Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.

Slides:



Advertisements
Similar presentations
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Advertisements

1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
CMPB Alain Blondel 14 April STATUS OF MICE.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
The MICE demonstration of ionization cooling J. Pasternak #, V. Blackmore, C. Hunt, J-B. Lagrange, K. Long, Imperial College, London, UK Alain Blondel,
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
Muon Ionization Cooling Experiment: U.S. Muon Accelerator Program Perspective and Approach Mark Palmer May 7, 2013.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Executive Board Meeting Roy Preece 23rd May 2014
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
(one of the) Request from MPB
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
S TATUS OF THE P HYSICS A NALYSIS V. Blackmore MICE Project Board 29 th April, /30.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
US Construction Project: SSs, PRY, Cavities and test program 1.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Comments on the February DOE Review
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
Completion of the MICE-US construction project
Status of the MICE Construction Project
UK Financial Plan & Risks
MICE CM31 Schedule summary
MICE Project in the US: Completion of Efforts
The Muon Ionization Cooling Experiment: Controls and Monitoring
Presentation transcript:

Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

Ionisation cooling formalism Exponential decrease in normalised emittance: Competition between: –dE/dx [cooling] and MCS [heating] Optimum: –Low Z, large X 0 –Tight focus –H 2 gives best performance December 15, 2014 M. A. Palmer | FNAL All Experimenter's Meeting2

MICE Steps IV & V Plan endorsed by MICE Project Board in April SS1- -Tracker1- -AFC- -FC- -Absorber- -SS2- -Tracker2- MICE Step IV Configuration -SS2- -Tracker2- -SS1- -Tracker1- -AFC1- -FC1- -Absorber1- -RFCC- CCM -AFC2- -Absorber2- -FC2- MICE Step V Configuration December 15, 2014 M. A. Palmer | FNAL All Experimenter's Meeting3 Operational 2015 Operational 2018 Legend: -SS=Spectrometer Solenoid- -FC=Focus Coil- -AFC=Absorber-Focus Coil Module- CCM=Coupling Coil Magnet -RFCC=RF-Coupling Coil Module-

Expedited Muon Cooling Demonstration Plan developed in response to P5 recommendations -SS1- -Tracker1- -AFC- -FC- -Absorber- -SS2- -Tracker2- Legend: -SS=Spectrometer Solenoid- -FC=Focus Coil- -AFC=Absorber-Focus Coil Module- -RFA=RF-Absorber Module- -SS2- -Tracker2- -SS1- -Tracker1- -AFC1- -FC1- -AFC2- Primary -Absorber- -FC2- RFA1- RFA2- Secondary -Absorber2- Secondary -Absorber1- NEW Expedited MICE Cooling Demonstration December 15, 2014 M. A. Palmer | FNAL All Experimenter's Meeting4 Operational 2017 Represents reduced cost and technical risk relative to MICE Step V Operational 2015

September-November 2014 August DOE Review of MAP –Detailed report for the new MICE Cooling Demonstration requested on the 1 month timescale September 25 th –Report to DOE accepted September 29 th –Plan for 3-year MAP Conclusion presented to HEPAP Supports completion of the MICE Demonstration And controlled closeout of other activities November –MICE Project Board Review Expedited MICE Demonstration endorsed by the review committee and the international Funding Agencies Committee December 15, 2014 M. A. Palmer | FNAL All Experimenter's Meeting5

MICE-US Construction Project Scope Step IV –Spectrometer Solenoids (2) – Delivered to RAL –LiH Absorber – Delivered RAL –Partial Return Yoke - In Fabrication –Installation and Commissioning Spectrometer Solenoids Fiber Trackers PRY Cooling Demonstration –RF Test and Characterization Program in MTA –2 Single-Cavity RF Modules NO RFCC MODULE –Final Step PRY –Installation and Commissioning Reconfigured Step IV Hardware RF Systems Extended PRY December 15, 2014 M. A. Palmer | FNAL All Experimenter's Meeting6

MICE Hall: Being readied for PRY Installation PRY: –Preparation for installation of bases and restraints on track: Expect to be installing first set of “uprights” starting January 2015 Emphasis now shifting to commissioning and operations … 7 December 15, 2014 M. A. Palmer | FNAL All Experimenter's Meeting

Step IV Wrapped with Partial Return Yoke (PRY) December 15, 2014 M. A. Palmer | FNAL All Experimenter's Meeting8

MICE Steps 9 Step IV: Study of material, lattice, momentum and emittance to start Q2 CY2015 Ionization cooling demonstration: –RF Components under test in the MTA and at Daresbury Lab –Expect that all necessary hardware will be deployed by Spring 2017 –Full demonstration with RF commences by Summer 2017 December 15, 2014 M. A. Palmer | FNAL All Experimenter's Meeting

Cooling demonstration performance 10 Cooling Transmission December 15, 2014 M. A. Palmer | FNAL All Experimenter's Meeting Starting Summer 2017

THANK YOU FOR YOUR TIME December 15, 2014 M. A. Palmer | FNAL All Experimenter's Meeting11