14 - 1 Wrap Rate Technique Chapter 14. 14 - 2 Introduction The Wrap Rate technique is a method used to allocate profit and other overhead costs to actual.

Slides:



Advertisements
Similar presentations
1 CHAPTER M2 Classifying Costs © 2007 Pearson Custom Publishing.
Advertisements

Accumulating and Assigning Costs to Products
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Indirect Cost Workshop
Activity Based Costing
Cost Planning & Scheduling CTC-415. Bid Estimate Becomes the project budget upon signing of contract Can cost load the schedule –Effective means of cost.
Factory Overhead. Manufacturing Overhead Job No. 1 Job No. 2 Job No. 3 Charge direct material and direct labor costs to each job as work is performed.
5 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Activity-Based Management Chapter.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Cost Management Systems and Activity-
5 - 1 Activity-Based Costing and Activity-Based Management Chapter 5.
Managerial Accounting and Cost Concepts
(c) 2002 Contemporary Engineering Economics 1 Chapter 3 Cost Concepts and Behaviors General Cost Terms Classifying Costs for Financial Statements Cost.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Introductions Mike Dement Multi Management Services
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Management Accounting: A Business Partner Chapter 16.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
1 Copyright  2010 & 2007 McGraw-Hill Australia Pty Ltd PPTs t/a Accounting: What the Numbers Mean 2e (revised) by Marshall, McCartney & Van Rhyn PowerPoint.
March 2005 UMORS 1 UMORS Vander Kooi and Associates, Inc Ultimate Multiple Overhead Recovery System.
Accounting Systems for Manufacturing Businesses Chapter 10.
13-1 CHAPTER 13 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Accounting and Reporting Systems.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 17-1 JOB ORDER COST SYSTEMS AND OVERHEAD ALLOCATIONS Chapter 17.
Three manufacturing costs Direct material cost: Consist of all those material that can be identified with a specific product. Example: wood used in manufacturing.
Full Costs and Their Uses
1 The George Washington University School of Engineering & Applied Science Department of Electrical & Computer Engineering Engineering Economic Analysis.
1 Copyright © 2008 Thomson South-Western, a part of the Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under.
Chapter 2 Basic Managerial Accounting Concepts
Other Operating Budgets Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 39.
19-1 P ROCESS C OST S YSTEMS CHAPTER F Used for production of small, identical, low-cost items. F Mass produced in automated continuous production.
1 Activity-Based Costing and Activity-Based Management
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
1 Module19 Assigning Indirect Costs: Activity-Based Costing (omit pp to 19-13)
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Module 9. Cost Accumulation 1.  Direct /Indirect Cost  Cost Allocation  Cost Apportionment  Cost Driver  Cost Absorbtion  Treatment of Over/Under.
1-1 Dr. Hisham Madi. 1-2  Direct materials used and direct manufacturing labor can be easily traced to jobs.  They become part of work-in-process inventory.
4 - 1  2001 Prentice Hall Business Publishing Management Accounting, 3rd ed., Atkinson, Banker, Kaplan, and Young Traditional Cost Management Systems.
Copyright © 2012 The McGraw-Hill Companies, Inc. PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker,
CORNERSTONES of Managerial Accounting, 5e © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
Accounting for Factory Overhead
Allocating Overhead Chapter 16 … “Job Order Costing”: allocated overhead using Pred. Overhead Rate with Direct Labor as an allocation.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Chapter 5.
Accounting for Overhead Costs Introduction to Management Accounting Chapter 6.
The Islamic University –Gaza
Cost Allocation and Responsibility Accounting
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
4 - 1 ©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 4 Cost Management Systems.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Job Order Cost Systems and Overhead Allocations Chapter 17.
CHAPTER III FACTORY OVERHEAD CONCEPT AND ALLOCATION OF FACTORY OVERHEAD.
COST PLUS. Reasons for Cost-Plus Can’t agree on a price Specialty work Notice of Changed Conditions.
Prepared by Diane Tanner University of North Florida ACG Allocating Indirect Costs: Simple Costing & ABC 2-2.
McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved CHAPTER 13 McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc.,
Is There a Proper Accounting for Indirect Costs?
Activity-Based Costing
Fundamentals of Cost Accounting, 4th edition Lanen/Anderson/Maher
Job-Order Costing Chapter 3.
Cost Accounting and Reporting Systems
Activity-Based Costing and Activity-Based Management
MANAGEMENT ACCOUNTING
“Cost Driver” (the activity) Owning a car
Cornerstones of Managerial Accounting 2e Chapter Fourteen
Manufacturing Accounts
Activity-Based Costing Chapter 3
Activity Based Costing - ABC
Cornerstones of Managerial Accounting, 6e
Classification of Cost
Fundamentals of Cost Management
Activity-Based Costing Chapter 3
Principles of Cost Accounting 15th edition
Presentation transcript:

