2014 Workshop on Spacecraft Flight Software 1 Pasadena, CA, December 16-18, 2014 ICON End-To-End Operations Philosophy Will Marchant, Manfred Bester, Carl.

Slides:



Advertisements
Similar presentations
During spacecraft-level environmental testing, after all instruments were integrated, the government assembled a data clerk team to support test data collection.
Advertisements

Abstract Real-time images of Earths space environment from NASAs IMAGE satellite will soon be available on the NOAA Space Environment Center Web site.
Advanced Multimission Operations System (AMMOS)
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
Michael Lampton Overview of Space Sciences Laboratory 16 July 2003.
GLAST LAT Project ISOC 5/17/2004 – Seth Digel1 ISOC Lessons Learned RFA09 Issue –No writeup on lessons learned from visits to other instrument/mission.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
Online Analysis for STEREO's IMPACT Investigation: Lessons Learned P. Schroeder, J.G. Luhmann, W. Marchant and V. Toy (University of California – Berkeley),
16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 Laser Ranging (LR)-Lunar Reconnaissance Orbiter (LRO) Data Flow and Scheduling.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
Mission Operations in Small Satellite Projects Making Mission Operations Effective J. Burkert Colorado Space Grant Consortium.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
G O D D A R D S P A C E F L I G H T C E N T E R 1 The Trade Between CCSDS and HDLC Framing on Global Precipitation Measurement David Everett and Jonathan.
Flight-like Flight Software Testing Methods Celina A Garcia Jet Propulsion Laboratory California Institute of Technology ©2009 California Institute of.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Aerospace Testing 2006 A Centralized Approach To Ground Support Software To Reduce Technical Risk and Overall Mission Costs Thomas Hauck GSE Software,
Indian Ocean METOC Imager (IOMI) Operational Concept Demonstrates Military Operational Utility and Enables Improved Global Weather Prediction Data to Naval.
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
June 2004 SIW-4 - IP in Space Implementation Guide 1 Handbook for Using IP Protocols for Space Missions James Rash - NASA/GSFC Keith Hogie, Ed Criscuolo,
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
CHIPSat Cosmic Hot Interstellar Plasma Spectrometer Spacecraft Julius-Maximilians-Universität Würzburg S: Telematik in der Raumfahrt Prof. Dr. Schilling.
THEMIS FDMO Review Management Topics − 1 October 5, 2004 Management Topics Manfred Bester.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
Supernova/Acceleration Probe (SNAP) Mission/Science Operations Irene Bibyk Tim Rykowski Bob Schweiss June 28, 2001.
THEMIS FDMO Review Pre-Launch Preparations Update − 1 October 5, 2004 Pre-Launch Preparations Update Mark Lewis.
Solar B Mission Operations Working Group - 3 February Page 1 SS Instrument Operations for TIMED, Cluster, & Stereo C. P. Holmes Sun-Earth Connection.
THEMIS FDMO CDR Peer Review − FOT Activities 1June 1-2, 2004 FOT Activities Mark Lewis.
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
Telemetry Processing and Archiving − 1 Telemetry Flows, Processing and Archiving.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
NASA and Amateur Radio Space Communication Will Marchant, UC Berkeley And
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
Test Executive Trades (1)
cFS Workshop Ground Systems & Kits
Simulink Interface Layer (SIL)
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
I&T&C Organization Chart
Integrating CCSDS Electronic Data Sheets into Flight Software
Study of Tools for Command and Telemetry Dictionaries
GLAST Large Area Telescope:
Ground Segment for WSO/UV
SDO Flight Dynamics Subsystem
GLAST Large Area Telescope
Technology for a NASA Space-based Science Operations Grid Internet2 Members Meeting Advanced Applications Track Session April, 2003 Robert N. Bradford.
NASA Satellite Laser Ranging Moblas 4 Monument Peak, CA LRO and HPWREN Scott Wetzel NASA Satellite Laser Ranging Program Near Earth Networks Programs.
Mark Suder
Integration and Test Organization Chart
Integration & Test Instrument Operations Coordination
Presentation transcript:

2014 Workshop on Spacecraft Flight Software 1 Pasadena, CA, December 16-18, 2014 ICON End-To-End Operations Philosophy Will Marchant, Manfred Bester, Carl Dobson, Scott England, Stewart Harris, Mark Lewis, Will Rachelson, Bryce Roberts, Irene Rosen, and Ellen Taylor Space Sciences Laboratory University of California, Berkeley Space Sciences Laboratory

2014 Workshop on Spacecraft Flight Software 2 Pasadena, CA, December 16-18, 2014 FAST RHESSI CHIPS UCB/SSL operated 10 NASA Explorer spacecraft over a period of more than 20 years (7 are currently operational). EUVE THEMIS / ARTEMIS NuSTAR Mission Operations CenterBGS 11-m ICON ICON, the 11 th spacecraft, is scheduled for launch in Operations History at UCB/SSL

2014 Workshop on Spacecraft Flight Software 3 Pasadena, CA, December 16-18, 2014 Multi-mission Operations Center Berkeley Ground Station 11-m S-band antenna and equipment racks Operations Facilities at UCB/SSL

2014 Workshop on Spacecraft Flight Software 4 Pasadena, CA, December 16-18, 2014 S/C FUV MIGHTI EUV IVM ICON Mission Implementation

2014 Workshop on Spacecraft Flight Software 5 Pasadena, CA, December 16-18, 2014 Photo Courtesy of Orbital Sciences Corporation

2014 Workshop on Spacecraft Flight Software 6 Pasadena, CA, December 16-18, 2014 Measure altitude profiles of airglow near the Earth limb at visible and UV wavelengths via remote sensing, and measure in-situ ion densities and flows near the local magnetic field line to determine the connection between terrestrial weather and space weather. 300 km 200 km 100 km ICON Mission Science Objectives

2014 Workshop on Spacecraft Flight Software 7 Pasadena, CA, December 16-18, 2014 Project Management Systems Engineering S&MA UV Instruments Payload Electronics Mission/Science Ops MIGHTI Neutral Wind Interferometer (2) Ion Velocity Meter (2) LEOStar-2 Spacecraft Observatory I&T Naval Research Laboratory UT-Dallas GSFC – Explorers Office KSC – LV Services UC Berkeley Orbital Sciences Corporation NASA Payload Structure Centre Spatial de Liège FUV Calibration Space Dynamics Lab Instrument Support Cameras/electronics Payload I&T ATK-Magna ICON Participating Institutions and Team Roles

2014 Workshop on Spacecraft Flight Software 8 Pasadena, CA, December 16-18, 2014 ICON Mission Operations System Overview

2014 Workshop on Spacecraft Flight Software 9 Pasadena, CA, December 16-18, 2014  Most internal MOC systems and interfaces required for ICON are operational already within the multi- mission support environment.  All ICON network interfaces are already used with other missions.  New operational flight dynamics tools are added for ICON target processing, and for GPS based orbit determination and attitude maneuver QA.  Science operations planning and pipeline processing software tools are adapted from existing software.  IT Security Plan, physical and network controls are in place already and are regularly audited by the GSFC IONet Security Office. Mission Operations System Architecture Overview

2014 Workshop on Spacecraft Flight Software 10 Pasadena, CA, December 16-18, 2014 Instrument Simulator Spacecraft Simulator ITOS Observatory CMD & CTRL Instrument Spacecraft Simulator SpacecraftInstrument TLM Source Packet Archive MySQL DB Ground Station Orbiting Observatory TLM & CMD Network Routing Standardized interfaces at the CCSDS transfer frame layer allow usage of operational software from the earliest stages. Mission Development Phases Disk Storage Using Common Flight-like Interfaces

2014 Workshop on Spacecraft Flight Software 11 Pasadena, CA, December 16-18, 2014  Ground Systems & Operations  Test-like-you-fly philosophy, follows NuSTAR model used at UCB  Box level to integrated systems level for all operations functions  Early interface and data format verification via simulators  End-to-end network data flows and pass simulations  Science data flows from instrument to bus to ground and SOC pipeline Strive for Realistic Testing  I&T Support  Portable MOC and BGS ground systems used as EGSE throughout I&T  UCB flight controllers participate as console operators in all I&T phases

2014 Workshop on Spacecraft Flight Software 12 Pasadena, CA, December 16-18, 2014  Taking advantage of fully integrated ground system to support spacecraft bus and instrument development  Participating in all phases from early flight software and hardware development to full-up observatory testing  Applying lessons learned: get involved early Taking the MOC to the ICON Spacecraft MOC Supports Development, Integration & Testing

2014 Workshop on Spacecraft Flight Software 13 Pasadena, CA, December 16-18, 2014  EM development feeds simulator delivery  Software emulator: ICP-CE, software based emulator for IVM  Payload emulator: also hosting FSW, with simulated instrument data  Hardware simulators: EM1, EM2, EM3 (hosting FSW) Instrument Simulators and EM Development

2014 Workshop on Spacecraft Flight Software 14 Pasadena, CA, December 16-18, 2014  Converting legacy databases, scripts and telemetry pages to ITOS  ITOS supported NuSTAR & ICON flight software development at Orbital  ITOS will also be used for instrument development and testing  Key strategy is to use standard CCSDS frames early in the development phase with small simulators serving as temporary stand-ins for not yet existing flight systems and software  Configuration management via Git  Data flows between FlatSat and MOC operational ITOS Configuration and Testing

2014 Workshop on Spacecraft Flight Software 15 Pasadena, CA, December 16-18, 2014  Use integrated MOC software (ITOS, FrameRouter, BTAPS) during earliest stages of I&T  Provide simple instrument simulators and interface modules to allow CCSDS transfer frame level interfacing to ITOS very early on  Steep ramp-up to get close to flight-like environment  Don’t be afraid of developing software in-house, but know where the limitations are of what makes sense  Integrate configuration management for all hardware and software solutions  Try to have FlatSat available with interfaces to the MOC Results & Lessons Learned

2014 Workshop on Spacecraft Flight Software 16 Pasadena, CA, December 16-18, 2014  Successfully applied lessons learned from previous missions  Naturally, project and spacecraft contractor were skeptical about UCB proposal to deliver turn-key command and control system with hardware and software for I&T, but concerns were dispersed relatively quickly  Operations team involvement beginning with ITOS configuration 2.5 years before launch provides excellent training in preparation for on-orbit operations  Sizeable effort early on for operations team, but transition to on-orbit operations are very easy and low risk Summary

2014 Workshop on Spacecraft Flight Software 17 Pasadena, CA, December 16-18, 2014 Backup Slides

2014 Workshop on Spacecraft Flight Software 18 Pasadena, CA, December 16-18, 2014  The U.C. Berkeley Space Sciences Laboratory (SSL) Multi-mission Operations Center (MOC) provides support for Caltech's NuSTAR mission and will operate the ICON mission (scheduled for launch in 2017.)  The MOC uses the Integrated Test and Operations System (ITOS) developed by NASA's GSFC and commercialized by The Hammers Company.  The MOC supplied ITOS workstations and support for the NuSTAR instrument and spacecraft development efforts. This led to very smooth observatory integration, launch operations, and on orbit operations.  ICON is following in those footsteps with some enhancements from lessons learned on the NuSTAR program.  This talk will provide a brief overview of the suite of operations tools and discuss the advantages, and disadvantages, of using them for early flight software development and for integration and test activities. Abstract