18-1Project Management Chapter 18 Project Management.

Slides:



Advertisements
Similar presentations
Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
CHAPTER 17 Project Management.
Chapter 17: Learning Objectives
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Advanced Project Management - CPH
pert and cpm ch 9 Learning objectives:
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
WEEK 15A – PROJECT MANAGEMENT (CHAPTER 3) Characteristics, tools, Pert/CPM, critical path, slack calculation, crashing SJSU Bus David Bentley1.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Operations Management
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
PROJECT MANAGEMENT PART SIX Chapter Eighteen Project Management.
Lecture 4 Project Management Chapter 17.
Roberta Russell & Bernard W. Taylor, III
Irwin/McGraw-Hill Project Management  Project series of related jobs usually directed toward some major output and requiring a significant period of time.
Project Management Chapter 17.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Project Management Chapter 17.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management. Learning Objectives  Discuss the behavioral aspects of projects in terms of project personnel and the project manager.  Discuss.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Operations Management
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
© Stevenson, McGraw Hill, Assoc. Prof. Sami Fethi, EMU, All Right Reserved. Project management; Chapter7 MGMT 405, POM, 2010/11. Lec Notes Chapter.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
© Stevenson, McGraw Hill, Assoc. Prof. Sami Fethi, EMU, All Right Reserved. Project management; Chapter 5 MGMT 405, POM, 2012/13. Lec Notes Chapter.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Project Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER EIGHTEEN Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Operations Management Project Management
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
18-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
17 Project Management Homework; 1b, 4b, 5b, Sup1, Sup2.
Chapter 16 – Project Management
Chapter 5: Project Management
Project Management (專案管理)
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
PART SIX PROJECT MANAGEMENT Chapter Eighteen Project Management.
Project Planning & Scheduling
Project Management for Business
17 Project Management.
Chapter 5: Project Management
17 Project Management.
Project Planning and Budgeting
Stevenson 17 Project Management.
Project Management Chapter 17
Presentation transcript:

18-1Project Management Chapter 18 Project Management

18-2Project Management Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A Done Build B B Done Build C C Done Build D Ship JANFEBMARAPRMAYJUN On time! Projects

18-3Project Management Project Manager Responsible for: WorkQuality Human ResourcesTime CommunicationsCosts

18-4Project Management Ability to motivate and direct team members. Make trade-off decisions. Expedite the work when necessary. Put out fires. Monitor time, budget, and technical details. Strong leadership skills. Function in an environment that is beset with uncertainties. Persuasion and cooperation of others to realize project goals. Maintain ethical behavior. Work with project champions, people, usually within the company, who promote and support the project. Project Management Skills

18-5Project Management Temptation to understate costs Withhold information Alter or mislead status reports Falsify records Compromise workers’ safety Approve substandard work Ethical Issues

18-6Project Management Project Life Cycle Concept Feasibility Planning Execution Termination Management

18-7Project Management Risk: occurrence of events that have undesirable consequences –Delays –Increased costs –Inability to meet specifications –Project termination Project Risk

18-8Project Management Identify potential risks Analyze and assess risks Work to minimize occurrence of risk Establish contingency plans Risk Management

18-9Project Management Work Breakdown Structure Project X Level 1 Level 2 Level 3 Level 4 Figure 18-3

18-10Project Management MARAPRMAYJUNJULAUGSEPOCTNOVDEC Locate new facilities Interview staff Hire and train staff Select and order furniture Remodel and install phones Move in/startup Planning and Scheduling Gantt Chart

18-11Project Management PERT and CPM PERT: Program Evaluation and Review Technique CPM: Critical Path Method Graphically displays project activities Estimates how long the project will take Indicates most critical activities Show where delays will not affect project

18-12Project Management Project Network – Activity on Arrow (AOA) Locate facilities Order furniture Furniture setup Interview Hire and train Remodel Move in

18-13Project Management Project Network – Activity on Node (AON) Locate facilities Order furniture Furniture setup Interview Remodel Move in 4 Hire and train 7S

18-14Project Management Project Network Path: A sequence of activities that leads from the starting node to the ending node. Critical path: The path with the longest activity time. Slack: The difference between the length of a given path and the length of the critical path.

18-15Project Management Network activities –ES: early start –EF: early finish –LS: late start –LF: late finish Used to determine –Expected project duration –Slack time –Critical path Project Network Time Estimation

18-16Project Management Project Network Time Estimation ES and EF Computation: –EF = ES+t –ES for activities leaving nodes with multiple entering arrows is equal to the largest EF of the entering arrow. LS and LF Computation: –LS = LF-t –For nodes with multiple leaving arrows, LF for arrows entering that node is equal to the smallest LS of the leaving arrow.

18-17Project Management Project Network Slack Time The slack time can be computed in either of two ways: Slack = LS - ES or LF – EF

18-18Project Management Example weeks 6 weeks 3 weeks 4 weeks 9 weeks 11 weeks 1 week Locate facilities Order furniture Furniture setup Interview Hire and train Remodel Move in

18-19Project Management Example 1: Path Length, CP, Slack Time Critical Path

18-20Project Management Example 1: ES and EF

18-21Project Management Example 1: LS and LF

18-22Project Management Example 1: Activity Slack Time ActivityLSES(LE-ES) Slack

18-23Project Management Time-Cost Trade-Offs: Crashing To avoid late penalties, To take advantage of monetary incentives for timely or early competition of a project, To free resources for use on other projects, To beat the competition to the market, or To reduce the indirect costs associated with running the project.

18-24Project Management Time-Cost Trade-Offs: Crashing Total cost Shorten Cumulative cost of crashing Expected indirect costs Optimum CRASH Figure 18-11

18-25Project Management 6a6a 4d4d 5c5c 10 b 9e9e 2f2f Example 2: Project Network

18-26Project Management Example 2: Crashing Cost

18-27Project Management Example 2: Path Length and CP

18-28Project Management Example 2: CP Activity Slacks

18-29Project Management Example 2: Crashing

18-30Project Management Advantages of PERT Forces managers to organize Provides graphic display of activities Identifies –Critical activities –Slack activities

18-31Project Management Limitations of PERT Important activities may be omitted Precedence relationships may not be correct Estimates may include a fudge factor weeks

18-32Project Management Imposes a methodology Provides logical planning structure Enhances team communication Flag constraint violations Automatic report formats Multiple levels of reports Enables what-if scenarios Generates various chart types Advantages of PM Software

18-33Project Management Computer aided design (CAD) Groupware (Lotus Notes) Project management software –CA Super Project –Harvard Total Manager –MS Project –Sure Track Project Manager –Time Line PM Software Technology