Review of ASME Guidance Articles on Repair Strategies

Slides:



Advertisements
Similar presentations
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Advertisements

GTI’s Composite Materials (CM) Program
Neptune Research Inc. Introduction For more than 25 years, Neptune Research Inc. has focused its strategic research initiatives on the development, manufacturing.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
ASME Liaison Report to CRE May 18, 2011 Urey R. Miller, P.E.
Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.
Severe Service Metal Seated Ball Valves
PCI 6 th Edition Handbook History. Presentation Outline PCI history Notable modifications to the 6 th Edition General chapter by chapter overview.
PHMSA Perspectives Construction Process & Standards
© 2012 Delmar, Cengage Learning Automotive Hoses Chapter 23.
Joining, Installing, and Supporting Pipe
Composite Wrap for Non-leaking Pipeline Defects Lessons Learned from Natural Gas STAR Transmission Technology Transfer Workshop Duke Energy Gas Transmission,
Materials and Joining March 2005 R&D Forum David Horsley TransCanada Pipelines Limited.
Pressure Systems 10CFR851 - The Way to Go but, Some Tough Issues W. Oren Manager of Engineering and Technical Services Division Pressure Systems 10CFR851.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Student Book © 2004 Propane Education & Research CouncilPage Installing Buried Distribution Lines Using Polyethylene Tubing and Mechanical.
Gas Transmission Pipelines
Shear - Tensile - Compression Stresses Slip Ted 126 Spring 2007.
Unit 204: Common plumbing processes
November 7, Topics NESCC 2013 Survey – review of results Buried pipe coatings Seals for doors and penetrations to prevent flooding NESCC discussion.
For the interconnection of pneumatic components and systems
Steel Pipe Plumbing Systems
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Introduction to Fitness-For-Service (FFS)
7A1 Friction & Galling Test
Mechanical for Oil Heat
Compressed Air Piping Systems by Asahi/America
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
Pressure Vessels.
Composite Wrap Lessons Learned from Natural Gas STAR EPA’s Natural Gas STAR Program, Pioneer Natural Resources USA, Inc., and Pioneer Natural Resources.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
INTRODUCTION Definition:
Introduction to Plumbing Date. Bellwork 0 Fill out your KWL sheet about plumbing 0 What do you K now about plumbing? 0 What do you W ant to learn about.
SEALING the ENGINE n Chapter 5 n Classroom Manual –Page95 n Lab Manual –Page 113 CBC AUTOMOTIVE RK.
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
1 HVACR316 - Piping Related Codes Trade Math I Related Codes Trade Math I.
Sub Committee 6 Ballot resolution Summary June 2012 Mike Briggs.
Sealing the Engine Walla Walla Community College Automotive Technology.
Institute of Building Materials Research Conservations Repair and Polymer Composites RWTH Aachen University, Germany “Who`s managing the quality in the.
PLAN PRESENTATION ABSTRACT. INTRODUCTION This system has been devised and developed by T.D.Williamson Inc. to enable pipeline operators to carry out maintenance,
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
There are four chief manufacturing methods: CASTING (Zero process) FORMING(Zero process) MACHINING ( Negative process) WELDING (Positive process) These.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Date of download: 9/16/2016 Copyright © ASME. All rights reserved. From: Guidelines for Repair Welding of Pressure Equipment in Refineries and Chemical.
21 Curtis Court Building 1 Cartersville, GA Phone: Web Site:
Line Blinding/Blanking Options
Mould Maintenance Presented By S.K Mandal.
Concrete Repair.
Materials Selection and Coatings
Ti/SS transitions A.Basti INFN-PISA*
EXPERIENCE Adherence to National Industry Standards, Procedures and Guidelines.
Automotive Engines Theory and Servicing
Guidelines for Leak Repair & Rehabilitation of Oil & Gas Pipelines
THE SKINNER COMPANY Product Review
Fuel Supply System Service
Piping.
For the interconnection of pneumatic components and systems
Welcome! Drafting 2323: Pipe Drafting
Tapping a Pipe.
Flanges.
TRENTON Casing Filler Presentation
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
VG INSTALATION & MAINTENANCE.
PRESSURE EQUIPMENT REPAIRS API 510/570 and ASME PCC-2 are both PCCs
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Automotive Engines Theory and Servicing
Gas Transmission Pipelines
Presentation transcript:

Review of ASME Guidance Articles on Repair Strategies Clay Rodery BP Chemicals Technology & Engineering Member/ASME Post Construction Standards Committee

ASME PCC-2: Repair of Pressure Equipment and Piping Introduction About the articles/what they are Guidelines for application Publication details Review of Balloted Articles What they cover Key details Status Other articles in progress/articles with an identified need

Scope Provides methods for repairs of equipment & piping within the scope of ASME Pressure Technology Codes & Standards after they are placed in service May be temporary or permanent, depending on the circumstances Provides only technical procedures and information; administrative or policy requirements are outside its scope

Organization Section 1 – covers Scope, Organization & Intent Section 2 – repair methods involving welding, brazing, soldering, or other methods involving metal deposit Section 3 – mechanical repairs, with and without sealant, such as bolted clamps & fixtures Section 4 – repairs using nonmetallic means, such as nonmetallic liners and wraps, and bonding Section 5 – covers examination and testing methods and techniques

Intent Provides technical information, procedures, and recommendations for repairs Determined by consensus to be recognized and generally accepted good engineering practice Refer to post construction codes and jurisdictional requirements for administrative requirements

