O. Beltramello – 14.06.2012. A brief reminder of the project status : Phase1 (July 2011 – March 2012): Development of several system prototypes: - test.

Slides:



Advertisements
Similar presentations
Design, prototyping and construction
Advertisements

HWg-Juno HW group is a manufacturer of IP-based sensors from Prague, Czech republic. HWg delivers remote monitoring & control solutions.
Rice Cooker Project Integration Phase Integration of Hardware and Software.
A Natural Interactive Game By Zak Wilson. Background This project was my second year group project at University and I have chosen it to present as it.
CERN, Geneve 14 Jun WPSS-PHASE 2 WPSS PH-2 Scheduling.
MECHANICAL DESIGNS. What is mechanical design? All the mechanical hardware used in the machine is called mechanical design. Precision machines are essential.
AFC engineering group meeting on the 26 th of Jan 2004 MICE Absorber Focus Coil work schedule for the next 6 months By Wing Lau, Oxford.
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Status of Napoli scanning laboratory OPERA Emulsion Workshop, Nagoya, 7/12/2006 F. Di Capua on behalf of Napoli group.
Development and Human Factors Analysis of Neuronavigation vs. Augmented Reality A. Pandya 1,2, M.R. Siadat 3, G. Auner 1,2, M. Kalash 1, R.D. Ellis 2
O. Beltramello – Why a Safety Upgrade Program ? As a result of the intensive ATLAS Detector Upgrade Program and the increase of the performance.
Review of the test results and plan for the final TC ESR 5 ELENI ADAMIDI IASA, NTUA SUPERVISOR: PROF.EVANGELOS GAZIS WORK PACKAGE 3: SAFETY SYSTEM MODULARITY.
Review of the test results and plan for the final testing campaign Panagiotis Mousouliotis EDUSAFE ESR3 PhD Candidate, Aristotle University of Thessaloniki.
Augmented Reality and 3D modelling Done by Stafford Joemat Supervised by Mr James Connan and Mr Mehrdad Ghaziasgar.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Marker-Based Augmented Reality
O. Beltramello. Who are we ? A Collaboration of 12 Partners EDUSAFE FP7 Marie Curie ITN Project 3.2 MEuros, 4 years program (started in Sept. 2012) CERN.
RoboTeam 9/1/2011 Preformed by:Costia Parfeniev, Boris Pinzur Supervised by: Kobi Kohai.
Austin Friars Environmental Enhancements Briefing Session.
ESR 9: Review of test results and plan for the final testing campaign 1/24 EDUSAFE Summer School, 22 nd June 2015 Yuta Itoh (TU Munich)
EDUSAFE System Exploitation next steps Assoc. Professor Katerina Pramatari Vasileios Mantzios (ESR10) Athens University of Economics and Business (AUEB)
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Using digital images in Arts research and teaching Birgit Plietzsch bp10 Phone: ext
BE-BI camera projects HS, SB, EB March outline New digital cameras New rad-hard cameras (vidicon replacement)
Wii CARE James Augustin Benjamin Cole Daniel Hammer Trenton J. Johnson Ricardo Martinez.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WPSS Phase 2 – CERN 14/ PTU Phase 2 Specifications and hardware designs Use Cases PTU Architecture Hardware Designs Enclosure Integration Process.
Video Eyewear for Augmented Reality Presenter: Manjul Sharma Supervisor: Paul Calder.
EDUSAFE IDEASQUARE O. Beltramello – In this context, we are performing the Marie Curie Initial Training Network Program EDUSAFE ME.
Compressor status AWAKE Technical Board meeting 19 August 2015.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
International Telecommunication Union Committed to connecting the world ITU/EBU Workshop Accessibility to Broadcasting and IPTV ACCESS for ALL, 23 – 24.
Augmented Reality Authorized By: Miss.Trupti Pardeshi. NDMVP, Comp Dept. Augmented Reality 1/ 23.
February Testing Campaign Summary. Disclaimer This presentation is based on the reports of the testing campaign and focuses on the problems arisen during.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
VIEWNG SYSTEMS There are two ‘viewing systems’ that we use to visually interpret the world around us. What do you think the two ‘viewing systems’ are?
Review of superconductors and magnet laboratories Summary of measurements and instrumentation issues
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Augmented Reality and 3D modelling Done by Stafford Joemat Supervised by Mr James Connan.
Edusafe Summer School G. Aielli (on behalf of O. Beltramello) 22 June 2015 Ideasquare, CERN Edusafe Summer School 22 – 26 June 2015.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
TBTS Test Program & Schedule G. Riddone
“Mobile Mixed Reality System (MOMIRAS)” Contract (ΓΓΕΤ): ISR-3215 Kick off meeting Intracom, Athens 29 th July 2014 Welcome & Status Artur Krukowski (ICOM)
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
Tamás Matuszka Kickoff Meeting (December 26th, 2015)
WPO – ITN management & HR Seamus Hegarty HR-RPM 12-month review,
Augmented Reality and 3D modelling Done by Stafford Joemat Supervised by Mr James Connan and Mehrdad Ghaziasgar.
1857 Standards Progress IEEE 1857 Working Group May 17, 2015.
Automatic Test Equipment Development with C-ON Seo Dong Gon Yonsei University.
CERN Ideasquare INTRODUCTION Presenter name June 27, 2015.
EDUSAFE FINAL CONFERENCE June, 2016
Control System (CS) and Data Acquisition (DAQ) architecture for the radiation background monitoring of a Personnel Safety System in the ATLAS cavern. Adamidi.
WP2 – Testing campaign and beyond
Task T HTS Dipole Magnet Design and Construction
Complementary ISTC Projects #3888, 3889p
Electrical and electronic systems projects
10/month is the present production rate 2 FTE + sporadic contributions
A WRM-based Application
Technology Convergence
Teleconference ACS – FREIA 19th June 2017
March 17 – Comp Gov Agenda: Country Briefs Perspectives
UPPSALA UNIVERSITY_GERSEMI PROJECT
Calendar Overview – Phase II – REVISED April 2019
Presentation transcript:

O. Beltramello –

A brief reminder of the project status : Phase1 (July 2011 – March 2012): Development of several system prototypes: - test a selection of non compressed (for AR) and compressed camera (for supervision), development of HW and SW (Novocaptis) - test a selection of audio systems, development of HW and SW (Novocaptis) - design a helmet enclosure for the camera and leds (Novocaptis) - PTU design compatible for the various audio systems and cameras (Prisma) - development of protocol to read the zigbee data from Mirion DMC2000 dosimeters (Prisma) - DAQ for audio/video/ sensors (Novocaptis, Prisma, CERN) - control system (CERN) - Procedure Visualizer software (Protvino, CERN) Done In progress Done In progress Done

Phase2 (May 2012 – December 2012): We need a supervision system operational and robust for LS1, Nov. 2012, maintenance period, 15 months of shutdown. We stage for few months the research about Augmented Reality. It will be resumed through the successfull ITN EDUSAFE project (probable kick off automn 2012): Collaboration: EPFL, INFN Roma 2, CERN, National Technical University Athens, Novocaptis, Prisma, Areva, DUTH, AUTH, TUM All what is developed during the second phase has to be compatible with the future ITN project. Main Responsibilities Phase 2: - Prisma - PTU + sensors HW and SW and DAQ system, dosimeter protocol - Novocaptis – Audio / video system HW and SW and DAQ system - CERN - detail design/ manufacturing drawings for helmet enclosure, helmet enclosure procurement, control system, head mounted display procurement