ICRARD 2010 RAPHAEL QUEIROZ Buxton, June 23 rd, 2010. NATIONAL AGENCY OF PETROLEUM, NATURAL GAS AND BIOFUELS.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Distance Education and Active Learning -One Approach to Support Succession Planning Aram Attarian, Ph.D North Carolina State University Department of Parks,
Strategic Corrosion Monitoring in Topside Applications Tom Swihart GE Measurement & Control Solutions.
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
pipeline-solutions Progis PROGIS Software AG Software that Shows ! Geographical Information System System for Pipeline Management PipeGIS.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Canada-Newfoundland and Labrador Offshore Petroleum Board ICRARD 2010 W. Bobby.
KEYNOTE ADDRESS The role of BDEP in the management of information on the Brazilian Sedimentary Basins Sedimentary Basins Magda Chambriard Director Brazilian.
GCAA Management Workshop Paul C. Atkins, 2/18/09 Paul C. Atkins, 2/18/09.
CHAPTER 1. MAINTENANCE “Act of causing to continue ” [New Oxford Dictionary]
Integrated Drilling and Logging Program Approach in HPHT Environment: Successful Drilling of Deepwater Oberan Field, Nigeria, ENI Deepest Well in Deep.
Contractor Management and ISO 14001:2004
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
SEMS 101 SAFETY & ENVIRONMENTAL MANAGEMENT SYSTEM.
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
Implementing Human Service Worker Safety Regulations
PIPELINE ENGINEERING COURSES DISTANCE LEARNING 12 WEEKS DR. ESAM AM AL-MATOUQ.
Total Product Life Cycle An Example. Medcon May 2, Agenda Post Market Surveillance Total Product Life Cycle and Product Design Systematic Collection.
Photo Realistic 3D Cloud of Points
1 Developing and Maintaining Policing at Height Capabilities Jez Hunter MIOSH.
STEAM HEATING.
MCS Business Profile Yr Copyright (C) MCS 2013, All rights reserved. 2 MCS Business Focus MCS Business Profile MCS has a business.
3P Services, Germany Basil Hostage
Petroleum Engineering 406 Floating Drilling
Pipeline Qra Seminar Title slide Title slide.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
EHS Management System Elements
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
Center for Offshore Safety
Forensic Audits of Your QEHS Management System. © 2006 ABS Consulting, Inc.
Occupational Health and Safety
Basics of OHSAS Occupational Health & Safety Management System
MCS Business Profile Yr Copyright (C) MCS 2013, All rights reserved. 2 MCS Business Focus MCS Business Profile MCS has a business.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Research and Development Inland Navigation Research Inland Waterways Conference March 7, 2007 Cincinnati, OH Program Manager: James Clausner HQ Navigation.
T +44 (0) W insensys Intelligent Sensing Solutions LIFE OF FIELD INTEGRITY MONITORING FOR SUBSEA ASSETS Lenny Sutherland Director,
Hydrogen risk assessment in São Paulo State – Brazil Newton Pimenta Sandro Tomaz Giuseppe Michelino 4 th International Conference on Hydrogen Safety ICHS.
WHO Prequalification Programme of Medicines: Experience Working with Manufacturers and Regulators in the WHO Eastern Mediterranean Region Mohamed Abdelhakim.
IMP Research and Technological Development Programs Oscar Valle Molina Federico Barranco Cicilia Mexican Petroleum Institute (IMP) ICRARD Meeting June.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Pipeline Safety: How the Mayor’s Council On Pipeline Safety Can Help Presentation to: Mayor’s Council on Pipeline Safety Conference Name: Christopher A.
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Development of Agreement Concerning the Adoption of Uniform Conditions for Periodical Technical Inspections of Wheeled Vehicles and the Reciprocal Recognition.
Buried Pipe Infrastructure Researchers: Gavin Sailor, Ali Hassan-Zahraree, Juanjuan Zhu, Michele Schirru, Mark Ke Ma Academics: Richard Collins, Robin.
1 1 Presenter / date if required Independent, integrated thinking.
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
Offshore Europe September 8-11, 2015 ABS Group Offshore Drilling.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Brazil Energy & Power VIII Magda Chambriard Director Brazilian Petroleum Agency The present scenario in Brazilian Oil & Gas sector.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Fire Service Incidents. Today’s fire service does much more than fight fires. The Fire Service has become the primary source of emergency response and.
4/28/2017 Stress Corrosion Cracking Assessment in Pipeline Mohammed Abu Four October 11, 2010.
Pipeline Safety Management Systems
Lock Out & Tag Out.
Assessment of Safety and Physical Environment factors in Governmental Primary Schools in Dammam Farhan M Al-Anezi.
HSE rules & regulations
BASIC PROFESSIONAL TRAINING COURSE Module III Basic principles of nuclear safety Case Studies Version 1.0, May 2015 This material was prepared.
Design Controls and Production & Process Controls
US&R Search Terms and Procedures
Infinium Energy Services
TMR4225 Marine Operations, ROV systems:
Better with Augmented Reality
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

