SRWG Update to TSS February 2015, Meeting 168 WECC HQ

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Advertisements

PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
WECC Reliability Based Control Field Trial
DEP TRANSFORMATION Air Permit Review & Process. 2 ITEMS DISCUSSED Permit Format Streamlining of Compliance Plans Level of Monitoring Level of monitoring.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
Public Service Company of New Mexico
SRWG Chair Report March 2015 WECC HQ
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Branden Sudduth Director, Reliability Assessment and Performance Analysis Rocky Mountain Region PA/PC Meeting March 18-19, 2014 Denver, Colorado.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Discussion of MOD Comparison to ERCOT Requirements Luminant OWG, May 21,
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
BCCS Update Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
Joint Electric Scheduling Subcommittee Update October 29, 2013.
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting January 12-13, 2016 Phoenex, AZ.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
1 Progress Report Policies and Procedures Tom Green PCC Salt Lake City July 15, 2014.
Temporary Assistance for Needy Families Part 265: Data Collection and Reporting.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Nick Hatton Associate Staff Engineer
WECC MAC Committee Update
Philip Augustin TSS Chair
CIIMS Proposal for TOP-003 Approach
Eleanor Ewry Base Case Coordination Subgroup Chair
Nick Hatton Associate Engineer March 9, 2017
Base Case Build Process
Jonathan young ColumbiaGrid
2017 System Assessment Jonathan Young February 2017
Andrew Christensen, SDWG Chair
System Review Work Group
Jonathan Young SDWG Chair
Base Case Build Process
Andrew Christensen, SRWG Chair
SRWG Chair Report March 2015 WECC HQ
Steve Rueckert – Director of Standards
Tracy Rolstad TSS Chair
Jon Jensen Associate Staff Engineer
Jonathan Young SDWG Chair
LMSC Policy and Procedures Update
Andrew Christensen, SRWG Chair
System Review Work Group Update to TSS
System Review Work Group Update to TSS
WIAB WECC Interchange Authority Backup
Jonathan Young ColumbiaGrid
Presentation transcript:

SRWG Update to TSS February 2015, Meeting 168 WECC HQ John Gross SRWG Chair SRWG Update to TSS February 2015, Meeting 168 WECC HQ

Topics Model Implementation Schedule Base Case Coordination System Status MOD-032-1 Implementation Study Program Subgroup Annual Survey Modify 2015 schedule – load description and case schedule Efforts needed to model interchanges Compliance Subgroup PSS replog… DPM – 4 digit zone numbers Representation of BA? Contingency Analysis by WECC

Model Implementation Schedule Modified schedule for time overcurrent For >100 kV (>200 kV was due with 15HS4) Split schedule into Transformers and Lines Transformers due 9/11/2015 with 16HS3 Lines due 2016 with case TBD

Base Case Coordination System Does is work? Will it work? SRWG consensus: technically it will work Status update from WECC Staff

MOD-032-1 Implementation Modification of Data Preparation Manual Change applicability from “Member Systems” to Planning Coordinators Development of data requirements and reporting procedures Planning Coordinators include the DPM as part of their documentation MOD-11 & 13-WECC-CRT-1 Will be retired, requirements moved to SRWG documents Accounting for Planning Coordinators Add new fields in software to function similar to Zones Approval Item: MOD-032-1 Implementation

Study Program: Annual Survey Transmitted December 22 Responses were due January 16

Study Program: Load Description What is the purpose of WECC base cases? Meet individual company study needs Interconnection wide study New description Expected peak or minimum for month – month Specific hours XX00 – XX00 MST Historical Balancing Area loading used to pick hours

Study Program: 2015 Schedule Incorporates new load description Adjusted schedule for 2016 Summer Ops Ops cases needed sooner for studies TEPPC case slides back in schedule Approval Item: 2015 Base Case Compilation Schedule rev 3

Study Program: Interchanges Identified need to improve interchanges Consistency between 1, 5, and 10 year cases Specific issues related to HW and LW flows Effort to collect historical data started Interchanges between what? “Area” to “Area” BA to BA PC to PC Paths

Compliance: Representation Log Status update Counts are steady, Long ID data improved Requested changes Split PSS column: exempt generators and model missing Exempt generators are not a modeling issue Replog presently show model missing

Compliance: Data Preparation Manual Added four digit Zone numbers Approval Item: Data Preparation Manual v? July 18, 2014 Edited and Formatted 4 Digit Zone addition Non-BCCS July 18, 2014 Edited and Formatted 4 Digit Zone addition MOD-032 Implementation BCCS DPM Revisions

Compliance: BA Representation TSS guidance on need to represent Balancing Authority areas?

Contingency Analysis by WECC Presentation by Nathan Powell

Attached Documents Model Implementation Schedule SRWG MOD-032-1 Implementation DPM Revision for MOD-032-1 2015 Base Case Compilation Schedule Representation Log DPM revision

Questions?