BIM, Open Standards, and Pre-Plans Golden Gate Safety Network Building Service Performance NYC BIM Interest Group 18-Feb-2009.

Slides:



Advertisements
Similar presentations
Firemans Digital Keybox A work in progress for Building Emergency Response Scenario comments By Deborah MacPherson, Specifications and Research WDG Architecture,
Advertisements

THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program The “Safety Engine” Concept – Part 1.
BIM, Open Standards, and Pre-Plans Golden Gate Safety Network Building Service Performance NYC BIM Interest Group 18-Feb-2009.
Emergency Response Planning and BIM February 18, 2009 Greg Jakubowski, P.E., CSP, FSFPE Principal - Fire Planning Associates, Inc.
CODE REVIEW: DOH Article 28 Compliance Establishing a Feasibility process that is focused on compliance with New York State Department of Health rules.
Copyright, EPM Technology AS Kjell Bengtsson EPM Technology
National Incident Management System
Computer Integrated Manufacturing CIM
August 27, 2009 GENERAL DYNAMICS Advanced Information Systems 1 NYSDOT.
1 Senn, Information Technology, 3 rd Edition © 2004 Pearson Prentice Hall James A. Senn’s Information Technology, 3 rd Edition Chapter 11 Creating Enterprise.
Understanding Multiagency Coordination IS-701.A – February 2010 Visual 2.1 Unit 2: Understanding Multiagency Coordination.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
Contractor Safety Training | Westbrook | 1 Emergency Response.
AFFORDABLE MULTI-FAMILY HOUSING ORGANIZATIONS CREATING A DISASTER RESPONSE STAFFING PLAN THROUGH ADOPTION OF ICS Presentation to the Learning Collaborative.
WELLINGTON COUNTY CONFINED SPACE. Learning Outcomes The participant will:  Assess hazards associated with Confined Space Entry  Identify a Confined.
Incident Command and Unified Command 1293 Airport Road Beaver, WV Phone: (304) Fax: (304)
Managing Company Tactical Operations
Business Owners and Managers and the Fire Code
Dangers of Engineered Wood “I”-Beam Floors Make Everyday a Training Day…So that Everyone Goes Home c NFFF Firefighter Life Safety Resource Kit.
Higher Regulatory Standards Series 430. Higher Regulatory Standards 432 Elements Dougherty County (2007 Manual) – Total Points: 2740 – Activity 430.
ON THE ROAD TO BUSINESS APPLICATIONS OF SEMANTIC WEB TECHNOLOGY Sematic Web in Business - How to Proceed IASW Kari Oinonen Kiertotie 14.
SOFTWARE ENGINEERING BIT-8 APRIL, 16,2008 Introduction to UML.
Requirements 101 CS3300 Fall 2015.
International Fire Door Inspector Association Presents New Annual Fire Door Inspections NFPA 80 – 2007, 2010, 2013 Standard for Fire Doors and Other Opening.
Fire Safety Director’s Association of Greater NY By: Robert Burton and Tom Chiginsky Blue Water Partners Global, LLC Testing Emergency Operation Centers.
Building Codes. Codes  Building Code –Regional  BOCA, SBCCI, CABO, UBC, CITY OF DALLAS, –National  IBC  Fire Code –NFC, UFC, NFPA, Life Safety 101.
1 Infrastructure Solutions Division The Convergence of Architectural and Engineering Design and GIS: Implications for Emergency Response and Urban Planning.
GIS: An essential tool in every Emergency Operation Center (EOC) Jeff Stauber, Green Bay Fire Chief Ed Sheppard, State of Wisconsin Terrorism Exercise.
Metadata and Geographical Information Systems Adrian Moss KINDS project, Manchester Metropolitan University, UK
ITS Emergency Management Are You Prepared? Philip R. Mann, P.E. City of Gainesville, Florida Public Works Department.