ICRARD 2010 RAPHAEL QUEIROZ Buxton, June 23 rd, NATIONAL AGENCY OF PETROLEUM, NATURAL GAS AND BIOFUELS

1.Operational Safety Department: Mechanical Integrity Audits/Inspections (until 2009); Resolution ANP 43/ Support for Research & Development: Legal requirement – investment clauses; Integrity management projects: AURI and Monflex. 3.Conclusions: Partnership in projects; Challenges. P RESENTATION S TRUCTURE

S AFETY - ANP R ESOLUTION N º 43/2007 Focus on Safety Management Systems New Regulatory Framework for Offshore Safety  Performance-Based/Goal Setting Model  Fewer prescriptive requirements  Non-restrictive approach to technological innovations Minimum requirements for: Mechanical Integrity, Risk Assessment, Contractors Selection, Internal Audits, Incident Investigations, Management of Change, Safe Working Practices, Simultaneous Operations etc.

C ONCESSIONAIRE R ESPONSIBILITIES  Ascertain that the installation operator has a management system that meets the practices of the Management System for Operational Safety (SGSO) established by the ANP in the Technical Regulation;  Ascertain that the installation operator will provide the verification of the critical elements for operational safety and will audit the Operational Safety Management System as prescribed in the Technical Regulation; and  Submit to the ANP the Operational Safety Documentation.

ANP D UTIES  Carry out the analysis of the Operational Safety Documentation – beginning of operation is allowed if ANP approves it;  Carry out audits at the installation to verify the performance of the Operational Safety Management System – 8 audits/month with Bureau Veritas (BV);  Carry out inspections of the critical elements for operational safety – Practice 11 (essencial);  Put into effect injunction actions when found non-conformities regarding the Technical Regulation.

Management, Leadership and Personnel MP 1: Culture of Safety, Commitment and Managerial Responsibility MP 2: Involvement of Personnel MP 3: Personnel Qualification, Training and Performance MP 4: Work Environment and Human Factors MP 5: Selection, Control and Management of Contracted MP 6: Monitoring and Continuous Improvement of Performance MP 7: Audits MP 8: Information and Documentation Management MP 9: Incident Investigation Facilities and Technology MP 10: Design, Construction, Installation and Decommissioning MP 11: Critical Operational Safety Elements MP 12: Risk Identification and Analysis MP 13:Mechanical Integrity MP 14: Planning and Management of Major Emergencies Operational Practices MP 15:Operational Procedures MP 16:Management of Change (MOC) MP 17: Safe Working Practices and Control Procedures in Special Activities O PERATIONAL S AFETY D OCUMENTATION

Objectives of supporting for R & D:  Legal Requirement;  Development of New Technologies: AURI and Monflex Projects;  Centers of excellence: CENPES (Petrobras Research Center)  Qualification of the Oil and Natural Gas professionals: Human Resource Program;  Development of Geological Knowledge of the sedimentary basins: ANP is drilling in order to bid better blocks for exploration and production of oil and natural gas. S UPPORT FOR R&D

R&D I NVESTMENT C LAUSE In the case of Special Participation Fee be owed by a field in any quarter of a year, the Concessionaire must realize expenses in Research and Development in an amount equal to 1% of the net revenue of Production for that field. YearTotal 1998/99 $ , /01 $ , /03 $ , /05 $ , /07 $ , $ ,82 TOTAL $ ,92

1.A.U.R.I. – Autonomous Underwater Riser Inspection Tool; 2.Monflex – Monitoring of Flexible Oil Lines. S ELECTED P ROJECTS Projects selected are meant to be used mainly in deep water operation on the management of riser integrity:

Objective: 1.Managemente of riser integrity; 2.Inspect the vertical section of the riser in order to detect Corrosion and Fatigue with lower price and safer technique. A.U.R.I. P ROJECT The A.U.R.I inspection may be set by 4 different parameters (also means redundances in case of failure): Maximum pressure on depth sensor ; The length of the run; Maximum mission duration; Maximum allowed tilt (inclinometer) < 30º.

A.U.R.I. P ROJECT Most used technique – ROV for visual inspection: Requires experienced operator; High cost – special vessel; Continuous monitoring. Pipeline with anomalous diameter variation Polymeric sheath damage and exposed armour steel layer.