Wrap Rate Technique Chapter 14

Introduction The Wrap Rate technique is a method used to allocate profit and other overhead costs to actual labor costs. Total Cost equals – Direct Labor Cost – plus Overhead Cost – plus Other Costs

Direct Labor Many of our cost estimating relationships use labor hours as a parameter, or predict cost in terms of labor hours. There are two major categories of direct labor: – Engineering » Activities associated with research, design, and development or preparation of products and procedures. – Manufacturing » This is the “hands-on” effort to produce a product.

Wrap Rates Once we have determined the labor hours required to produce an item, either by performing an engineering buildup or by applying a cost estimating relationship, we need a means of converting those hours to dollars. A fully-burdened labor rate is a rate which includes all the contractor costs necessary to convert an estimate of contractor hours to contractor dollars. The wrap rate will typically include the direct labor wage rate, overhead costs, and other costs.

Wage Rates Four general factors impact the labor wage rate: – Variations in Geographical Locations » Supply and Demand of Work Available – Contractor Labor Force Variations » Supply and Demand of Workers – Variations in Skills » High skills vs. low skills – Variations with Time » Inflation » COLAs

Overhead Rates Also known as Indirect Cost or Burden. These costs are not directly identifiable with a specific cost objective. There are two distinct types of overhead costs: – Those that are so general in nature they cannot be assigned to a specific cost objective » Plant and equipment maintenance – Those that are so inconsequential that the cost of accounting for them exceed the benefits derived from doing so. » Consumables such as washers, sandpaper, lubricants.

Overhead Rates Most firms collect indirect costs in aggregate cost accounts called overhead pools such as – Manufacturing and Engineering Indirect Pools – General and Administrative Pools – Service Center Pools

Overhead Rates Most common Indirect Cost Pools: – Material Overhead: Costs related to transportation, acquisition, inspection and handling of materials. – Manufacturing Overhead: Indirect labor costs including supervision, inspection and maintenance. – Engineering Overhead: Costs of directing and supporting the activities of the Engineering Department. – General and Administrative: The costs of the company’s general and executive offices.

Overhead Recovery Bases In order to recover overhead costs it is necessary to allocate the indirect costs to the cost objective. This allocation results in charging the cost objective a share of the total indirect costs. Bases often include: – Direct Labor Hours – Direct Labor Dollars – Number of Production Units – Machine Hours

Other Costs The last piece needed to build a fully burdened wrap rate is “Other Costs.” “Other Costs” typically include – Profit (or fee) – Cost of Money – General and Administrative

Calculating a Wrap Rate Ship Hull Manufacturing Engineering Quality Control Tooling Manufacturing Direct Labor Overhead Mfg. Materials Other Costs Profit Cost of Money General & Admin Wrap Rate Components Wage Rate Overhead Other Costs

Calculating a Wrap Rate Example: Estimate the fully burdened contractor support cost given the following information: Given: – Expected contractor support is 120 man-months – Contractor support wage rate is $52.50 per man-hour – 160 man-hours per man-month – Overhead rate is 150% of Direct Labor dollars – Other Cost rate is 15% of (Direct Labor dollars + Overhead dollars)

Calculating a Wrap Rate Wage Rate = $52.50 per labor hour (CY98$) Overhead Rate = (150%)(Wage Rate) = (150%)($52.50) = $78.75 per labor hour Other Cost Rate = (15%)(Wage Rate + Overhead Rate) = (15%)($ $78.75) = $19.69 per labor hour Wrap Rate = Wage Rate + Overhead Rate + Other Cost Rate = $ $ $19.69 = $ per labor hour

Calculating a Wrap Rate Total Labor Hours = 120 man-months X 160 man-hours per man-month = 19,200 man-hours Fully burdened contractor support cost is $ X 19,200 man-hours = $2,898,048 (CY98$)