Guidelines for Application Users are cautioned that these articles have been developed generically and are recommended for general applications Precautions that are provided should not be considered to be all inclusive Sound engineering practices/judgment should be used to assess applicability to a specific situation Each repair should be subjected to an appropriate review by qualified personnel Reviews should consider subsequent degradation of the repaired component

Details of Publication Current plan is publish in hard copy; no electronic version planned First edition will be published when a sufficient number of articles are available Subsequent articles will be issued as an addenda service Should publish First edition in 2nd half of 2003

Layout of Articles Introduction Limitations Design Fabrication Inspection Testing References Appendices (As Needed)

Freeze Plugs A technique for isolating a section of piping by cryogenically cooling the outer wall of the pipe and freezing the contained liquid to form a plug CO2 and liquid nitrogen used as medium Can be used on a variety of liquids Experience holding pressures up to 2500 psi Status: Board Approved

Freeze Plugs

Butt Welded Insert Plates Replacement of pressure boundary mat’l with insert plate with full penetration butt welds Covers portions of plates (not complete plates, courses, or components) Replacement plate may include nozzles Limited in size only as req’d to meet tolerances Status: Approved by PC Stds Committee

Butt Welded Insert Plates

Welded Leak Repair Box Covers welded enclosures placed over component being repaired/welded in place Can cover pipe, flanges, valves, fittings, etc May/may not be pumped with sealant Does not include bolted or clamped boxes Status: Approved by PC Stds Committee

Welded Leak Repair Box

Damaged Threads in Tapped Holes Options include: Drilling damaged holes to larger size for tapered bolts Drilling damaged holes to larger size for helical coil thread inserts Filling w/ weld metal, redrilling & retapping Status: Approved by PC Stds Committee

Damaged Threads in Tapped Holes

Non-Metallic Internal Lining (Sprayed Form) for Buried Pipe Covers thermosetting resins sprayed as protective or structural lining to buried pipe Can provide structural strength, chemical/ abrasion resistance, leakage barrier, improve flow Limited to buried pipe Most effective for diameters > 24 inch Status: Resolving Stds Committee Negatives

Flange Refinishing Covers refinishing of flange faces to: Repair mechanical imperfections Restore material lost due to corrosion or other damage Change flange face finish or enable use of different gasket Status: Resolving Stds Committee Negatives

Flaw Excavation Covers surface or embedded flaws that exceed code allowances May be removed by excavation and filled with weld metal or left as-is as appropriate Includes grinding, machining, lapping, honing, flapping, or thermal gouging Status: Resolving Stds Committee Comments

Flaw Excavation

Mechanical Clamps Split bolted fittings to enclose leaking components/reinforce damaged components Std catalog items or custom designed May/may not include injectable sealant Reinforced to resist pressure end thrust May be non-structural or structural Status: Resolving Subcommittee Negatives

Mechanical Clamps

External Weld Overlay for Repair of Internal Thinning Covers repairs due to internally thinned components by external weld overlay Excludes repair of components with cracks In some cases, may be performed in service Engineered repair (qualified by design calcs or proof test of mockup) Status: Resolving Subcommittee Negatives

External Weld Overlay for Repair of Internal Thinning

Damaged Anchors in Concrete Covers repairs to column base anchors in concrete Involves post installed anchors by mechanical or chemical means Includes extension of existing anchor bolts when appropriate Status: Resolving Subcommittee Negatives

Damaged Anchors in Concrete

Full Encirclement Steel Sleeves Type A Sleeves: Not pressure containing, reinforcing only For non-leaking, non-growing defects Type B Sleeves: Welded circumferentially to carrier pipe For leaking defects and to provide full pressure & load carrying capability Status: Resolving Subcommittee Negatives

Full Encirclement Steel Sleeves

Seal Welded Threaded Connections/Seal Weld Repairs Covers requirements for seal welding of threaded connections Can be used for original construction or in-service piping systems Status: Resolving Subcommittee Negatives

Pipe Straightening Provides requirements and cautions for correcting a bent metallic pipe using hot or cold bending Does not cover systems that include mechanical joints (flanges, threaded joints, expansion joints, compression fittings, etc) Status: Subcommittee Level (1st Draft)

Replacement Covers replacement of pressure equipment or piping components or subassemblies May be replacement in kind or a modification Status: Resolving Subcommittee Comments

Other Articles in Progress Fillet Welded Patches With Reinforcing Plug Welds Non-Metallic Composite Wrap System for Pipe Post Weld Heat Treatment of Welded Repairs Repairs & Alterations Without Pressure Testing Repair Method for Valves with Pressure Seal Type Bonnet Joints Welded Lip Seals

Other Repair Articles General repair considerations Valve repairs Stem failure Pipe & tube crimping Cured in place inserted liners Low pressure composite wrap sleeves High pressure composite wrap sleeves Cured in Place Wrap Coatings Live Pipe Insertions Compressed Seal at Joints Straightening & Rounding Repair of Flange Leaks Other Than Clamps General Weld Repairs Weld Overlay Hard Surfacing

Other Repair Articles (Cont’d) Strip Lining On-Line Welding Seal Welding Repair of Weld Overlays Hot Torquing/Tensioning Bolt Changeout Heat Exchanger Tube Repairs Heat Exchanger Retubing Hydrogen Blisters Repair of Expansion Joints Local Post Weld Heat Treatment Stress Improvement Alternatives to Preheat Pressure Testing Riveted Tanks & Vessels

Summary Articles document good repair practices based on experience Provide technical considerations only – not administrative requirements Are not a “cookbook” – still require sound engineering judgment Because articles rely on experience base, increased participation will benefit industry