A.U.R.I. P ROJECT A.U.R.I Tool primary concerns: Not getting trapped under the TDP (Touch Down Point) and not getting crushed by the weight of the riser causing damage to the pipeline; Severe electrical failure, returns automatically – Positive buoyancy; Mechanical fuses break without releasing sharp pieces – in case of rescue with ROV is needed.

A.U.R.I. P ROJECT A.U.R.I Tool Propulsion: 2 thrusters; Used to do all the inspection (positive buoyancy only for the safety of the tool. Suspension: Eight rollers – diameters from 190 to 360 mm; Absorb impacts and negotiate variation preventing AURI from getting stuck.

A.U.R.I. P ROJECT Onboard sensors: four cameras, pressure transducer, odometers, digital compass, inclinometer and thermometers; Lights on only for a brief period – cameras shooting; Digital compass – exact positioning of the acquired images; Odometers – images each 300 mm. Embedded computer and Software control the system after AURI starts, can be upgraded and store the inspection data and logs. The mission is considered complete when reach the parameters set: pressure, distance, time and inclination.

A.U.R.I. P ROJECT Three options for launching: From the surface of the platform; Submerged with a diver; Submerged with ROV. Testing: The AURI has only been tested in a pool environment with offshore tests.

A.U.R.I. P ROJECT Mission logic control worked for different returning criteria; Returned without any human intervention; The illuminating was considered appropriate; Forces produced by the thrusters in agreement with the manufacturer’s specification; Dynamic friction on the rollers was higher than expected – problem in suspension design; Inspection of 1,000 m – estimated time is 44 minutes. Test Results:

A.U.R.I. P ROJECT Prototype

A.U.R.I. P ROJECT Challenges for an autonomous riser inspection tool; Hasn’t been tested in real condition yet, but it seems to be good alternative with low cost, low time, safer condition; Possible to be used as a platform for new types of inspections using other techniques, such as radiography. Conclusion: AURI Video

Introduction: As the operation water depth for flexible risers increases, the stress level in these structures also increases. This higher load, associated with stress concentration close to end fitting, can induce fatigue damage in tensile armors at riser top section. Progressive rupture of wires due to fatigue, which may be accelerated by corrosion, is an important indication of deterioration in riser-end fitting connection, and has become a typical failure mechanism for flexible riser top section. M ONFLEX P ROJECT

Objective: In order to mitigate the progression of these damages, this techniques try to come with early detection of failure mechanisms at the riser-end fitting connection, specially at the tensile armors with a continuous monitoring. There are techniques under development: 1.Visual torsion monitoring through video cameras; 2.Monitoring through optical fiber sensor extensometers. M ONFLEX P ROJECT

Main damages: Usually caused during installation; Majority of occurrences from 30m depth to the platform connection, more concentrated in the close end fitting; Torsional instability, external sheath damage and corrosion. M ONFLEX P ROJECT

Visual torsion monitoring through video cameras; M ONFLEX P ROJECT Small angle deformation and on-line data acquisition in order to provide immediate identification for non-conformities; Procedure: attaching target on the riser – behavior on the video- camera; Already been installed in 4 platforms and results were considered efficient. Plan to install another 50 until the end of 2010; PTZ (Pan, Tilt and Zoom) system on the cameras; Multiple targets – 1 camera.

Visual torsion monitoring through video cameras M ONFLEX P ROJECT System: Target picture and target digitalized image – comparison between the images and a graph showing the torsion variation; In case of excess of variation on the predefined values, sound an alarm.

Monitoring through optical fiber sensor extensometers. M ONFLEX P ROJECT System: Many optical fiber sensors covering 100% of the wires; Remote sensing – software; Rupture brings tension from the operational tension to zero.

C ONCLUSION Searching for partners: 1.Brazil, through CENPES (Petrobras Research Center), is open for partnerships in the projects with universities or technological institutes: 2.CENPES + Brazilian Universities + International Universities. 3.AURI Project – new technologies (ultrasound inspection or radiography inspection), robotic solutions and improvement of the tool. 4.Other Mechanical Integrity Projects.

C ONCLUSION Searching for partners: 5.Challenges with ultra deep water – how to maintain the gas pipeline integrity under 2,000 m water depth and 300 Km distance to the shore (foreseeing problems in 5/10 years). 6.Challenges with ultra deep water: How to export the natural gas over the distance of 3oo Km to the shore; How to maintain the gas pipeline integrity under 2,000 m water depth. 7.Production of CO2: injection or exporting?

THANK YOU! RAPHAEL QUEIROZ