ISST Review and Update Science and Technology Committee Meeting 3 February 2004.

Slides:



Advertisements
Similar presentations
Workshop on Use of NWP in Support of Nowcasting Initiated by Tom Keenan Proposal by Jenny Sun, Jeanette Onclee, and Tom Keenan Organizing committee: Jeanette.
Advertisements

“A LPB demonstration project” Celeste Saulo CIMA and Dept. of Atmos. and Ocean Sciences University of Buenos Aires Argentina Christopher Cunningham Center.
Panel Discussion on Corporate Volunteerism Closing Plenary, June 25, 2003 Nick Keener, CCM Director, Meteorology 2009 Summer AMS Community Meeting Aug.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
ISST Review and Update WR SOO/DOH Conference Call 19 February 2004 (Material extracted from a Briefing of the Science and Technology Committee on February.
Meeting Expectations Gary Jedlovec Purpose of review SPoRT Mission and Vision Role of Science Advisory Committee Charge to Committee members transitioning.
MOS Developed by and Run at the NWS Meteorological Development Lab (MDL) Full range of products available at:
The NCEP operational Climate Forecast System : configuration, products, and plan for the future Hua-Lu Pan Environmental Modeling Center NCEP.
Hydrometeorological Prediction Center HPC Medium Range Grid Improvements Mike Schichtel, Chris Bailey, Keith Brill, and David Novak.
Transitioning unique NASA data and research technologies to the NWS 1 Evaluation of WRF Using High-Resolution Soil Initial Conditions from the NASA Land.
FORECASTING EASTERN US WINTER STORMS Are We Getting Better and Why? Jeff S. Waldstreicher NOAA/NWS Eastern Region Scientific Services Division – Bohemia,
MOS Performance MOS significantly improves on the skill of model output. National Weather Service verification statistics have shown a narrowing gap between.
Exploitation of Ensemble Output (and other operationally cool stuff) at NCEP HPC Peter C. Manousos NCEP HPC Science & Operations Officer
1 Localized Aviation Model Output Statistics Program (LAMP): Improvements to convective forecasts in response to user feedback Judy E. Ghirardelli National.
An Instrumented Coastal Process Modeling Test Bed US Army Corps of Engineers BUILDING STRONG ® Jeff Hanson U. S. Army Engineer Research and Development.
Climate Prediction Applications Science Workshop Des Moines, IA – March 3, 2011 Andy Wood NWS Colorado Basin River Forecast Center Also: John Schaake,
NWS Digital Services 1 Digital Services Update and Forecast Collaboration March 16, 2004 Shannon White Training Division.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Earth Science Division National Aeronautics and Space Administration 18 January 2007 Paper 5A.4: Slide 1 American Meteorological Society 21 st Conference.
NOAA’s National Weather Service National Digital Forecast Database: Status Update LeRoy Spayd Chief, Meteorological Services Division Unidata Policy Committee.
Woody Roberts Tom LeFebvre Kevin Manross Paul Schultz Evan Polster Xiangbao Jing ESRL/Global Systems Division Application of RUA/RTMA to AWIPS and the.
Kim J. Runk June 4, 2014 Satellite Proving Ground User Readiness Meeting.
VERIFICATION OF NDFD GRIDDED FORECASTS IN THE WESTERN UNITED STATES John Horel 1, David Myrick 1, Bradley Colman 2, Mark Jackson 3 1 NOAA Cooperative Institute.
By John Metz Warning Coordination Meteorologist WFO Corpus Christi.
Forecasting process, issues and the public Joe Koval Senior Software Developer The Weather Channel, Atlanta, GA.
1 Precipitation verification Precipitation verification is still in a testing stage due to the lack of station observation data in some regions
Analysis of Record Andy Devanas Jeff Medlin Charlie Paxton Pablo Santos Dave Sharp Irv Watson Pat Welsh Suggestions and Concerns from the Florida Science.
NWS Partners Meeting NWS Roadmap Science & Technology NWS Roadmap Science & Technology Brad Colman Marie Lovern Brad Colman Marie Lovern June 29, 2011.
GLFE Status Meeting April 11-12, Presentation topics Deployment status Data quality control Data distribution NCEP meeting AirDat display work Icing.
HIC Meeting July 30, NWS Climate Services Division and NWS Hydrologists in the Field Summer Hydrologist-in-Charge Meeting July 30, 2008 Ahsha Tribble,
The First Step: Translating Needs to Requirements Many applications require the current and past states of the atmosphere near the surface at high spatial.