1 ISE 412 Usability Testing Purpose of usability testing:  evaluate users’ experience with the interface  identify specific problems in the interface.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Chapter 7 Preincident Planning. Objectives Describe the concept of a preincident plan. Describe the phases of preincident planning. Describe the various.
UML as a Specification Language for Embedded Systems. By, Mir Ahmed Ali, Asst. Professor, ECM department, SNIST. By, Prof. Narsiah sir, Director of School.
Ontology Across Building, Emergency, and Energy Standards Presented by Deborah MacPherson and Michelle Raymond Building Service Performance Project.
Project Deliverables CEN Engineering of Software 2.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
TRANSITION TO COMPANY OFFICER Arlington Fire Department Officer Development September 2000.
3 Rescue Incident Management. 3 Objectives (1 of 4) Describe the characteristics of the Incident Command System (ICS) and the functions of positions within.
Area of Refuge It’s the Law!
CAD Versus BIM BIM systems contain several noticeable improvements over their CAD predecessors. These improvements lie within the modeling and design features.
Making Friends with Your Public Works Department Using GIS Sherry Coatney Intergraph Corporation
METHODS PLANNING. Methods Class 4 Agenda 1. Overview of Ontario Curriculum Documents 2. Introduce lesson plan formats – GPF & APF 3. Sequence for planning.
Information Architecture & Design Week 9 Schedule - Web Research Papers Due Now - Questions about Metaphors and Icons with Labels - Design 2- the Web -
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
Open Floor Plan Display The goal of this prototype is to demonstrate a simple lightweight file format for representing major aspects of building information.
Object Oriented Programming and Data Abstraction Earl Huff Rowan University.
Application of the ISO for BIM Xenia Fiorentini, Engisis.
Enterprise Architectures. Core Concepts Key Learning Points: This chapter will help you to answer the following questions: What are the ADM phase names.
EastCoast CAD/CAM IFC COBie Plus (via Fabrication for AutoCAD MEP) David E. Quigley, Chief Operating Officer Keith Brown, MEP Consulting Engineer 2013.
3M B&CSD - Fire Protection Space for 3M Montage © 3M All Rights Reserved. 3M Fire Barrier Duct Wrap 615 For Ventilation Ducts.
Firefighter Emergency Escape Systems New York State Department of Labor Public Employee Safety and Health (PESH)
Civil Unrest Emergency Responder Forum. Definitions  Civil Unrest – civil strife.
Fire Service Incidents. Today’s fire service does much more than fight fires. The Fire Service has become the primary source of emergency response and.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
CODE REVIEW: DOH Article 28 Compliance
Hazardous materials: What to look for
Object-Oriented Analysis and Design
Unified Modeling Language
Emergency Evacuations: Multi-Level Apartments
NICET Fire Alarm Tech Level 1 Practice Test # 2
Life Safety Drawing Template
General Requirements of NFPA 101
Web Services Interoperability Organization
East Contra Costa Fire Protection District Strategic Plan
Database Management Systems
UML  UML stands for Unified Modeling Language. It is a standard which is mainly used for creating object- oriented, meaningful documentation models for.
Presentation transcript:

