Mercury Intense Target (MERIT) Update Status of the Target System Design P.T. Spampinato V.B. Graves T.A. Gabriel Muon Collaboration Friday Meeting October.

Slides:



Advertisements
Similar presentations
A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
Advertisements

MERIT Hg System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Review Meeting Brookhaven National Laboratory Dec 12, 2005.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Titan-izing the Target Module V.B. Graves 16 Dec 2005.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
Hg System Design V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
High Power Hg Target Conceptual Design Review Hg Target System Cost Estimate V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
CERN Hg Jet System V.B. Graves P.T. Spampinato T.A. Gabriel MUON Collaboration Meeting Lawrence Berkeley National Laboratory February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Mercury Nozzle Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
High Power Hg Target Conceptual Design Review Hg Target Design P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Muon Collider-Neutrino Factory Collaboration.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT Hg System Final Design Review Hg Target System Design V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science & Fusion.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Hg System Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting October 20, 2006.
Mercury Catcher Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Hg Target Interface with Solenoid V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Hg System Decommissioning V.B. Graves P.T. Spampinato CERN Feb 7-8, 2008.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Target System Operations and Hg Handling P.T. Spampinato V.B. Graves MERIT Hg System Safety Review CERN June 19-20, 2006.
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
MERIT Hg System Final Design Review Hg Target System Operations V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science.
Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
N UCLEAR S CIENCE AND T ECHNOLOGY D IVISION O AK R IDGE N ATIONAL L ABORATORY U.S. D EPARTMENT OF E NERGY Issues Dealing With Safe Handling of Mercury.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
CERN High Power Target Hg Jet Experiment - nTOF11 Facility & Safety Meeting V.B. Graves P.T. Spampinato T.A. Gabriel CERN March 15-17, 2005.
NOvA APD Cooling Water Update William Gilbert University of Minnesota.
1 Optical Diagnostic Results of MERIT Experiment and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Report to MUTAC LBNL April 25, 2005.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
Harold G. Kirk Brookhaven National Laboratory Targetry Program Collaboration Meeting Columbia University June 11, 2003.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Multiple Module Vacuum Oven Productivity Enhancement System.
Hg System Decommissioning Activities
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Mercury Intense Target (MERIT) Update Status of the Target System Design P.T. Spampinato V.B. Graves T.A. Gabriel Muon Collaboration Friday Meeting October 28, 2005

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Muon Collaboration Friday Mtg. Oct. 28, 2005 Design Review in July for Syringe; Design Review in Oct. for Remainder of Equipment Cutaway view of the target and solenoid Cutaway view of the target system

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 3 Muon Collaboration Friday Mtg. Oct. 28, 2005 Design Approach – Two Design Packages to Expedite Procurement (1) Syringe Pump  Syringe pump design replaced the original centrifugal pump due to the high pressure requirement for the system to deliver a 20 m/s jet  Two hydraulic cylinders drive a Hg cylinder  Stainless vs carbon steel cylinders  Procurement underway thru BNL and the vendor chosen (kickoff meeting with Airline Corp. today! (2) Target Delivery System  Consists of primary and secondary containments, supports, sump tank, instruments, filtered vent, supply line, laser optic windows, and beam windows  Procurement in November using BNL procurement process

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 4 Muon Collaboration Friday Mtg. Oct. 28, 2005 Overall Plan  Pump equipment and target delivery system are designed at ORNL  Funding is provided for design, assembly, and testing  Procure all hardware thru BNL (except for misc. items)  Assemble equipment and test the system at ORNL/TTF  Characterize operating parameters of the target equipment and the laser diagnostic (pictures of Hg jet)  Ship the target to MIT along with auxiliary equipment, and support base structure  Integrated system tests at MIT (w/ solenoid)  Characterize operating parameters in the magnetic field environment (pictures of Hg jet in high field)  Fit up test of solenoid/target equipment on base support structure  Ship back to ORNL (NEW - assess sending solenoid to ORNL for subsequent shipping to CERN)  Ship system to CERN along with all support equipment  Beam-on-target tests at CERN  Proof-of-principal tests in TT2A tunnel, store, decon, pack, and  Ship mildly activated equipment plus Hg back to ORNL

