SCIF Solutions ®, Inc. First Army SCIF Brief October 21, 2009.

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

A Service Disabled Veteran Owned Small Business. A FULL SERVICE ELECTRICAL CONSTRUCTION COMPANY.
© 2014 MAIN STREET LED SIGNS, LLC MINDEN, LA. Yes, modular display components are changing the way we do business. But how? And why is that important.
Sensitive Compartmented Information Facilities (SCIF)
Built Rite Industries Los angeles, CA & Savannah, GA Office Kit Presentation ©. Copyright of Built Rite Industries, LLC.
Closed Area Construction
Steel Outlet Boxes Crouse-Hinds Training Module. Outline z Applications z Types of Steel Boxes y Options z Uni-Mount TM Cover z Pre-Fabricated Boxes z.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
JJ, your No.#1 high quality manufacturing source ! Electrical Products Since 1998.
“Sustainable Building Systems and Construction For Designers” Chapter 7: Walls.
Skyscraper Construction
Tel: Unique Home Security Systems Security Supplies Captures Boards Digital Video Recorders Power Line Communication Wireless Solutions.
Network Engineering Taster Day Mark Clements. 30 March 2012Engineering Taster Day 2 Welcome to Engineering Taster Day: Morning Session Ambassadors Fire.
PROVIDING next generation SCIFs worldwide!
Class Day Seventeen.
By.
Constructing Structures
March ULTIMA Portfolio For Sourcing Wireless Networking Page 1 Your Wireless Network requirements.
(part 4).  Gateways  A gateway is responsible for translating information from one format to another and can run at any layer of the OSI model, depending.
Chapter 7 Metals.
Unit Outline Information Security Risk Assessment Module 1: Introduction to Risk Module 2: Definitions and Nomenclature Module 3: Security Risk Assessment.
Fire.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Tel: Unique Home Security Systems Security Supplies Captures Boards Digital Video Recorders Power Line Communication Wireless Solutions.
SESAM electronic security systems 1. Sesam is a full developer, manufacturer and distributor of - access control systems and related software - intercom.
"Secure Wall" High Security Fence System * Patent Pending * Created and Fabricated by: South Lyon Fence Co., Inc.
What You Need to Know About EPA’s ENERGY STAR Certified Homes Program Learn more at energystar.gov 1.
Three Lines of Defense Presented by the Arapahoe County Sheriff’s Office.
Constructing Homes and Other Buildings
BUILDING CONSTRUCTION V ARCHITECTURAL FINISHING SYSTEMS
School Technology Solutions, LLC Technology Audits What's in it for you? 4 th Annual SW/WC Technology Conference March 11, 2010 Presenter: Lee Whitcraft.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Service Section Technical Training Dec A Standard Wireless Networking Protocol Zigbee Wireless Technology.
Profile Series v.S1 Intelligent Power over Ethernet Access Control Solution With the power of iCLASS.
INTRUSION ALARM TECHNOLOGY
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Energy Performance and Moisture Control of Ceilings and Roofs 1.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Security Professional Services. Security Assessments Vulnerability Assessment IT Security Assessment Firewall Migration Custom Professional Security Services.
Finishing the Building
Provider of Near Space Solutions. Tactical Ballooning & Return Vehicles A New Paradigm for Low Cost Near Space Access & Persistence Near Space Corporation.
Common Components of a Traditional Wood Framed Building
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
Residential Construction Mr. Todzia
Wood Construction CTC-375.
INTRODUCTION The company started the production of metal products in 1992 and prefabricated modular buildings in Harmet’s product range includes.
Navigating IT Solutions.Delivering Results. Bay State Proprietary l CAPABILITY BRIEFING FOR MITRE 12TH SERVICE ORIENTED ARCHITECTURE.
Doane Pet Care Company Pet Food Safety System (PFSS) M.W. Merkel September 23, 2003 Animal Feed Safety System Public Meeting.
Physical Security Concerns for LAN Management By: Derek McQuillen.
Estimating and Scheduling CEE 492
We are one of the accredited manufacturers and suppliers of Accoustic Enclosure and Sound Proofing in northern part of India under brand Name of "DDSTHA".
Physical Security at Data Center: A survey. Objective of the Survey  1. To identify the current physical security in data centre.  2.To analyse the.
Strong room Vaults How do vault doors work  Strong room vaults are a kind of safes meant to protect your valuable assets from burglary, theft and fire.
26’ Mobile Kitchen. 26’ Catering Kitchen Trailer In stock and ready for delivery. Trailer details/features General Features: Aluminum diamond plate.
Lighting Retrofit Assembly (LRA)
SIMPLE & MODULAR PC BASED DOOR ACCESS CONTROL v1.00
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Children’s Section of the Library Entrance lobby from Main Street looking east.
Hailo US Tower Equipment Manufacturer
Objective 6.02 part 2: Recognize components of construction
Factory Tour 2008.
A Sanctuary in Your Yard
Chapter 19 Electrical Plans.
Common Components of a Traditional Wood Framed Building
Presentation transcript:

SCIF Solutions ®, Inc. First Army SCIF Brief October 21, 2009

 Agenda  Continental Breakfast  SCIF Brief  Introductions  Company and Products  Specifications and SCIF Accreditation  Walkthrough Preview  Q&A Tour vans depart for Walkthrough Tour vans depart for Walkthrough  Walkthrough  Stop 1: Manufacturing Facility  Stop 2: Lunch break  Stop 3: Staging/Finish Lot Tour vans return to hotel Tour vans return to hotel  Afternoon Break, Q&A, Wrap up

 Introductions and Roles Bruce Paquin, Sr. ™ Inventor of the MISES™ SCIF Product Line, Security-cleared Project Manager, Security SME, SCIF Accreditation SME, SCIF Design SME Bruce Paquin, Jr. Security-cleared First Army Project Manager and Communications Subject Matter Expert (SME) Mike Adams Structural/Building SME Jim Thomason Communications/Security Systems/Wiring SME Anne Cross Documentation and Contract Administration for Camp Atterbury and Camp Shelby Jennifer Stoll (GSA) Contract Administration for Ft. Bliss and Ft. Hood Lauren Amunrud Purchasing and Administration Jaye Andone Project Coordinator

 Company SCIF Solutions ®, Inc SCIF Solutions ®, Inc  Service-Disabled Veteran Owned (SDVOSB)  Patented MISES™ Portable, Mobile and Modular SCIF products and Next Generation SCIFs design  (National) Security Consulting Services  Security-cleared SCIF experts manage every project, from start to finish In partnership with: In partnership with: Chenega Integrated Systems, LLC  Alaskan Indian Owned/ 8a  MISES™ SCIF GSA Partner  MISES™ Component manufacturing  ISO 9001 Certified

 MISES™ Products  Retrofit SCIF  Container SCIF  Communications Trailer SCIF  Office Module SCIF  Vehicle & Mobile Command SCIFs

 Benefits  Proven fabrication in controlled environment  Delivered / installed Turnkey- including IDS, NIPRNet, SIPRNet, JWICS, NSANet—anything your mission requires  Reduces or eliminates site congestion, duration onsite, construction disruption, SCIF completion time  Mitigates potential mission impacts / risks  Accreditation Guarantee  Warranty and Helpline support  Portability / Mobility-easily deployed  Protects investment-relocate as required

 Process  SCIF experts customize MISES™ SCIF to fit mission requirements  SCIF units are manufactured to order and tested before leaving our facility  SCIF units ready for deployment delivered/ installed  Training and orientation conducted onsite for your new Turnkey SCIF

 Turnkey Examples:

 Specifications and SCIF Accreditation  Patented panelized system includes alternating layers of rigid polymer, aluminum sheeting, copper and steel sheeting, acoustical board, and expanded metal sealed within an aluminum framework  Developed and designed to meet all requirements in accordance with DCID 6/9 and Intelligence Community Policy Guidance, ICPG 705.1/ ICPG 705.2, and designed to be fully accreditable by CIA, DIA, DOD, FBI, NSA, DOE, FEMA and all other Government agencies.

