Standardization of the process flow at the wash and weigh station will allow for three advantages to the previous process. One would allow you to know.

Slides:



Advertisements
Similar presentations
© BMA Inc All rights reserved. Decision-making Making routine decisions without the help of standard costs.
Advertisements

Immediate Communications Visual Management Automatic Data Collection Andons Real Time Performance Visibility Wireless Innovations for the Production Floor.
By Anastasia Lidya Maukar
Presentation for Company x
Main Menu F3 Exit = Press F3 to exit this screen. Commonly Use Keys: F4 Prompt = Position cursor in front of ‘?’ location and press F4 to display a list.
Multidisciplinary Senior Design Rochester Institute of Technology Dresser-Rand Painted Post P10459 MSD II Update Presentation 4/9/10 Team: Phil Eaton (ME)
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.
Process Selection and Facility Layout
1. PROBLEM STATEMENT 2. DESIGN BRIEF 3. INVESTIGATION 4. PROPOSAL 5. INITIAL IDEAS 6. RESEARCH 7. DEVELOPING THE CHOSEN IDEA 8. PLANNING 9. MAKE/MANUFACTURING.
ArrivalsServiceWaiting line Exit Processing order System Queuing Systems: basic elements.
McGraw-Hill/Irwin Introduction to QuickBooks Pro, 2004 © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 13 Budgeting, Forecasting,
Process Analysis 102 Quality: The Basic Tool Kit.
Anion Exchanger Kristen Galea. Where Are We With in the Process? Entering stream is concentrated with, insulin ester, and denatured proteins This separation.
Internal Adaptations Objective: Students will investigate and explain how INTERNAL structures of organisms have adaptations that allow specific functions.
Supplier Development Kaizen Implementation Kit
PART-2. Access the functions as described. Accessing functions. To change the accessing password, follow the steps below. Use the NEXT key to select:
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
Author: David He, Astghik Babayan, Andrew Kusiak By: Carl Haehl Date: 11/18/09.
Material Handling Conventional. Operations Process (Flow) Chart Flow diagram is a plan of work area, indicating the position of machines, flow of materials.
Just-In-Time “Eliminate Waste”.
R-I-T Project Improvement Project Matthew Bonaventura Jimmy Ichihana Eric MacCormack Cody Rath Colin Roy.
Operations Management
Structure and Synthesis of Process Flow Diagrams ENCH 430 July 16, 2015 By: Michael Hickey.
Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.
Pipelining By Toan Nguyen.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
SchedulingProducingControllingSchedulingProducingControlling.
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles January 2002.
Value Analysis/ Flow Analysis
WGEP - Case Study Larissa Albuquerque Marques Silva Gabriel Luís Anibal de Oliveira Aaron Brantley 9/17/2015 Brantley | Albuquerque | Oliveira 1.
Analyze Opportunity Part 1
P13458 RIT Senior Design Team March 22, AM-11AM Dresser- Rand, Painted Post Air Bearing System & Layout.
McGraw-Hill/Irwin.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
Flowcharting A Quality Improvement Tool. Quality = Inspection Statistical methods assisted in prevention of defects – The need for inspection declined.
Process Layout Chapter 7 July 20, 2005.
SchedulingProducingControllingSchedulingProducingControlling.
NFFFFFFFFFFFFFFFFFFFFFFFFFF FFFFFFFFFFFFFFFFFFFFFFF F G ü ldiyar Ç ETİN Ö zg ü r Ö ZERTEN Furkan YAL Ç IN
Aggregate Planning and Resource Planning Chapters 13 and 14.
Chapter 6 Facilities Layout.
Budgeting, Forecasting and Business Planning Chapter 8.
THE INVENTORY ROUTING PROBLEM
Activity Scheduling and Control
ECOLOGICAL PYRAMIDS  A diagram that shows relative amounts of energy or matter within each trophic level.  3 Types: –Energy Pyramid –Biomass Pyramid.
FMS 300 Series FBP-FMS320A Introduction to Flow Series: FMS320 to FMS325.
Presented by: Angela Smith ∙ Dennis Hugo ∙ Kevin Messer Marie Barraclough and Austin Hanson.
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
Facility Layout Objectives of Facility Layout Basic Types
Planning Quality Framework. Planning Quality Framework in partnership with Planning Advisory Service (PAS) This is a national initiative aimed at improving.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
HO CHI MINH CITY NATIONAL UNIVERSITY HO CHI MINH CITY UNIVERSITY OF TECHNOLOGY SYSTEM ANALYSIS AND DESIGN LECTURER: Nguyen Thanh Tung.
Product Development Chapter 12. Vocabulary Research and development (R&D): the process of gathering information and using that information to develop.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
XBIS 219 Week 5 DQ 1 What are the main responsibilities of managers? What are the advantages for managers to use IT support in business decision-making?
Materials Management Intro, Definition, Functions, Objectives, Stages, Factors responsible, Importance.
The Four-legged Water Walker
Process Layout Chapter #6.
Pack Level (End Item Assembly) Testing
The University of Jordan Mechatronics Engineering Department
Productivity and Process Analysis
Tandem Bike Storage Proposal
PHL 320 Week 4 Apply: Reason for Change Presentation //Download Your Course Here:
The Automation of the U.S. Budget Appendix Volume
Financial Bliss Porter’s Five Forces and porter’s value chain
Agenda I. Business Overview ● Business Summary ● Capabilities
Manufacturing Production Planning
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
Customer Needs Specifications Final Design Improvements
Presentation transcript:

Standardization of the process flow at the wash and weigh station will allow for three advantages to the previous process. One would allow you to know if the product prevents a problem two weeks earlier, the second is eliminating the need to handle the product an additional time, and the third is to have weigh data and height data entered into the database in real time. The end result would be to know that the product passes all the required specifications before being released to pack in the final assembly, eliminating the opportunity for questionable product to go to the customer.

Long process time between manufacturing of cells to the final release of cells. Fractured system did not provide the needed timely feedback to manufacturing line. After stream lining the process the time frame for feed back of finding under weight cells or short cells was decreased to 7 days.

Comparing previous method to proposed method Flow Chart before standardization

Charts below show display the possible failures with current process

Process flow is not utilizing the equipment or minimizing the amount of handling If you move equipment around correctly process will flow better.

Process flow change Decisions made sooner

Chart shows improvement with new process flow of wash and weigh area Limiting the amount of time information is fed to the subassembly line