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 5 Muon Collaboration Friday Mtg. Oct. 28, 2005 Hg Delivery System  Capacity 23 liters Hg (~760 lbs)  Provide 1-cm dia., 20 m/s jet for up to 12 sec  Secondary containment size 960mm x 1475mm x 960mm  Estimated weight 2 tons incl. Hg

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 6 Muon Collaboration Friday Mtg. Oct. 28, 2005 Primary Containment  Hg supply flow path  1-inch Sch 40 pipe  1-inch flex metal hose w/sanitary fittings  1-inch, wall rigid tubing  5-inch diameter plenum  12-mm dia., 1-mm wall rigid tubing  Hg jet return path  1/4-inch plate weldment chamber  6-inch to 2-1/2 inch eccentric reducer  2-1/2 inch flex metal hose w/sanitary fittings  sump tank

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 7 Muon Collaboration Friday Mtg. Oct. 28, 2005 Reqmts and Operating Conditions:  1-cm diameter jet at 20 m/s delivered every 30 minutes  >1-sec steady state jet during the magnet peak field  Full-beam interaction length is 30-cm  24 GeV, 1 MW proton beam, <20x10 12 ppp  Beam line is 120-cm (47.2”) above the tunnel floor  Up to 100 pulses for the CERN test, >500 operating cycles for system testing  The pump equipment operates in a range of 6000 Gauss to 300 Gauss (1 Tesla = 10 4 Gauss) Target system must deliver a stable, unconstrained jet of Hg in 1-atmosphere of air, into 15 Tesla field (Vacuum Is Under Review)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 8 Muon Collaboration Friday Mtg. Oct. 28, 2005 Magnetic Field Profile  15 Tesla peak field has a 1-sec flat top at t = 9.5 s Peak Field Stray field profile

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 9 Muon Collaboration Friday Mtg. Oct. 28, 2005 Magnetic Force Analysis  Peter Titus performed ANSYS analysis of attractive forces between magnet and single iron cylinder  Force nearly 13000lb  Further analysis showed force decreases significantly with separation distance > 1m  Outcome: Syringe system is stainless steel!

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 10 Muon Collaboration Friday Mtg. Oct. 28, 2005 Geometry of the Interaction Region  0.4° horizontal kick  Jet to beam is 33 millirad (1.89°); jet to magnetic axis is 100 millirad (5.73°)  The PB crosses the jet centerline at Z=0, which is also at 15 T in the center of the solenoid

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 11 Muon Collaboration Friday Mtg. Oct. 28, 2005 Containment Schematic

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 12 Muon Collaboration Friday Mtg. Oct. 28, 2005 Optical Components – Target Interfaces Are Defined  BNL provides splitters, prisms, lenses, bracket, mounting hardware & adjustment mechanisms  Rad tolerant fused silica cable is being tested at CERN

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 13 Muon Collaboration Friday Mtg. Oct. 28, 2005 Z=0 Section Cut

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 14 Muon Collaboration Friday Mtg. Oct. 28, 2005 Hg Loading/Unloading Under Study  A glove box could be required for unloading Hg at the completion of testing if refilling flasks is not permitted outside of the secondary containment  Consider use of snorkel near flasks in lieu of glove box  Develop list of activated Hg byproducts and determine effectiveness of filtration

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 15 Muon Collaboration Friday Mtg. Oct. 28, 2005 Preliminary Estimate For Filter Lifetime is Calculated Saturation Concentration  Flow Rate 110 cfm  Temp C  Filter Effic. 99.0% Saturation Pressure Ref. Quechsilber und seine Gefahren, Swiss government worker safety report, SBA No. 145, Luzern  Filter Weight 6 lbs  Filter Satur. 12%  Filter Life 185 hrs  Does not incl. reduction for humidity Filter effectiveness tests could be done at ORNL

