November 20041 SLS RFM and RNG REPORT 18 November 2004.

Slides:



Advertisements
Similar presentations
05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
Advertisements

09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
1 16 June 2006 Space Link Services Area report to CESG Rome, Italy, 16 June 2006 J.L. Gerner / G. Moury.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
07-Apr-2014-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Fall 2014 Meeting London (United Kingdom) SPACE LINK SERVICES (SLS) AREA Gippo / Gilles.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Cesg-1 4 November 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
SLS-RFM WG deadlock over NASA’s position –Rec has a number of critical flaws including a logical dependence upon an SFCG recommendation.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
Image Data Compression WG Spring 2004 Pre-Meeting Status Report May 12, 2003 Meeting May 17-19, Greenbelt MD Chair: Pen-Shu Yeh.
1 23 January 2007 Space Link Services Area report to CESG/CMC Colorado Springs, USA, 24 January 2007 J.L. Gerner / G. Moury.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
November SLS AREA REPORT November SLS AREA REPORT CONTENTS A.CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA B.SUMMARY TECHNICAL STATUS OF EACH.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
1 Space Link Services Area report to CESG/CMC Darmstadt, Germany, 9 October 2007 J.L. Gerner / G. Moury.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Cesg-1 28 April 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
Navigation WG Report D. Berry NASA J. Fertig ESA.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
08 April 2005 Athens, Greece AD-NP - 1 MOIMS AREA: STATUS REPORT, Start of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC Area Directors Joint CESG/CMC.
November SECURITY WORKING GROUP REPORT November 2004.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 1 SLS-C&S WG Spring 2004 Meeting Summary to SLS Area Director.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
April Space Link Services AREA REPORT 15 April 2005.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
Panel P1J: Navigation Data April 2002 CCSDS P1J Status Report Spring Meeting, ESA/ESOC, Darmstadt, Germany Dates: April 8 – 11, 2002 Felipe Flores-Amaya.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
19-May-2015-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Spring 2015 Meeting CalTech (Pasadena, CA, USA) SPACE LINK SERVICES (SLS) AREA Gippo /
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
SPACE INTERNETWORKING SERVICES (SIS) AREA
SLS-RFM WG deadlock over
SLS AREA REPORT November 2004 November 2004.
Delta-DOR WG: Report of the Fall 2010 Meeting
Joint IPR/DAI Workshop
SPACE LINK AREA MID-TERM REPORT
Presentation transcript:

November SLS RFM and RNG REPORT 18 November 2004

November AREA REPORT CONTENTS A.CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA B.SUMMARY TECHNICAL STATUS OF EACH WG & BOF C.CROSS-AREA TECHNICAL ISSUES D.OTHER ISSUE AND CONCERNS E.PROPOSED AREA RESOLUTIONS/ACTION ITEMS

November RFM WG 2.RNG WG A.LIST OF CURRENT WGs AND BOFs WITHIN AREA AREA REPORT

November B.SUMMARY TECHNICAL STATUS 1.RFM WG Goal: align B with WRC-03, SFCG-23 and SFCG-24 Working Group Status: Active Working Group Summary Situation: Working Group Summary progress: (editorial) revised recommendations generated in October; Agency review on 24 recommendations completed; Agreed way forward to resolve deadlock on recommendation found. White drafted in accordance with SFCG 14-3R6 to remain white until after SFCG-25 meeting in October 2005; status:OKCAUTIONPROBLEM comment:Good progress AREA REPORT

November B.SUMMARY TECHNICAL STATUS 1.RFM WG Working Group Summary progress: small number of revised recommendations expected in Spring 2005, following on-going simulation results and joint RFM WG-CC WGs meeting. Problems and Issues: Requirement to await SFCG-25 completion before finalizing white to avoid same problems of current  need to delay WG termination date from August 2005 to end of November Green Book containing Earth station characteristics (411.0-G-3) dated May 1997 does not reflect current capabilities and may mislead users. Updating it is a difficult and time-consuming job requiring a senior person with intimate technical knowledge of Earth station equipment design. NASA/JPL maintained it in the past. AREA REPORT

November B.SUMMARY TECHNICAL STATUS 2.RNG WG Goal: issue blue book on novel ranging techniques Working Group Status: Active Working Group Summary Situation: Working Group Summary progress: Agency review on delta-DOR recommendation completed; Independent theoretical analysis and simulation results on most regenerative PN ranging specs available from two Agencies; Four (+one) different ranging schemes identified as possible candidates for regeneration; status:OKCAUTIONPROBLEM comment:Good progress AREA REPORT

November B.SUMMARY TECHNICAL STATUS 2.RNG WG Working Group Summary progress: Preliminary hardware results on a subset of the four options available from one Agency; White book (Issue 1) to be issued by July 2005 is being written with focus on regenerative PN codes; Transparent PN codes will be addressed after WB issue 1 is out. Problems and Issues: None so far. AREA REPORT