BIM, Open Standards, and Pre-Plans Golden Gate Safety Network Building Service Performance NYC BIM Interest Group 18-Feb-2009

Questions from Greg Jakubowski, P.E., CSP, FSFPE, Principal and Chief Engineer, Fire Planning Associates Q: …must have pre-incident information about buildings, how can we achieve that through BIM? Q: Who will use this information and what do they need to know? Q: Who has that information? Capturing through design and construction, annotated pictures and diagrams, must be a common format.

How Can the Open Floor Plan Display Project Help? Q: …must have pre-incident information about buildings, how can we achieve that through BIM? A: By limiting building information exchanges to only what is needed by fire services and useful to police. By easing terminology differences ~ developing a process and definitions at a level the basic concepts belong to everyone. Q: Who will use this information and what do they need to know? A: In this case, Fire Departments, Owners, and Inspectors. Where possible, use existing ISO, IBC, IFC, NFPA standards to facilitate efficient documentation and strong communication chains. Q: Who has that information? Capturing through design and construction, annotated pictures and diagrams, must be a common format. A: Construction Operations Building Information Exchange (COBIE) can already perform many of these tasks. A deliverable of the Open Floor Plan Display Project is a set of recommendations, guidelines and mapping to relevant code citations, standards, and best practices using XML and COBIE.

What is COBIE? “… not for working, only for the exchange” Bill East USACE

Talking to the Building 1.Where are you located? 2.What kind of building are you? 3.Who are the occupants? 4.Where are the exits, elevators, stairs ? 5.Where is the fire? 6.How has the fire progressed? 7.What else is in this building?

Locating the Building using BIG web standards Geoconcepts Ontology v1.2 & v1.2_swrl at Geospatial Meaning: Geospatial Semantic Web Research. GeoWeb TGeoconcepts Ontology v1.2 & v1.2_swrl at Geospatial Meaning: Geospatial Semantic Web Research. GeoWeb Trends

Limiting Building Information What do fire service organizations want to know? Meet Local Code! Additionally and consistently mentioned: Storage or Use of Flammable or Combustible Materials Structures susceptible to early collapse Hazardous openings Heavy Items Potential Traps such as swimming pools Lobbies on multiple floors Counterflow in stairway lower levels

Functional Display Requirements Refer to International Fire Code, Section 509 The fire command center shall comply with NFPA 72 and contain the following features: Schematic building plans indicating the typical floor plan and detailing the building core, means of egress, fire protection systems, fire-fighting equipment and fire department access. “… some people are passionate about access flooring” Mark Kalin SCIP Same is true open standards

Open Floor Plan Display Problem Space STATIC - Prepared ahead of time, each building and jurisdiction may be different OSHA's Interactive Floorplan Demonstration DYNAMIC - Interoperable, Systematic Any vendor or public safety organization can use CurrentFuture SVG Recognizable Symbol

Anyone can, Sign up, Log In, and Work On

Format Preparation Guidelines The proposed floor plan data exchange format is meant to be general purpose irrespective of the size, shape, or age of the building. Therefore it is important to recognize the starting point for deriving this format may vary greatly from one building to the next. Several examples, from old to new, are as follows: Old Building, No Floor Plans Old Building, Paper Plans Recent Building, Un-conformed CAD Recent Building, Good CAD Practices Current and Future Buildings, Advanced CAD Practices

Designing to a Fully Functional City Fire Department of New York Selects IBM for Intelligent Fire Safety System Monday January 12, 2009, 10:20 am EST A single, unified view of a property; Improved resource deployment and utilization for inspections; Expanded management, Analysis and preparedness planning; A risk-based inspection system for field inspections. NIST BFRL scenario shares some common goals

Standardizing BIM and GIS Symbology Can’t Capture It All Creating Templates

Open Standard Context will help whole systems work together better sooner or later. Today, Open Floor Plan Display only. CurrentFuture An Easy Rapid Prototyping Technique with Point Cloud Data by Pralay Pal in the Rapid Prototyping Journal

Useful Sooner Linking BIM to GIS

Sooner: Building A Limited Dictionary

Sooner: Lightweight Stand Alone Floor Plans

A Beneficial Case Study: Worst Case Scenario Agreement on Floor 0 GINA MARIE>Around Auckland (and Kapa Haka Performance)

A Beneficial Program: Architect / Owner / AHJ CurrentFuture “Imagine a volunteer program, We’re here to help you with your building documentation” David Coggeshall on the phone “Should work with a fully Functional AHJ such As Arlington County” “Someone has to pay for All of this” Discussions at WDG

Turn over to David Coggeshall SFC MapLab Common Operating Picture Concept Open Floor Plan Display Demonstration