NETS Network Upgrade!.  304 Telecommunication Outlets (TO's) each with 4-copper and 4-fiber connections were installed.  255,000 Feet of CAT6A copper.

Slides:



Advertisements
Similar presentations
The Lone Star College System 13 Locations spread across 1,400 square miles 5 Colleges 2 University Centers 5 Centers System Office & Training Center 4,800.
Advertisements

PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
AT&T strives to provide a smooth and successful installation experience for our Customers. We will do all that we can to install your service on time and.
Industrial Bus Health Test using Fluke 225C Color ScopeMeter Application.
Back to the Future? Electrical/Lighting Contracts Ted Swansegar.
Cabling system components
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Substation L1/ MCC L1 Update March 21 st, Current Location.
Chapter 3: Planning a Network Upgrade
Cisco 6500 E-Series Chassis Up-grade
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Capital Program Update Maintenance Garage On schedule - Final Completion is May 19, 2007 but the District needs to move in April because the.
Relocation of the Operations Control Center Oil Movements May 4, 2007 For RCAC Board Meeting.
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
ABANDONED CABLE REMOVAL Big Opportunity for Contractors By Frank Bisbee.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
© 2014 Rockwell Collins. All rights reserved. Middle East Airport Construction Projects: Lessons Learned From an ICT Perspective May 2015.
CSE 550 Computer Network Design Dr. Mohammed H. Sqalli COE, KFUPM Spring 2007 (Term 062)
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Ferndale Electric Company Project overview from September 2007 to present.
Genesis Solar Module Brochure ™
Project Management. Managing Capital Projects  What is a Project?  Something that: has a beginning and an end, and is carried out to meet established.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
COMMUNICATIONS DESIGN AND IMPLEMENTATION 2010 Communications Design in Military Projects.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
University of Michigan, CSG, May 2006 UM/MITC Data Center.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Fiber Optic Data Network Project Tuscaloosa County School System 2006.
HORIZONTAL SUBSYSTEM. CABLING SYSTEM Horizontal Subsystem The Horizontal cabling subsystem is the part of the Signamax Cabling System that extends from.
IPT Upgrades 2008 Paul Dial and Teresa Shibao May 22, 2008 Paul Dial and Teresa Shibao May 22, 2008.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
PROP K UPDATE Citizens’ Oversight Committee Meeting October 17, 2013.
AP-1 5. Project Management. AP-2 Software Failure Software fails at a significant rate What is failure? Not delivering it on time is an estimation failure.
SpaceOps Stockholm Page 1 SpaceOps 2012 Stockholm Col-CC Voice System Migration During On-Going Operations Thomas Mueller, DLR,
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
CABLING SYSTEM ADMINISTRATION. Administration Concept.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
LABELING PRESENTATION BY WES WILDCAT WILDCAT PRODUCTION.
Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity.
Presented by Matt McClymonds.  Project Essentials ◦ Project Objective  Prepare the campus for a new telephone system ◦ External Conditions  Converged.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
TELECOMMUNICATIONS SPACES
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
AT&T Managed Internet Service (MIS) with Ethernet Customer Site Preparation Document This document addresses Customer sites that do not have AT&T fiber.
Type of Project ShahRukh Haider. Main Type  Major Types of Projects Based on Product of Project  Here is a list of nine different types of projects.
Activity # 1 Problem Solving/ Engineering Design Process IET 120-Technology Systems Team Harris & Jent.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
September 30, 2008 Jim Van Dyke, Web:
Estimating and Scheduling CEE 492
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
Presenter: Igna Visser Date: Wednesday, 18 March 2015
HVAC Replacement Case Study
Pre-Bid/Proposal Meeting
The Lone Star College System
The E-Rate Program Eligible Services Fall 2011 Applicant Trainings.
IT Infrastructure Committee
Hopewell Valley Regional School District
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Perfect Telecom Services Managed Services &
Presentation transcript:

NETS Network Upgrade!

