CSSE 372 31.October.2008 APF wrap-up and xPM Chapter 17-19.

Slides:



Advertisements
Similar presentations
Reporting Status or Progress. Define the Subject n Break the subject into areas of discussion n List the main subject components here.
Advertisements

Qualitative Iterative Development and Optimization Culinary Research Center.
Time Frame of Production
Welcome Assessing Your Activity Insight Implementation Kate Kaczmarczik, Client Relations Team Lead.
Project Wrap Up / Post Mortem
The Islamic University of Gaza
Text Chapters 1, 2. Sorting ä Sorting Problem: ä Input: A sequence of n numbers ä Output: A permutation (reordering) of the input sequence such that:
Slide 1 Requirements Wrap-up (Chapter 31 of requirements text) and Interaction Design: Introduction (Chapters 1 of Interaction Design text) CSSE 371 Software.
Lectures in Macroeconomics- Charles W. Upton Specialization in the Pizzeria.
> >
Inventory Control Subject to Known Demand
Chapter 1 Program Design
Lecture 8 Shelving in Superscalar Processors (Part 1)
Introduction Project Management Erol İnelmen Makro.
Chapter Lead Black Slide © 2001 Business & Information Systems 2/e.
Noise Assessment Brett Williams. Scope The measurement of the existing ambient noise (day and night time). A noise study of the future impact during construction.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
System Analysis & Design Introduction: System Analysis and design course intents to help students understand its importance in developing systems that.
Lead Black Slide Powered by DeSiaMore1. 2 Chapter 10 Business Operations.
PERFORMANCE ASSESSMENT FOR “ANALYTICS FOR HEALTHCARE PROFESSIONALS” COURSE.
Effective Complex Project Management
CPIS 357 Software Quality & Testing
Announcement – Career Fair Who: Everyone should plan to go… What: Meet / network with companies Meet hiring managers Get information first hand Where:3.
Vision Management Development Objective of the UnBoxed Incubator.
Project Life cycles BTEC National.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
Institute for Supply Management (ISM) Manufacturing Survey Published by: Institute for Supply Management Frequency: Monthly Period Covered: Prior Month.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Company Name Business Plan. Mission Statement Inspire Web Design is committed to providing high- quality Web design services, full support and maintenance.
Retention Radar Hackathon Summer 2015 Team: Finding the X Ritika ○ Abhinav ○ Seema ○ Sandeep ○ Aaron.
1/7/2004CSG - Project Delivery at UT Austin1 Making a Model Perform Adopting a methodology to your environment.
Prof. Roy Levow Session 10.  Inputs the Client Checkpoint  Questions to Be Answered During Client Checkpoint  Adjusting Functionality for the Next.
Presented by © Advanced Management Services, Inc Adaptive Project Framework A Common Sense Approach to Managing Complexity and Uncertainty Robert.
Exam Prep. Format  Multiple Choice (~50% of exam)  Short answers (~50% of exam)
CHAPTER 2 TYPES OF BUSINESS INFORMATION SYSTEM. INTRODUCTION Information System support business operations by processing data related to business operation.
Chapter 7 Section 7.2 Addition & Subtraction in Different Bases.
CSSE October.2008 Adaptive Project Framework Chapters 13 & 14.
Explorations in Economics Alan B. Krueger & David A. Anderson.
Developing a Project Management Standard for Your Organization Francine DiMicele, PMP June 08, 2015 NC Piedmont Triad Chapter.
COPYRIGHT TOM SULZER © 2015 IS 455 Oct 1, 2015 Agenda House Cleaning Quick Review Initiate Second Life Project Teams for Second Life Project are the teams.
CSSE October.2008 Adaptive Project Framework Chapters 13 & 14.
Teaching slides Chapter 1. Chapter 1: Introduction Introduction Components of a computer Building the software products What is software engineering?
CSSE October.2008 APF: Cycle plan and build Chapters 15 & 16.
 Supermarket Management System Team Phantom Panda.
Chapter 8-1 Chapter 8 Accounting Information Systems Information Technology Auditing Dr. Hisham madi.
INFO 638Lecture #91 Software Project Management Conclude Adaptive Project Framework INFO 638 Glenn Booker.
Copyright © 2007 by Saunders, Inc., an imprint of Elsevier Inc. Medical Practice Marketing and Customer Service Chapter 25.
Adaptive Project Framework
Field Study Proposal By Carl Rebman. Abstract n To develop a field study that helps to validate the theories set forth in the Hirschiem and Klien article.
Introduction to Systems Analysis and Design
IS Project Management Extreme Project Management
Chapter 07 – Rate, Ratio & Variation Q1
Chapter 5 Supply.
FUNdraiser in support of: FUNdraiser in support of:
Wednesday October 11th 2017 Wednesday October 11th 2017
6 Areas of Business Business 10 Weidmann.
مدل زنجیره ای در برنامه های سلامت
Initiative Governance Process Model
Design Specification Document
ETI 4448 Applied Project Management
EDLC(Embedded system Development Life Cycle ).
Chapter 5: Relations & Functions
Sections 1-3: Standard Section 4: Math
Evaluating Logarithms
Exponential and Logarithmic Forms
IS Project Management Extreme Project Management
Reporting Status or Progress
Data Analysis and Reporting
Chapter 2 The Design Process
Presentation transcript:

CSSE October.2008 APF wrap-up and xPM Chapter 17-19

Outline Client checkpoint Post-version review xPM

Client checkpoint

Inputs Questions What was planned? What was done? Is the version scope still valid? Is the team working as expected? What was learned?

Client checkpoint Adjust functionality of next cycle Inputs Outputs

PDQ (cntd): Their first client checkpoint: Pepe had the idea of “bake as you drive” Totally changed possible scope Changed possible requirements drastically Also had hired a market research study Made unbaked pizzas sound like a good idea Also suggested advertising and discount programs Redoing existing kitchens became a new objective

Post-version review

PDQ (concluded): What did they accomplish: After 12 months – Two pizza factories in full operation Four pizza vans in operation A centralized computer-based order entry system First production version of central ordering Automated inventory control & reordering They started Version 2 Improve on routing algorithm The client stayed closely involved

Variations in APF Proof-of-concept Embedding APF

COTD

xPM

INSPIRE INitiate SPeculate Incubate REview

CotD

Comparing methodologies

Questions?