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 16 Muon Collaboration Friday Mtg. Oct. 28, 2005 MARS15 Simulations at FNAL are Underway to Assess Activation of the Target System  Preliminary results indicate that activation levels are not a problem for electronics, instruments, or materials per Sergei Striganov

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 17 Muon Collaboration Friday Mtg. Oct. 28, 2005 CERN Tunnel Layout TT10 TT2 TT2A ISR (Control Room Location) MERIT Hyd Pump & Controls in TT2

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 18 Muon Collaboration Friday Mtg. Oct. 28, 2005 Power Requirements  Hydraulic pump – 380/460VAC, 50-60Hz, 60A (power connection at CERN)  Proportional control valve – 24VDC  Heater foil – 120VAC  Hg vapor monitors – 120VAC  Instruments – 24VDC

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 19 Muon Collaboration Friday Mtg. Oct. 28, 2005 Instrumentation & Sensors Controlled Components Hydraulic pump Proportional control valve* Heater foil Analog Sensor Inputs Hg discharge pressure Hg level Hg sump thermocouple Secondary containment thermocouple Cylinder 1 position* Cylinder 2 position Hg vapor 1Hg vapor 2 Hydraulic fluid high pressure Hydraulic fluid low pressure Beam window 1 pressure* Beam window 2 pressure* Digital Sensor Inputs Hydraulic filter dirty switch Hydraulic low level switch Conductivity probe * Critical for system operation or safety

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 20 Muon Collaboration Friday Mtg. Oct. 28, 2005 LabView®-Based Control System  Remote control over long distance limited choices  Analog I/O modules need to be close to equipment and power supplies  LabView controller on laptop computer was chosen  National Instruments recommends Compact PCI I/O modules  Communicates to laptop via EtherNet cable  Allows custom operator interface, data logging if required during development  Should allow straightforward integration with other control systems  Control system development to begin late October

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 21 Muon Collaboration Friday Mtg. Oct. 28, 2005 Miscellaneous Equipment For The Target System Large Items Small Items Vacuum Cleaner– Dry Merc -X Cleaning Solution Snorkel Sponges 2 Vapor Monitors Plastic Buckets Spare Filters (qty. TBD) Plastic Pans Glove Box ?Gauze– roll VacuumPump ? Small Tools Vinyl Tape Herculite Plastic Bags– asst’d (1 gal.– 20 gal.) 1-liter plastic bottles Lab Coats /Shoe Covers Tyvek Hooded Suits Nitrile Gloves Full Face Mask/Respirator Cartridges

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 22 Muon Collaboration Friday Mtg. Oct. 28, 2005 Project Schedule  Assemble syringe pump and target hardware May-Jun 2006  Target system tests at ORNL Jul-Aug 2006  Integrated system tests at MIT Sep-Oct 2006  Beam-on-target experiment at CERN Mar-Apr 2007

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 23 Muon Collaboration Friday Mtg. Oct. 28, 2005 Alternative Configurations for Nozzle/Plenum Are Under Consideration  Attaching plenum from up- beam end requires smaller diameter plenum  Rigid supply tubing must bend towards center to accommodate flange bolt circle  Non-plenum tubing requires Hg flow to bend away from center (adds 4 bends before 180-deg turn)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 24 Muon Collaboration Friday Mtg. Oct. 28, 2005 Removable Plenum Concept  Adding exterior bolts reduces plenum ID  Beam tube positioning will be a problem  Plenum wall thicknesses may not be representative

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 25 Muon Collaboration Friday Mtg. Oct. 28, 2005 Conclusions  Procurement for the Hg delivery system has slipped approx. 1 month  Not a problem; sufficient slack in schedule  Syringe pump system contract was awarded thru BNL – vendor design review in 30 days  Hg Delivery system procurement package will be sent to BNL before end of November  Target system is on schedule to meet April 2007 testing at CERN