 304 Telecommunication Outlets (TO's) each with 4-copper and 4-fiber connections were installed.  255,000 Feet of CAT6A copper cable were installed, over 48 miles.  60,000 Feet of Multi Mode OM4 fiber were installed, more than 11 miles  2432 station fiber terminations trunk fiber terminations were completed.

Install new, ground up, network in 3300 Mitchell Lane capable of supporting current and foreseeable networking needs in accordance with NETS, NCAB, UCAR/NCAR, BICSI, and federal, state, and local jurisdictions building codes.

 A method to deliver a project in which the design and construction services are contracted by a single entity. It relies on a single point of responsibility and is used to minimize risks for the project owner and reduce the delivery schedule.

 The design build can take the owner out of the loop by the contractor/designer making decisions that the owner should be involved in. In the more traditional Design-Bid-Build, Change Controls are more prevalent and keep the Owner more informed and there more involved in the project.

 Ed Snyder (Primary)  Fabian Guerrero (Second)  Mike Martinez (On Site Supervisor)

 Bryan Anderson  Rick Mumford  Jerome Martinez  Carlos Rojas-Torres  Wes Wildcat  Armando Cisneros  Teresa Shibao  NETS Admin Team

 3-year Bond (Equipment) $0  15-year Bond (Permanent Infrastructure) $300,000  Conduit Installation $150,000

 3-year Bond -$0 - Existing equipment used.  15-year Bond $298,188.2  Conduit Installation $150,000

◦ Marking of facilities not to be demoed ◦ Temp (construction) network installation ◦ Relocation of Multi-use fiber to FLA ◦ Relocation of FLR(B) to FLA ◦ Preparing drawings for installation crew ◦ Order all parts for installation

 NETS work during contractor work ◦ Monitoring contractor progress to ensure that network specifications were being adhered to ◦ Attending OAC Meeting to ensure that changes were not made that affected the NETS installation ◦ Scheduling NETS installation with other trades

 Project installation followed construction progress ◦ installation of distributor [room] infrastructure (tray, racks, and cable managers) ◦ cable installation and termination ◦ Testing and documentation ◦ Coordination of people move information

 Equipment installation followed construction progress ◦ installation of network equipment:  Switches, VG242’s (analog), UPS’s, AP’s, Monitoring (Geese), Patch Cables ◦ Activation of network ports: Network, Analog, Special ◦ Verification of networks

 The project schedule changed due to ◦ HVAC Design and Installation problems  Installation of additional Ducting all floors  Room remodel required on all floors  Replace undersized fan on roof  NETS Schedule ◦ Personnel then reassigned to other projects  NWSC  Marshall  Ongoing normal WR’s

 Previous occupants returning, few new phones needed  AP’s already in update schedule  Reusing the NETS Switches and UPS’s ◦ Not due for regular replacement ◦ Still under maintenance

 Keeping the installation up to UCAR/NETS Standards when the scope of work changed ◦ Full remodel instead of partial ◦ Addition of Comm Outlets after budget set ◦ Multi-use fiber removal and replacement ◦ All new comm conduits throughout the building

 Strong technical installation team  UCAR/NETS Specifications  All Product arrived on time  Same electrical contractor as FLA

◦ Construction timeline  Comm Rooms and Chases built first  Always Promised  Never Delivered ◦ Move Template Information  The sooner the better  From NETS sooner  To NETS sooner

 Comm Room size, minimum of 130 sq ft, prefer 150 sq ft  Only straight sleeves in cores between floors  Increase the number of cores between floors ◦ Increased size of cable  Daily morning meetings kept the whole team informed to the ever changing Design build Project. This is critical for keeping ahead of a project of this size.

 BAS on NETS cabling ◦ Building Automation Systems  Becoming Industry Standard to use IP ◦ Space in our cores ◦ Space in our Comm Rooms  This project was a design build ◦ Design and Construction done together ◦ Changes come fast and often ◦ Harder for NETS to remain within budget

 Thanks to the NI Crew for all of the hard work and long hours that went into this project.