $15/ton and $40/ton simulated No additional changes (e.g. extra wind, etc.) Carbon analysis performed on Portfolio 3-A to tie impact to current levels of wind (i.e. 2,600 MW)

SPP.org 11 Carbon Impact on Portfolio 3-A 2012

SPP.org 12 Generation Displacement for P3-A

SPP.org 13 Carbon Impact on SPP System Prices

SPP.org 14 Carbon Tax & High Wind Carbon Tax lowers the margins between coal and gas, thus decreasing potential benefit available Wind analysis needs to be combined to determine impact of Carbon Tax and Wind Wind will offset higher carbon based production costs

SPP.org 15 Going Forward SPP is currently in the analysis stage for the high wind and future analysis model building, updating generator database, mapping, etc. Next Steps - Future (2017, 2023) analysis High Wind analysis (stand alone and combined with carbon sensitivity) kV construction/operation Impact on reliability plan (negative and positive) Determine balance adjustments Leading portfolio moved to approval

SPP.org 16 Pittsburg Ft. Smith/VBI New 765 kV Transmission Circuit Pittsburg – Fort Smith/VBI vs. Seminole - Muskogee Seminole Muskogee

SPP.org 17 Questions/Comments

Charles Cates Engineering, Planning