Wrap Up What you should walk away with today Understanding of how skewed structures behave Understanding of how skewed structures behave When you should.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

Overview of New Practices & Policy Deck Issues. Topics Stakeholder Responsibilities Stakeholder Responsibilities Deflection Control Measures Deflection.
Understanding Skewed Bridge Behavior
Potential Solutions Goals for Design – What are we concerned about? –Primary Goal: Get the deck on successfully Stability during deck pour Stability during.
Analysis Methods for Skewed Structures
ODOT Structure Project Manager Seminar Concrete Decks
TOPIC : SYNTHESIS DESIGN FLOW Module 4.3 Verilog Synthesis.
Deliverable #8: Detailed Design - Overview due: Wednesday, 7 March All Deliverable materials are to be posted into Team Concert. Your to.
Deck Issues: Design Perspective.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Waterway Permits Update questions to:
Indistar: Updates, Additions, and Coming Soon Stephanie Benedict, ADI.
Create New feature Approved Change request Create User Stories for the feature Add User stories to Target Process backlog User Stories – 1.Create Story.
Professional Growth and Effectiveness System (PGES) Rubric The What, The Why, & The How March 2014 March 2014ISLN.
Polygons and the convex hull Prof. Noah Snavely CS1114
1 © University of Sunderland IMSE Lecture 4 u so far all our structure charts have been produced from an English description, e.g. - night on the town.
RAISING ASPIRATIONS Work Experience Programme 13 th – 17 th July 2015.
Updating indicator implementation in Indistar Assessment Step Plan/Tasks Step Monitoring Step Flag to Re-assess.
Indistar® Flag to Re-Assess. Flag to Re-assess Flag to Re-assess is a feature that will tag… indicators initially assessed as fully implemented, indicators.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Practicum/Placement Information - PRAC 2/FE 2 Semester Patricia Muncey – 7 April 2015.
LISD Learning Leaders April Campus/Department Design Teams O Please read the 2-page handout on Campus/Department Design Teams – either using the.
Principal’s Per Session Application Screen Shots
1 Building Mathematics Leadership Across Oregon Mark Freed Office of Educational Improvement and Innovation Oregon Department of Education.
0 Mining Methods Block 150 Level 330 Level 300 Level 270.
SWRK 3150 & 4120 Developing & Completing your Learning Contract.
Overview of New Practices & Policy Skewed Bridges.
Slide 1 FastFacts Feature Presentation November 18, 2015 To dial in, use this phone number and participant code… Phone number: Participant.
TYPES OF BEAMS. TYPES OF BEAMS Type of Beams Simply Supported Beam Overhanging Beam Cantilever Beam Statically Determinate beam Simply Supported Beam.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
Unit 5: Social Psychology EQ 1 : What is conformity? BR: Explain an instance in which you behaved in a certain way because everyone else did. Do you think.
Today’s text: Matthew 5:13 IMPACTING THOSE AROUND US.
Your Hospital’s Name Location Process Improvement: Name of your Improvement.
Professional Learning Communities AKA Purposeful Learning and Collaboration PLCs.
1 Electronic Invoice Processing. 2 We have change the way we process invoices. These changes have provided better efficiencies for handling and processing.
NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD E.T.& L. CORP.
Temperature Controller for Contact us : (091) (011) , for more :
Airtel Internet Leased Line Connection, MPLS VPN and PRI Line Service Providers in India - For more details contact.
Learning and remembering.
6 eCommerce Development Trends 2017
Contact Us.
6 Sales Leads: [INSERT PRODUCT NAME HERE]
Online 18--Preserving Concurrent Enrollment
Our District Wellness Policy: What School Staff Need to Know
Seismic Design Impact to
in problem.
SHERINE RAJ AP/CIVIL ENGINEERING DEPARTMENT OF SCD
Completed all three conditions n= 25
How To Add A Xerox Printer To Google Chrome
Frio River Cabins - Frio Vacation Homes - Frio Country Resort
Website: Contact No: ID:

'. \s\s I. '.. '... · \ \ \,, I.
Adult Circumcisions in Los Angeles -
Business English Announcements 10 minutes of Presentation teams
Chapter No. 04 Equilibrium
Optimization This entails further development and refinements to the design. These developments and refinements may be necessary to correct a problem or.
' '· \ ·' ,,,,
MARCH 2019 APRIL 2019 DOC TALK 6PM-7PM DOC TALK 6PM-7PM 1 2
What’s new in Bridges ABCD March 2019
Firebase Vs. MongoDB: Choose the Best Database of 2019
Your logo here.
For More Details:
Meet Us

Now Buy Best External Door Hardware from Doorhardware
Contact Us
Presentation transcript:

Wrap Up What you should walk away with today Understanding of how skewed structures behave Understanding of how skewed structures behave When you should be doing a refined analysis When you should be doing a refined analysis –Skewed structures (remember the flow chart) –Large deck overhang (at any skew)

Wrap Up What you should walk away with today Deck placement responsibilities Deck placement responsibilities Large deck overhangs are BAD Large deck overhangs are BAD Stiffer beams for high skewed structures are GOOD Stiffer beams for high skewed structures are GOOD

Wrap Up What you should do with this information CMS changes for deck pours will become effective in April, 2007 CMS changes for deck pours will become effective in April, 2007 –Projects sold after May 1, 2007 will include these changes in SS 800

Wrap Up What you should do with this information If at preliminary stage of bridge design If at preliminary stage of bridge design –Implement what you heard today

Wrap Up What you should do with this information Large Deck Cantilevers – if in detail design Large Deck Cantilevers – if in detail design –Look at your design and see if changes are necessary –Contact your ODOT PM if you believe changes are necessary. –OSE will work with the Districts on case by case

Wrap Up What you should do with this information Large skews –Current BDM directs designers to contact OSE when certain criteria are met. If this was done, continue with the direction that you were given. If this was done, continue with the direction that you were given. –If in detail design and had not contacted OSE or District Review your design Review your design Contact ODOT PM if changes are necessary Contact ODOT PM if changes are necessary OSE will work with Districts on case by case OSE will work with Districts on case by case

Wrap Up What you should do with this information Intermediate Crossframes Do Not use slotted holes at connections Do Not use slotted holes at connections Fully connect intermediate crossframes prior to deck placement. Fully connect intermediate crossframes prior to deck placement.

Wrap Up QUESTIONS ? questions to: