Difficult Areas For Burnthrough Implementation Difficult Areas For Burnthrough Implementation.

Slides:



Advertisements
Similar presentations
ATR Combi & Freighter  Exit.
Advertisements

Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Uncontrolled copy not subject to amendment
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Access BDD Survey School
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Heavy Concrete Construction Formwork
Lesson 4 Shell Plating and Framing.
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
E8, , Wing Damage.
Firestone Building Products EPDM Training. Membrane Attachment.
The C-141 StarLifter Some assembly required. This is some of the tooling used to manufacture the C-141. These were used to shape the sides of the fuselage.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
NTSB review of crew actions during in-flight fires has resulted in a series of recommendations calling for improved crew training and modification of cabin.
Familiarization with N767A
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
The Development of Specialized Skills Ship-Handling & Navigation Operation of Deck Equipment, ie. Anchors, Knot Tying, Line Handling Dealing with Emergencies,
Three Lines of Defense Presented by the Arapahoe County Sheriff’s Office.
Chapter 27 Insulating Structures. Objectives After reading the chapter and reviewing the materials presented the students will be able to: List the ways.
SHED CONSTRUCTION A Visual Guide. C.A.D. Example.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
International Aircraft Materials and Fire Test Working Group Contamination/Aging Task Group Contamination Daniel Slaton Boeing Commercial Airplanes Material.
International Aircraft Materials Fire Test Working Group Meeting
Energy Performance and Moisture Control of Ceilings and Roofs 1.
Before Opening a Door to the Corridor or Stairway Can you see or smell Smoke? > Created by Joe Glogowski.
Framing Systems Double Bottom Construction Stem & Stern Construction
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Residential Construction Mr. Todzia
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Wood Construction CTC-375.
Moment Connection Requires Bolts Outside the Flanges
Cladding attachment.
Engineering Analysis of NFPA 285 Tested Assemblies
Optional LED or Strobe Light BarStrobe Grill Lights Optional LED or Strobe Grill Lights Full Seat Recline Comfortable for 6’4” personnel Large, Easy to.
Original ATE drum brakes shoes & TopKits
1 Alwest Seating & Sleeping Accommodations Most Alcan/Alwest boats, at this point in their lives, have undergone some level of interior renovation.
Lecture 2: Ship structural components
HULL FRAMING SYSTEMS GROUP B : SUNDEEP KULHARI PRASHANT KRISHNAN
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
INSTALLATION DETAILS. Installation Details for Code Compliance Must be installed per manufacturer’s instructions Architects can provide construction details.
A-Frame Operation The A-Frame will provide support for odd shaped loads, loads where you are unable to get directly below the load, and for stabilizing.
AC X Thermal/Acoustic Insulation Flame Propagation Test Method Details.
The Unique Scaffold Trailer Pack From Molecular Scaffold Sales.
Certificate number: FS453/02 Application FS21 Firestop Panel is used to firestop mechanical and electrical services where they pass through fire rated.
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 7 OF 10 Layout & Panel Installation SPONSORED BY:
DSLAM Configuration in a Cabinet Heat and Noise testing December 2008.
Project Document Number GTMP-5076 L-1011oem Wing Upgrades W. M. Langford Advanced Models Systems & Sensors Branch 22 June 2004 (a.k.a. L-1011_mod1) Generic.
Types of Door Closers. A door closer is a device that is fixed onto a door, to automatically close the door when it is opened.
AEROFIX STRUCTURAL SERVICES
Custom Systems for Ladder and Job Site Safety
Basic Aircraft Structure
STEP 1: ASSEMBLE ANGLE PLATES
Teknologi Dan Rekayasa
Filter Istallation in Cineblaster
Teknik Dasar Perkapalan
Ship Construction Framing Systems Double Bottom Construction Stem & Stern Construction.
ARISSat-1 Solar Panel Covers
A F Cargo Loading System
STEP 1: ASSEMBLE ANGLE PLATES
Alwest Holding Tank Relocation
Basic Aircraft Structure
Dual-Deploy Launch Checklist
Clamping and Boring Tools
AIRCRAFT FIRE REGULATIONS
Updates on the Silicon Tracker 2S Module
Presentation transcript:

Difficult Areas For Burnthrough Implementation Difficult Areas For Burnthrough Implementation

2 Objective Include methods of compliance in the AC for all configurations in airplanes. Include methods of compliance in the AC for all configurations in airplanes. –Same safety standard worldwide –Same safety standard from all airframe manufacturers –Address certification issues early on

3 Testing Issues Testing Issues Unique Configurations Unique Configurations Summary Summary Overview

4 Testing Issues The Advisory Circular gives detailed instructions for testing burnthrough designs when blankets are installed between and over frames. Depending on the airplane 20% to 80% of insulation cannot match configurations currently in the AC. The Advisory Circular gives detailed instructions for testing burnthrough designs when blankets are installed between and over frames. Depending on the airplane 20% to 80% of insulation cannot match configurations currently in the AC. Minimal direction is given for unique configurations that cannot be attached as stated in the AC currently. Minimal direction is given for unique configurations that cannot be attached as stated in the AC currently. Many configurations do not fit the test apparatus. Many configurations do not fit the test apparatus.

