MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.

Slides:



Advertisements
Similar presentations
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Advertisements

Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Remote Handling design progress for the Collimation Upgrade project Keith Kershaw EN-HE 6 June 2011.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Agenda : CLIC Civil Engineering and Services (CES) WG.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
ILC TRANSPORT AND INSTALLATION Questions from last CES: Beam height explanation, Transport implications of sloping access tunnels proposed for access to.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Dec
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Extraction and beamline progress B.Goddard TE/ABT.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Integration of CLIC TBM in CLEX Electronics allocation and cables tracing Wilfrid Farabolini (CEA/IRFU) 16 October 2013.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Handling Discussions LAGUNA-LBNO/Layout Study Group - Friday 19/7/2013 Keith Kershaw EN-HE.
Two-beam module layout
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Linac4-PSB 160 MeV connection readiness review
CLIC Handling Engineering Update
CLIC Civil Engineering Update
IT-4189 Supply and installation of a cryogenic distribution system
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
BA6 – crab cavity activities in EYETS
CLIC Civil Engineering & Infrastructure
Tunnel Cross Section Studies
Module roadmap to end of 2017
Mechanics: (Tim).
List of changes and improvements for the next generation CLIC module
COOLING & VENTILATION INFRASTRUCTURE
CLIC Civil Engineering Update
Undulator System Installation
Extract from today’s talk given to DCB
RDR Baseline Layouts for Interaction Region
Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M
Workshop on fire protection for physics research facilities
Presentation transcript:

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE

Content CDR content Update on the transport strategy 2 CLIC module Working Group Keith Kershaw 27 Sept 2010

CDR content – 6.5Transport and installation – 6.5.1Overview and challenges – 6.5.2Surface and shafts – 6.5.3Underground – 6.5.4Cost Considerations 3 CLIC module Working Group Keith Kershaw 27 Sept 2010

Items to be transported Modules and their supports Magnets Vacuum pipes, Beam dumps Racks Cooling and ventilation equipment Electrical cables and cable trays Others? 4 CLIC module Working Group Keith Kershaw 27 Sept 2010

Module data 5 CLIC module Working Group Keith Kershaw 27 Sept 2010

Concept vehicle 6 CLIC module Working Group Keith Kershaw 27 Sept 2010

Tunnel cross section 7 CLIC module Working Group Keith Kershaw 27 Sept 2010

Shaft cross section 8 CLIC module Working Group Keith Kershaw 27 Sept 2010

UTRC cavern – transport arrangements 9 CLIC module Working Group Keith Kershaw 27 Sept 2010

Magnets 10 CLIC module Working Group Keith Kershaw 27 Sept 2010

Update on module transport strategy A reminder 11 CLIC module Working Group Keith Kershaw 27 Sept 2010

Some Conclusions from Nov 2009 Ensure clear interconnection plane and clearance in order to allow installation and removal of one module between two others Decide if main beam quadrupoles transported and installed separately Consider whole installation sequence covering supports, alignment equipment and interfaces between girders and their supports Module mock ups should be used to test installation issues (this will increase focus on installation problems during design). 12 CLIC module Working Group Keith Kershaw 27 Sept 2010

Module integration Sept CLIC module Working Group Keith Kershaw 27 Sept 2010

Conceptual drawing 14 R. Leuxe CLIC module Working Group Keith Kershaw 27 Sept 2010

Module mock –ups (Nov 2009 slide) 15 CLIC module Working Group Keith Kershaw Install and remove central module with outer modules in position. For example by using overhead crane 27 Sept 2010

Test module – installation plane + sequence? 16 CLIC module Working Group Keith Kershaw 27 Sept 2010

Conclusions (basically as Nov 2009) Ensure clear interconnection plane and clearance Consider how main beam quadrupoles transported and installed Don’t forget lifting points, support points and transport restraints Consider whole installation sequence covering supports, alignment equipment and interfaces between girders and their supports (Full sequence starts with assembly) Test modules should be used to (design for + ) test installation issues e.g. with overhead crane or hoist Installation of other items in tunnel still to be considered. 23 Nov CLIC module Working Group Keith Kershaw