OUTLINE Current state of Ensemble MOS
1 Agenda Topic: National Blend Presented By: Kathryn Gilbert (NWS/NCEP) Team Leads: Dave Myrick, David Ruth (NWS/OSTI/MDL), Dave Novak (NCEP/WPC), Jeff.
Proving Ground Activities with Aviation Weather Center, Storm Prediction Center and NASA SPoRT GLM Science Meeting Huntsville, Alabama 20 September 2012.
AWIPS II Update Unidata Policy Committee Meeting J.C. Duh Chief, Program & Plans Division, Office of Science & Technology, NWS April 15, 2010.
MDL Lightning-Based Products Kathryn Hughes NOAA/NWS/OST December 3, 2003
Hydrometeorological Prediction Center HPC Experimental PQPF: Method, Products, and Preliminary Verification 1 David Novak HPC Science and Operations Officer.
Model Post Processing. Model Output Can Usually Be Improved with Post Processing Can remove systematic bias Can produce probabilistic information from.
Part II  Access to Surface Weather Conditions:  MesoWest & ROMAN  Surface Data Assimilation:  ADAS.
CARPE DIEM 6 th meeting – Helsinki Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches.
Transitioning unique NASA data and research technologies to the NWS 1 Evaluation of WRF Using High-Resolution Soil Initial Conditions from the NASA Land.
1 11/25/2015 Developmental Testbed Center (DTC) Bob Gall June 2004.
Tom LeFebvre GSD/ESRL 20 November What is FDSE? The NWS Weather Ready Nation Roadmap outlines concepts for the future of forecasting in the NWS.
Science and Technology Infusion Plan For National Digital Forecast Database Science and Technology Infusion Plan For National Digital Forecast Database.
APPLICATION OF NUMERICAL MODELS IN THE FORECAST PROCESS - FROM NATIONAL CENTERS TO THE LOCAL WFO David W. Reynolds National Weather Service WFO San Francisco.
NFUSE Conference Call 4/11/07 How Good Does a Forecast Really Need To Be? David Myrick Western Region Headquarters Scientific Services Division.
Eric Christensen National Hurricane Center Gridded Marine Forecasts Status as of Oct 2009.
Digital Aviation Services Paving the way for aviation forecasts of the future Cammye Sims Cammye Sims.
Climate Services: The Pacific Climate Information System (PaCIS) Approach Eileen L. Shea NOAA IDEA Center 31 st Climate Diagnostics.
NWS Performance Management System DRAFT PLAN FY06 Q2.
1 Probabilistic Forecast Verification Allen Bradley IIHR Hydroscience & Engineering The University of Iowa RFC Verification Workshop 16 August 2007 Salt.
1 OCWWS -- CLIMATE SERVICES DIVISION Climate Services Partnerships Eastern Region Climate Services Workshop Raleigh, North Carolina Judy Koepsell September.
IFPS Science Steering Team IFPS Methodology Workshop March 2004
NWS Digital Services 1 CB Operations Committee Lynn Maximuk DSPO Operations Team Eastern Region HPC Day 4-7 Grid Proposal Review, Findings and Recommendations.
CFI GROUP WORLDWIDE ANN ARBOR ATLANTA BUENOS AIRES KUALA LUMPUR LONDON MADRID MELBOURNE MILAN PARIS PORTO ALEGRE SEOUL SHANGHAI STOCKHOLM National Weather.
IFPS Science Steering Team (ISST) and other related activities Andy Patrick NOAA/National Weather Service Corpus Christi, TX IFPS Methodology Workshop.
IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee -- S&T Committee VTC 28 May 2003.
Riding the IFPS/GFE into the Future of Forecasting Lynn Maximuk MIC WFO Pleasant Hill, MO.
GFE in RFCs Tom LeFebvre ESRL/Global Systems Division.
Aviation Products from the Localized Aviation MOS Program (LAMP) Judy E. Ghirardelli National Weather Service Meteorological Development Laboratory Presented.
NOAA Northeast Regional Climate Center Dr. Lee Tryhorn NOAA Climate Literacy Workshop April 2010 NOAA Northeast Regional Climate.
Chapter 6 Assessing Science Learning Updated Spring 2012 – D. Fulton.
1 National Weather Service AWIPS Software Recommendation and Evaluation Committee (SREC) Status Meeting May 1, 2006 Systems Engineering Center.
Translating Advances in Numerical Weather Prediction into Official NWS Forecasts David P. Ruth Meteorological Development Laboratory Symposium on the 50.
NASA,CGMS-44 June 2016 Coordination Group for Meteorological Satellites - CGMS UN COPUOS: Report on Meeting of the Space Weather Expert Group Presented.
ITSM Governance is Imperative to Succeed
NERC Reliability Standards Development Plan
NERC Reliability Standards Development Plan
Bridging the ITSM Information Gap
Presentation transcript:

ISST Review and Update Science and Technology Committee Meeting 3 February 2004

2 Outline Review accomplishments and activities Eta extension Updated roadmap Analysis of Record FSL Resources for GFE Development

3 Accomplishments and Activities Identified an opportunity to fill "transmission gaps" on the SBN and developed a proposal now nearly implemented –Eta surface and BL fields Working with MDL on their efforts to develop COOP MOS (now in GFE) and gridded MOS –Number of MOS sites increased by an order of magnitude Provided scientific critique and feedback into the directive process and NVIWT verification plan design Recently met w/ Digital Services CONOPS team Investigated and prioritized a spectrum of downscaling possibilities and reported to S&T Committee Conceived, developed, and championed the Eta extension

4 8-day Eta Extension Background: –Designed to bring quick relief to forecasters by giving physically consistent and seamless option for high resolution medium range grids –Has received broad support from Regions Status and timeline: –Tasking complete –Change Notification in process (consolidation of Eta run) –Test grids available to setup optimal baseline SMARTINIT –March: 30-day testing and evaluation period Forecasters at a subset of WFOs to assess impact on operations Better evaluation of internal drift issues (limited set of fields available via a webpage) Test Regional WAN distribution method HPC will perform model diagnostics

5 8-day Eta Extension (continued) Mid April: convergence of Eta runs complete and Eta extension running operationally –GRIB1 Regional distribution continues Late May: DVB-S efforts free up SBN bandwidth June: OB3.2 upgrade to AWIPS configuration June: Eta extension operational via SBN using GRIB2

6 Updated Roadmap New prioritized list of action topics: –Analysis of Record –Digital Services forecast process –Climatology –Downscaling (long-term solutions) –Review of (preliminary review to OCWWS by late March) –Uncertainty and probabilistic information Short term actions (next 2-3 months) –Verification (prioritize tasks in NVIWT Verification Plan) –Input to (declaring elements official)

7 Activities with Ongoing Monitoring Grid change management GFE enhancements SBN data GFS bottleneck on mainframe TCM (Tropical Cyclone Message) Gridded MOS

8 Analysis of Record (A real-time, mesoscale analysis of all forecast grids) Lots of ideas and discussion, but effort must be organized quickly Grid spacing must match highest-resolution forecasts Will have to mature from early prototype 2-d analysis of primary fields Impact of model used for first guess must be accounted for and minimized Observation system must be supported Some groups already designing systems to include analysis of record and associated analysis techniques

9 Analysis of Record (continued) This may prove to be the Holy Grail of the digital era Unfortunately, it is an integral part of: –The forecast process –Verification –Customer motivation and acceptance –Conditional climatologies –Statistical applications and bias corrections –Numerical weather prediction

10 Analysis of Record (continued) Seeking a solution –Charter a team to create an “Analysis of Record” Roadmap Diverse team of experts (both within and outside NWS) Seek assistance from research community –USWRP –CSTAR –COMET projects Plan should thoroughly examine existing analysis systems for possible inclusion or modification –Inventory and coordinate Regional efforts already underway Work in coordination with MDL and NCEP

11 FSL Resources for GFE Development FSL role still critical to attaining field functionality IFPS focal point position paper last fall Tentative agreement to fund another FTE Effort de-railed Especially with VTEC emphasis, resources not available to meet immediate field requirements

12 Closing comments Good progress over past 8 months We endorse Digital Services Program Office Verification is still critical to decision making process and must gain momentum

13 Background Slides

14 COOP MOS The graphics to follow are a GFS MaxT forecast from MatchMOSAll. –The first image is running MatchMOSAll with just standard GFS MOS. –The second image is running MatchMOSAll with standard GFS MOS plus the COOP MOS (there are additional COOP stations used in the analysis that are outside the SLC CWA). –The third image is the difference between the 1 st two images. These graphics are produced using Tim Barker's MatchMOSALL run on the background GFS SmartInit grid in GFE. Tim's tool uses an elevation dependent serpentine fit to whatever points are available to the routine. 25 offices have registered as using getCoopMOS (to download data) and 40 have registered to use MatchMOSALL (to use the data); typically only about half of those that download the software register it Text bulletin derived from GFS COOP MOS GFS-BASED MOS COOP MAX/MIN GUIDANCE 1/27/ UTC Wasatch front WED 28| THU 29| FRI 30 ALPINE UT 28 42| 29 42| BOUNTIFUL-VAL VER UT 28 41| 29 44| DRAPER POINT OF M UT 29 43| 30 49| FAIRFIELD UT 21 42| 22 45| GARFIELD UT 31 44| 32 47| LEVAN UT 22 42| 22 46| NEPHI UT 22 40| 23 44| OGDEN SUGAR FACTO UT 28 41| 28 44| OLMSTEAD P H UT 28 42| 29 46| PLEASANT GROVE UT 28 42| 29 47| PROVO BYU UT 29 42| 30 47| SALT LAKE CITY E UT 28 41| 29 45| SANTAQUIN CHLORIN UT 26 41| 26 45| SPANISH FORK PWR UT 28 41| 28 45| THIOKOL PROPULSIO UT 25 38| 25 42| UTAH LAKE LEHI UT 22 42| 22 44| VERNON UT 21 43| 23 46| Cache Valley WED 28| THU 29| FRI 30 PRESTON ID 23 37| 24 35| LOGAN RADIO KVNU UT 23 39| 26 42| LOGAN UTAH STATE UT 27 40| 26 38| LOGAN 5 SW EXP FA UT 25 39| 26 40| RICHMOND UT 26 38| 29 42| 25 40

15 MatchMOSAll with just standard GFS MOS

16 MatchMOSAll with standard GFS MOS plus the COOP MOS

17 difference between the 1 st two images (MatchMOSAll with standard GFS MOS plus the COOP MOS - MatchMOSAll with just standard GFS MOS)

18 MatchMOSAll with just standard GFS MOS

19 MatchMOSAll with standard GFS MOS plus the COOP MOS