Technical Workshop Implementing VSPEX in a private cloud.

Slides:



Advertisements
Similar presentations
FederalAppliance.com Self-Service Pricing. Full-Service VAR. Server / Storage Consolidation Plan using VMWare and EqualLogic Virtual Machines Virtual Network.
Advertisements

© 2009 VMware Inc. All rights reserved vCenter Site Recovery Manager 5.1.
Ed Duguid with subject: MACE Cloud
Ed Duguid with subject: MACE Cloud
Customer Presentation ThinkServer EMC VSPEX Private Cloud Solutions.
User Documentation.  You cannot build a system for a client and leave them without adequate documentation  Computer systems are complex, require configuration.
A Combat Support Agency Defense Information Systems Agency Storage Directions August 2011.
VMware and automation within Sky Douglas Carson, March 2012.
Network Design and Implementation
AUTHOR: Michael Hassan Product Manager - Managed Hosting Date: 29/04/2008 How Windows Server 2008 can optimise your managed hosting platform.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Virtualization and HA PI Systems: Three strategies to keep your PI.
1© Copyright 2014 EMC Corporation. All rights reserved. CUSTOMER REFERENCES.
DNS Arrow Virtualisation and the business opportunity it presents. Steve Pearce Managing Director.
© 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice HP StorageWorks LeftHand update Marcus.
Module 8 Implementing Backup and Recovery. Module Overview Planning Backup and Recovery Backing Up Exchange Server 2010 Restoring Exchange Server 2010.
Virtual Desktop Infrastructure Solution Stack Cam Merrett – Demonstrator User device Connection Bandwidth Virtualisation Hardware Centralised desktops.
© 2010 VMware Inc. All rights reserved Data Protection Module 10.
1 Virtualization Services. 2 Cloud Hosting –Shared Virtual Servers –Dedicated Servers Managed Server Options Multiple Access Methods –EarthLink Business.
Installing Virtualisation Software and Virtual Servers.
SAP on windows server 2012 hyper-v documentation
November 2009 Network Disaster Recovery October 2014.
1© Copyright 2013 EMC Corporation. All rights reserved. EMC and Microsoft SharePoint Server Data Protection Name Title Date.
Los Angeles County eCloud Overview November 26, 2012.
Server Virtualization: Navy Network Operations Centers
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
Windows Azure Team 9 Ben Holland Bao Nguyen Eric Petrowiak Barret Schloerke.
Network Management Solution Ashley Stanifer. Overview Statement of the Problem Product Description and Intended Use Design and Development Deliverables.
IT Infrastructure Chap 1: Definition
Offsite Backup Solutions Justin Paul Senior Virtualization Engineer / VMware vExpert –
Virtualizing and Centralizing Network Infrastructure at a Decentralized Federal Statistical Agency Elvera Gleaton Joseph.
Planning and Designing Server Virtualisation.
Virtualization for Storage Efficiency and Centralized Management Genevieve Sullivan Hewlett-Packard
Network Plus Virtualization Concepts. Virtualization Overview Virtualization is the emulation of a computer environment called a Virtual Machine. A Hypervisor.
IO – CART Project Status Protocol Revision Subcommittee Update 06/22/06.
608D CloudStack 3.0 Omer Palo Readiness Specialist, WW Tech Support Readiness May 8, 2012.
UpgradeX and CloudSuite What you need to know. WHY?
Availability on Demand (Business Continuity and DR, and more…)
Orchestrator 2012 The Unknown Hero of Automation David Norling-Christensen Senior Systems Architect.
[INSERT COMPANY NAME] DISASTER RECOVERY SERVICES [Insert Date]
BACKUP/MASTER: Strategies for Archiving Dianne McAdam Senior Analyst and Partner Data Mobility Group.
David Palme Portland Schools. Why I’m Here Today Portland Public Schools Small Department 1.5 FTE Old Equipment 20 Servers (8 10+ years old, 5 ESXI, 5.
23-Jan-16 CLOUD COMPUTING & IPTV BY ROBERT NATHAN.
Microsoft Windows Server 2012 R2. What’s NEW in Windows Server 2012 R2.
Practical IT Research that Drives Measurable Results Leverage Server Virtualization for DR Affordability and Agility 1Info-Tech Research Group.
Data Hosting and Security Overview January, 2011.
U N C L A S S I F I E D LA-UR Leveraging VMware to implement Disaster Recovery at LANL Anil Karmel Technical Staff Member
CTS Quarterly Customer Meeting CTS Disaster Recovery (DR) Project October 22, 2014.
 There is a growing trend in the use of digital media compared to more traditional formats  The Apple iTunes Store SM became the #1 music retailer in.
Enterprise Vitrualization by Ernest de León. Brief Overview.
Barracuda Backup Easy Cloud-Connected Backup Version 5.4 | July 2014.
Cloud readiness assessment
Course: Cluster, grid and cloud computing systems Course author: Prof
Azure Site Recovery For Hyper-V, VMware, and Physical Environments
BEST CLOUD COMPUTING PLATFORM Skype : mukesh.k.bansal.
Software Defined Storage
Disaster Recovery Technical Infrastructure at George Mason University
Welcome! Thank you for joining us. We’ll get started in a few minutes.
microsoft dynamics ax training in dubai (msdynamicsaxtraining.com)
Customer Profile (Target)
Managing Clouds with VMM
Windows Server 2016 Software Defined Storage
Microsoft Ignite NZ October 2016 SKYCITY, Auckland.
Delivering Distance Learning Experiments in Local Area Networking
Microsoft Virtual Academy
Using the Cloud for Backup, Archiving & Disaster Recovery
SUSE CaaS and Dell EMC.
PerformanceBridge Application Suite and Practice 2.0 IT Specifications
Brown County General Hospital Virtualization Project
How Dell, SAP and SUSE Deliver Value Quickly
Presentation transcript:

Technical Workshop Implementing VSPEX in a private cloud

Geoffrey McGowan Solutions Architect at Comsys Specialising in Virtualised high complexity environments Introduction

Introduction to the Environment Medical Imaging Customer based in Ireland Main Sites in Dublin Provides centralised image datastore for multiple clinics and hospitals Requirement to meet stringent ISO certifications for data practices and data retention

Customers Requirements Move to a completely virtualised environment Virtualise mission critical General Electric Centricity RISi application Increase redundancy and RTO for mission critical General Electric Centricity RISi application Build a modular SAN environment which would form the basis of a new virtualised environment to replace the current physical environment. Reduced RTO for critical backup restores

Customers roadblocks Highly complex application General Electric Centricity RISi with stringent set of requirements. First time that the General Electric Centricity RISi application would be virtualised in Ireland Due to mission critical requirements, multiple vendor support cases had been an issue in the past (Support Ping-Pong) Limited budget Small amount of dedicated specialised IT staff Short window for project completion

Comsys Proposed Solution 4 Phase approach Phase 1 - Design Phase 2 – Proof of Concept Phase 3 – Implementation Phase 4 – Go live

Phase I Design

Phase I – Design steps Initial Workshop with customer to details required Service levels, RPO/RTO, growth levels, support requirements and datacentre constraints if any. Design call with GE RISi architects to ascertain software requirements and possible Caveats with it running in a virtualised environment. Create a design using the VSPEX approved framework. Create service offering with SPoC for all hardware components, eliminating “support Ping Pong” Create and document final design, present to customer and GE architects for final approval

Phase I – Design overview Compute – Customer has existing HP estate, so Comsys recommended 2 x HP DL380 G7 servers in HA cluster. Storage– The customer would like future expansion, as well as high performance disk. Comsys recommended a VNX 5100 SAN with redundant Brocade 300B switches. Software- Comsys recommended VMWare Essentials Plus to virtualise this workload. Backup – Comsys recommended 2 x Data Domain DD160 Appliances for backup. These would be replicated between sites for high availability.

Phase II Proof of Concept

Phase II Description – Proof of Concept Establish Test criteria and sign off requirements Create Project Plan Implement demo equipment Do Live P2V of running GE RISi instance to create test image Do online out of hours data copy utilising PowerPath Migration Enabler. Engage GE to do testing of virtual instance. Finalise Proof of Concept

Phase III Solution Implementation

Phase III Description – Implementation Final Site survey Rack and Stack of all equipment Installation and configuration, including VaaI and VaSA enablers. Stress test of environment and final sign off by all parties Dial home and reporting setup. DataDomain backup and replication policies configured.

Phase IV

Phase IV Description – Go Live Full RISi application shutdown Final synchronisation of data Final testing of virtual machines Physical shutdown of RISi servers. Moving all virtual machines to production VMNetwork. Final testing of access to environment. First backup of environment and confirmation of replication.

Project Overview Move from physical to virtual environment, increasing uptime, decreasing physical footprint and management over head Solution is a certified VSPEX solution, allowing for single point of support through Comsys, who in turn utilise support agreements EMC have in place with major vendors. Ability to quickly scale solution to encompass rest of the environment while keeping complexity and support costs down