 MISES™ Components

 Patented MISES™ Panel

 Patented MISES™ Door

 Patented Panel Assembly

 MISES™ Communications Trailer SCIF  Free-standing portable SCIF building  Custom built from the ground up—all metal construction, non-combustible fire rating  Units delivered on their wheels—can be set up on permanent, semi-permanent, or blocking system  Use outside or inside hangar or warehouse, tow to sites as needed

  MISES™ (Mobile Intelligence Secure Enclosed System) Panels  Construction to meet DCID 6/9 and ICPG standards  SCIF Entry Door with CD X09 lock, Trilogy 4100 day lock  Security-Cleared Project Manager MISES™ Communication Trailer SCIF SCIF Accreditation Features

 Floor Plans & Furnishings Camp Atterbury and Camp Shelby: 58’x14’ Camp Atterbury and Camp Shelby: 58’x14’ Ft. Bliss and Ft. Hood: 32’x14’ Ft. Bliss and Ft. Hood: 32’x14’

 Building Structure  General Construction  Type IIB - Non -combustible construction  Steel clear span - no support columns  Welded heavy gauge steel bar joists  16 ga galvanized B -deck steel subfloor  16 ga x 4” steel wall 16” o.c. w/ intermediate strapping support, screwed to bottom/top track  Outside Sheathing: 5/8” Densglass exterior rated gypsum  Steel hi-rib siding with flashing detail  Exterior siding, interior walls painted and industrial grade carpet, metal stairs at entrance and exit  Electrical, Lighting and HVAC  400 AMP service (2 ea 200 AMP panels) to receive commercial power, 110v quad outlets and ceiling lights  Commercial pkg wall mount HVAC system with radiant heat

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 MISES™ Communication Trailer SCIF SCIF Accreditation Features

 Electrical 58’x14’:

 Electrical 32’x14’:

 Building Foundation 58’x14’:

 Building Foundation 32’x14’:

 Communications  Overview  20 or 30 Workstation access points, each with 1 ea NIPRNet, SIPRNet, JWICS, NSAnet and LAN (5 different networks)  2 printer/2 fax/4 phone lines  Network patch panel on the outside of the unit with fiber connectivity to 5 servers on two racks (provided by First Army), and phone patch panel on the outside of the unit with connectivity to phone system (provided by First Army)  From the server routers/switchers (provided by First Army), the data networks will be run to each workstation access point using copper/CAT6 cable  Pre-wiring for other systems is included, to connect GFE at a future date (such as ACS or CCTV)

 Communications Typical half wall design:

 Intrusion Detection System Intrusion Detection System  Overview  UL 2050 Intrusion Detection System, Honeywell- compatible installed turnkey  Includes door BMS, motion detectors, keypads, panel, PC and software, commissioning and training  Will require self (base) monitoring, or Honeywell can provide monitoring services at rate TBD

 Walkthrough Preview  Stop 1: Manufacturing Facility  See where and how the unit shells are built  Hood (Unit 90% Complete)  Bliss (Unit 70% Complete)  Shelby (Unit 50% Complete)  Stop 2: Staging/Finish Lot  See where and how the units are finished and tested before shipment  Atterbury (SCIF Panel, Finish work, and Wiring in process)

 Q&A

 Afternoon Break Q&A Wrap UP

 SCIF Solutions ®, Inc. Thank You! POCs: NameProject RoleOffice PhoneCell Phone Bruce Paquin, Sr. ™ Inventor of the MISES™ SCIF Product Line, Security-cleared Project Manager, Security SME, SCIF Accreditation SME, SCIF Design SME (904) Bruce Paquin, Jr. Security-cleared First Army Project Manager and Communications Subject Matter Expert (SME) (904) (618) Mike AdamsStructural/Building SME(904) (407) Jim ThomasonCommunications/Security Systems/Wiring SME (904) (407) Anne Cross Documentation and Contract Administration for Camp Atterbury and Camp Shelby (386) (904) (407) Jennifer Stoll(GSA) Contract Administration for Ft. Bliss and Ft. Hood (904) (904) Lauren AmunrudPurchasing and Administration(904) (904) Jaye AndoneProject Coordinator(904)