November A.None C.CROSS-AREA TECHNICAL ISSUES AREA REPORT

November D.OTHER ISSUES AND CONCERNS A.None AREA REPORT

November E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 1 : SLS-RFM-R Considering that: 1.The following 23 editorially revised recommendations were subject to Agency review: 2.1.8B, 2.2.4, 2.2.6, 2.3.3A, 2.4.6, 2.4.7, 2.4.9, A, B, A B, , 3.1.1, 3.1.6B, 3.2.1A, 3.3.1, 3.3.2A, 3.6.2A, 4.1.5, 4.2.1, 4.2.2, and 5.1. And recognizing that: 1.No RIDs were received during the review period The RFM WG resolves that: these 23 recommendations be raised to blue status and inserted in ACTION ITEM 1: SLS-RFM-A SLS AD seek by 01 Dec 2004 agreement of CESG/CMC to insert the 23 above mentioned editorially revised recommendations in blue book AREA REPORT

November E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 2 : SLS-RFM-R Considering that: 1.Revised recommendation was subject to Agency review; And recognizing that: 1.One RID was received during the review period, discussed during the Fall 2004 meeting, and disposed of The RFM WG resolves that: revised recommendation be raised to blue status and inserted in ACTION ITEM 1: SLS-RFM-A SLS AD seek by 01 Dec 2004 agreement of CESG/CMC to insert revised recommendation in blue book AREA REPORT

November E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 3 : SLS-RFM-R Considering that: 1.The following 13 revised recommendations were agreed upon during the Fall 2004 meeting: 2.1.3B, 2.1.4B, 2.1.7B, 2.3.2, 2.3.3A, 2.3.3B, 2.3.4A, 2.3.4B, 2.4.6, B, B, 3.1.2B, 3.3.3A. And recognizing that: 1.Proposed revisions are to bring such ‘old’ recommendations in line with current CCSDS agencies’ practice The RFM WG resolves that: these 13 recommendations be raised to pink status and be submitted for Agency review ACTION ITEM 1: SLS-RFM-A SLS AD seek by 01 Dec 2004 agreement of CESG/CMC to initiate Agency review of the above mentioned 13 revised recommendations. AREA REPORT

November E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 4 : SLS-RFM-R Considering that: 1.Minor editorial changes to recommendations and were agreed upon during the Fall 2004 meeting. And recognizing that: 1.Submitting editorial changes to Agency review is an unnecessary waste of already constrained Agency resources The RFM WG resolves that: editorially revised recommendations and be raised to blue status and inserted in ACTION ITEM 1: SLS-RFM-A SLS AD seek by 01 Dec 2004 agreement of CESG/CMC to insert the 2 above mentioned editorially revised recommendations in blue book AREA REPORT

November E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 5 : SLS-RFM-R Considering that: 1.The Green Book containing Earth station characteristics (411.0-G-3) dated May 1997 does not reflect current capabilities and may mislead users. 2.The document represents a resource used by many organizations planning new missions. In the past, NASA/JPL provided the book captain function and would consider doing so again, provided that the necessary resources were made available. The RFM WG resolves that: CESG/CMC be alerted about status of G-3 so that necessary resources are made available for the appropriate organization to update it. ACTION ITEM 1: SLS-RFM-A SLS AD alert by 01 Dec 2004 CESG/CMC to consider obtaining necessary resources for the appropriate organization to update G. AREA REPORT

November E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 6 : SLS-RFM-R Considering that: 1.A very difficult situation with recommendation is being solved by a white written along the lines of SFCG recommendation 14-3R6; 2.Such SFCG rec is up for final approval at SFCG-25 (October 2005); 3.The the activities of the RFM WG are due by August 2005 And recognizing that: 1.Present problems with current are in the inconsistencies with SFCG which could be again the case with new white version The RFM WG resolves that: the WG schedule is extended until end of November ACTION ITEM 1: SLS-RFM-A SLS AD seek by 01 Dec 2004 agreement of CESG/CMC on RFM WG 3-months schedule extension. AREA REPORT

November E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL RESOLUTION 1 : SLS-RNG-R Considering that: 1.Revised recommendation 2.5.6B was subject to Agency review; 2.No RIDs were received during the review period; 3.Revisions to 2.5.6B stem from current and future delta-DOR practices by ESA and NASA And recognizing that: 1.No other CCSDS Agencies are currently supporting delta-DOR activities The RNG WG resolves that: revised recommendation 2.5.6B be raised to blue status and inserted in ACTION ITEM 1: SLS-RNG-A SLS AD seek by 01 Dec 2004 agreement of CESG/CMC to insert revised recommendation 2.5.6B in blue book AREA REPORT