Back Country Structure Protection 2000. Overview Kits put together in 98 and used during the 98 and 00 fire seasons. Trial and error in supplying them.

Slides:



Advertisements
Similar presentations
Report # Downed powerline inhibits fire attack. Report Number: Report Date: 11/13/ :35.
Advertisements

Take Ladder Safety One Rung at a Time
Lion Wildland Fire Background The Lion Fire was ignited by lightning on July 8, 2011 in the Golden Trout Wilderness on the Western Divide Ranger District,
CVFD Training – Ladder Practices
CLOW WATER Contractor Orientation April
Aircraft Strategy &Tactics Terminology Parts of Fire Basic Tactics Drop Patterns Example Review Ten Principles of Retardant Application By Steve Hubbard.
§ – Subpart L Oklahoma State University2.
Wildland Firefighter Safety Prepared By: Kelley Jensen.
Assessing a Downed Firefighter
Point Protection in Alaska “cabin protection”. What is point protection? Protection of a site threatened by a fire. A site can be: – A single structure.
Matt Petrie KEPA 119 4/16/09. If there is a situation where a shelter is going to be needed then it should be one of first things to taken care of. People.
Safety Briefing By C/CMSgt William Pruitt. Safety for personnel Long pants are required All obstacles will have safety guides in case of emergency. It’s.
North Idaho Emergency Services Academy. Objectives Types of fire service laddersTypes of fire service ladders Ladder termsLadder terms Ladder raising.
SLAUGHTER GULCH FIRE July 23, REPRESENTATIVE FUELS.
B M O C Navigation Overview By Monica Spicker 2010.
How to Build a Wilderness Shelter Tiffany Keith Eng 334 Professor Manthey March 22, 2009.
SILVER TRAINING SURVIVAL DUKE OF EDINBURGH HILLARY AWARD.
Training On Demand. Purpose To provide fire fighters at an emergency incident a team with pre-assigned duties aimed at rescuing downed, lost or trapped.
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
Fall Protection and Ladder Safety Training. Course Outline  Introduction  Fall Protection  Ladder Safety  Wrap-up.
Campsite Selection OP 110. The Low-Impact Campsite 1. Established campsites vs. pristine campsites. Consider the following: a) Selecting a campsite that.
Ms. Gripshover Landscaping Unit 16. » Identify the different methods of harvesting plant materials used by the nursery » trade. » Prepare for planting.
PowerPoint ® Presentation Chapter 3 Site Surveys and Preplanning Preliminary Assessment Safety Site Surveys Preparing Proposals Installation Planning.
Railroad Safety For the Fire Investigator and Firefighter.
By Catherine Fontenot LTEC /29/ Preparations for your tree Preparations for your tree The tools you will need for the job The tools you.
OSHA’s Fall Prevention Campaign
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Slide 4-1 Task Force/Strike Team LeaderS-330 Unit 4 – Post Engagement.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
O-2017 Minnesota Wing Aircrew Training: O-2017 Survival and Urgent Care.
Mountain Shadows June 23, 2012 WILDFIRE HAZARDS IN LOST PARK RANCH.
Wildfire Emergency Medical Services. Ojectives EMS roles during wildland incidents Types of injuries Wildland Terminology Fire Shelters.
United States Air Force: Survival Objective: Know how to survive in situations where your safety and life depends on your decisions. Know the three basic.
WILDERNESS SURVIVAL.
PSU’s Finest Zero Energy Home Andrew Timmons, Josh Temple, Kurtis Myhre, Steven Fischer 1.
Unit 11 – Standards for Survival. Standards for survival Wildland firefighters have too many reminders of those who have passed before them who have not.
Hayman - Waldo- Black Forest Has anything changed? Hayman June 17, 2002.
MODULE 4: WATER SUPPLY AND EXPOSURE PROTECTION. OBJECTIVES Module 4 Overview Identify the principles of water supply and tactics for establishing water.
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT Four UNIT Five Project UNIT Six Preview Project Status Summary.
SIZE-UP The systematic process consisting of the rapid, yet deliberate, consideration of all critical fire ground factors that leads to the development.
Fire Reporting & Initial Attack (IA) Scenarios Imagine you’re the engineer on the fire train with the person sitting next to you as your crew. Take a radio.
Fire Orders & Watch Out Situations. Fireline Safety  Objectives Identify the hazards & risks of being a Wildland Firefighter Discuss safe practices.
A positive state of mind is the key to survival in an outdoor emergency.positive state of mind is the key to survival.
North Vancouver City Fire Department Firefighter Down! R.I.T. Rope Rescue The Big ‘W’ ‘Dirty Rescue’
OBJECTIVES Overview DNR aviation program. Overview DNR aviation program. Review of the Easy Street Fire bucket incident. Review of the Easy Street Fire.
COA Development Steps Analyze available forces.
Scalar – a quantity with magnitude only Speed: “55 miles per hour” Temperature: “22 degrees Celsius” Vector – a quantity with magnitude and direction.
MODULE 4: WATER SUPPLY AND EXPOSURE PROTECTION. OBJECTIVES Module 4 Identify the principles of water supply and tactics for establishing water supplies.
SAP STOP ASSESS PLAN. Stop, Assess Plan is one the most important maxims of the Auxiliary, that is designed to keep our own personnel and vessels safe,
Shelters. Considerations for Shelter ► There is no “right way”  Using materials that are available ► Terms describing most basic shelters:  A Frame-
Site Selection The following are photographs of the sites from which you may choose your water samples. After reviewing the photos, you will use the map.
Unit 9 – Scouting and Patrolling, and Communicating.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Florida Operations Level Hazardous Materials Training Unit 3.2 Command and Safety.
New Mexico WUI Summit 2016 New Mexico WUI Summit, Concurrent Session #1, Incident Response Tract. Question: Does Defensible Space Improve the Likelihood.
Size-up and Damage Assessment Key Points in the morning session: ◘Use Size-up and Damage Assessment for CORE Team safety ◘Seven steps of Size-up ◘How to.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
First To Arrive Duties Training Union County SOG 3.12.
Learning for Water wehelptwo.com
Inspection Davenport IA
Site Safety.
Shelters. A positive state of mind is the key to survival in an outdoor emergency.
building & strengthening disaster readiness among neighbors
and how to protect yourself
§ SUBPART L SCAFFOLDS 1.
Cross a Contaminated Area
Applications and Models
Terminal Learning Objective
Terminal Learning Objective
Presentation transcript:

Back Country Structure Protection 2000

Overview Kits put together in 98 and used during the 98 and 00 fire seasons. Trial and error in supplying them with necessary equipment. This is a critical element as getting supplies once you are there is very difficult. Four cabins and a lookout were wrapped this season.

Black Bear Cabin Black Bear is a two story cabin on a cement foundation which has a root cellar/basement. This cabin is the main entry point administrative site for the Lower South Fork. The site receives almost constant use in summer months, and is also a key contact point for members of the public. The cabin is 7.5 air miles, or 14 miles by trail south of Meadow Cr. Trailhead. This site is one of the top priorities for protection

Helen Creek Fire Started by lightning on July 23. Discovered on July 26, size was a spot. Preparedness level 5 nationally. Personnel and equipment dispatched August 16 to implement structure protection measures. Fire was approximately a half-mile away from the cabin.

Equipment Delivery August 17 aircraft and mule train delivered equipment. Aircraft delayed due to inversion. All equipment arrived at approximately 1400 hrs.

Fire Situation Fire was approximately 400 yards away. Wind was blowing out of the south, directly at the cabin. Work was started under urgent conditions as embers and ash were falling on and near the cabin.

Implementation A large amount of time was required to move para-cargo from the airstrip to the cabin. Group split up with part taking care of a water system, the rest applying shelter material to the roof.

The Water System Required two Mark III Pumps. One pump took care of the pack bridge while the other had the cabin. The system had both sprinklers and laterals for suppression.

Wrapping the Roof Started on the West side anchoring to the hitching rail. Applied material parallel to the peak of the roof. Only two at a time on the roof. This process was difficult and hard on crewmembers

Wrapping the Roof East side roof required some improvising in finding and anchor. Went perpendicular to the peak of the roof. This was a much easier method. Used rock climbing techniques to make this easier.

The North Face We were able to reach everything with the ladder. Used rocks and duct tape to seal from top to bottom. There is a fuel problem on this side.

The South Face Could not get this whole face covered. The dugout to the cellar was angled and too deep for the ladder. A sprinkler was tacked just below the window for protection.

Keys to the Black Bear Operation: Overlap is necessary. Lots of Duct tape is required to seal edges and patch holes. Rocks may be necessary for the bottom seal. The roof is the limiting factor. Time, approximately 300 person hours were required to complete this mission.

Mud Lake Look-Out Threatened by the Lewis 2 Fire. Wrapped more than once because of wind. Fire ran at this lookout from all sides. Difficult to wrap because of limited material and awkward construction.

Fire near the lookout Evidence of fire on the ridge-top. The lookout has a cedar-shake roof construction. Small spots are visible on all sides.

Wrapping saved the Lookout

Hahn Cabin Threatened by the Monture-Spread Fire. Logistics associated with this specific operation were made more difficult by location. Basin and Danaher cabins were also threatened by this fire and wrapped.

What does this cost? One roll of material costs $ person hours equals about $4500. Air delivery equals $1530. Pack train delivery equals about $1000. Implementation at Black Bear alone cost $ This does not include time required to pack the equipment before delivery.

Is it worth it? Administrative and Historical values are not calculable. Replacement costs are well in excess of $300,000 for Black Bear Cabin and the Suspension Pack Bridge alone. Once destroyed, they probably will not be replaced.

Improvements and Needs Proper equipment is needed for an efficient operation (i.e. staple guns, staples, ladder, sprinklers). A formal briefing based on what was learned this season will benefit future operations. Research into approved rope for personnel and training required, if any, to climb cabin roofs.

Improvements and Needs (cont.) Continued fuel reduction will increase the survivability of structures when threatened by fire. Continued fire training of backcountry personnel. Including good maps into the kit when it is ordered. Qualified fire personnel to monitor fire behavior and relay good information to fire managers on fire status.

Considerations Before Implementation This operation takes a lot of effort. Back Country Logistics; be prepared because you can not run to K-mart to pick up something you forgot. Cost; it costs about $10,000 just to put the material on. The Safety Factor. The implementation requires a lot of attention in assuring a safe operation, but the fire environment needs to be constantly monitored as well. Remember, this is a fire assignment.