5 Unique Configurations There is not an identified method to certify unique designs to the flame penetration test There is not an identified method to certify unique designs to the flame penetration test Attachments in some areas are unable to meet burnthrough requirements Attachments in some areas are unable to meet burnthrough requirements Examples Examples –Upper cheek – Main deck floor beam and frame intersection –Main Deck Entry Doors and Hatches –Blankets Surrounding Main Deck Entry Doors –Lower Lobe Cargo Doors –AOE doors and linings –Airstair door –Aft Pressure Bulkhead –Nose Bulkhead –Cargo Bulkhead –Nose wheel well bulkhead/Bilge –Over-frame support beams –Sloping sidewalls –Bilge –EE Bay Hatch and walkway

6 Unique Configurations Upper cheek – Main deck floor beam and frame intersection Upper cheek – Main deck floor beam and frame intersection Situation: Situation: –Not able to clamp over frames due to floor beams –No other attachment method known that meets rule –No method for testing

7 Unique Configurations Main Deck Entry Doors and Hatches Main Deck Entry Doors and Hatches Situation: Situation: –Contain blankets that are installed into pockets, retained with bond-on pins or hook and loop –No overlap possible – must maintain door functionality. –Cannot add holes for screw though pins Allow burnthrough materials with best design solution – no testing required Allow burnthrough materials with best design solution – no testing required

8 Unique Configurations Blankets Surrounding Main Deck Entry Doors Blankets Surrounding Main Deck Entry Doors Situation: Situation: –Unique structure around doorways does not allow for use of screw-through pins or clamps –Blankets are attached to structure with hook and loop –Overlap of blankets is not possible – must maintain door functionality.

9 Unique Configurations Lower Lobe Cargo Door Lower Lobe Cargo Door Situation: Situation: –Foam is attached to outboard side of cargo liner with adhesive. –Insulation attached to door with hook & loop –No method for testing

10 Unique Configurations Automatic Over-wing Exit (AOE) doors and linings Automatic Over-wing Exit (AOE) doors and linings Situation: Situation: –Unique structure around doorways does not allow for use of screw-through pins or clamps –Blankets installed on liner with double back tape.

11 Unique Configurations Airstair Door Airstair Door Situation: Situation: –Unique structure around doorways does not allow for use of screw-through pins or clamps –Foam pad glued to aluminum skin (shown left of door) and is attached to inboard surface of door using velcro.

12 Aft Pressure Bulkhead Aft Pressure Bulkhead Situation: Situation: –No frames to attach to –Stringers will burn away in less than 4 minutes leaving no method of attachment –No method for testing Unique Configurations

13 Unique Configurations Nose Bulkhead Nose Bulkhead Situation: Situation: –Blankets are attached using hook and loop or bond on attachments –Not able to use clamps around perimeter locations

14 Nose Bulkhead Nose Bulkhead Unique Configurations

15 Unique Configurations Cargo Bulkhead Cargo Bulkhead Situation: Situation: –Blankets are attached using hook and loop or bond on attachments –Not able to use clamps around perimeter locations

16 Unique Configurations Nose wheel well bulkhead/Bilge Nose wheel well bulkhead/Bilge Situation: Situation: –Unique structure does not allow for use of screw-through pins or clamps –No testing method known

17 Unique Configurations Over-frame support beams Over-frame support beams Situation: Situation: –Certification is undefined due to slits needed to overlap frame.

18 Sloping sidewall Sloping sidewall Situation: Situation: –Blankets do not overlap frame because of cargo liner attachment Allow cargo liner as part of the burnthrough configuration Allow cargo liner as part of the burnthrough configuration Unique Configurations

19 Unique Configurations Bilge Bilge Situation: Situation: –Blankets do not overlap frame –Airplane geometry requires splice at frame - skin intersection –Bilge frame up to 2’ deep –No method for testing

20 Unique Configurations EE Bay Hatch and walkway EE Bay Hatch and walkway Situation: Situation: –Unique structure around hatches does not allow for use of screw-through pins or clamps –Foam bonded or attached with velcro to interior surface of EE bay hatch and walkway

21 Unique Configurations Nose Wheel Well Nose Wheel Well Situation: Situation: –No method of testing large blankets in test rig –No method of testing box corners –No attachment method known for this geometry

22 Summary Many areas of the airplane have blanket configurations that are not depicted in the proposed scenarios of AC X Many areas of the airplane have blanket configurations that are not depicted in the proposed scenarios of AC X Many airframe designs are not depicted in the proposed AC. Methods of testing these designs and attachments are not well defined. Many airframe designs are not depicted in the proposed AC. Methods of testing these designs and attachments are not well defined. Certification method for areas not depicted in the AC is not well defined. Certification method for areas not depicted in the AC is not well defined.