Standard Costs and Variances
Advertisements

Standard Costs Predetermined. Used for planning labor, material and overhead requirements. Benchmarks for measuring performance. Used to simplify the accounting.
11th Edition Chapter 10.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Standard Costing and Variances
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Standard Costs and the Balanced Scorecard
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Standard Costs and the Balanced Scorecard Chapter Ten.
Standard Costs 11/16/04 Chapter 10. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for.
Standard Costs Pertemuan 7. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for planning.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Standard Costs and Variance Analysis Chapter Ten & Eleven.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Direct Cost Variance and Management Control
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Standard Costs and Operating Performance Measures
Standard Costs and Operating Performance Measures.
Fundamentals of Accounting II
Financial and Managerial Accounting
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 14 Professor Jeff Yu.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Standard Costs and Operating Performance Measures
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
© 2010 The McGraw-Hill Companies, Inc. Standard Costs and Operating Performance Measures Chapter 11.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Standard Costs.
Copyright © 2012 McGraw-Hill Ryerson Limited 10-1 PowerPoint Author: Robert G. Ducharme, MAcc, CA University of Waterloo, School of Accounting and Finance.
Variance Analysis Topic Six by Dr. Ong Tze San
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Chapter 9 Standard Costs PowerPoint Authors: Jon A. Booker, Ph.D., CPA, CIA Charles W. Caldwell, D.B.A., CMA Susan Coomer Galbreath, Ph.D., CPA Copyright.
Standard Costing and Analysis of Direct Costs CHAPTER 10 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
© 2012 McGraw-Hill Education (Asia) Garrison, Noreen, Brewer, Cheng & Yuen Standard Costs and Operating Performance Measures Chapter 12.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
ACC3200 STANDARD COSTING.
9-1 Standard Costs Standards are benchmarks or “norms” for measuring performance. In managerial accounting, two types of standards are commonly used.
Chapter 10 Standard Costs and the Balanced Scorecard.
Hanson Inc. has the following direct material standard to manufacture one Zippy: 1.5 pounds per Zippy at $4.00 per pound Last week 1,700 pounds of material.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Standard Costs and Variances
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Direct Cost Variance and Management Control Lecture 17 1 Readings Chapter 10,Cost Accounting, Managerial Emphasis, 14 th edition by Horengren Chapter 5,
Chapter 8 © The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Standard Costs.
9-1 Standard Costing: A Functional-Based Control Approach 9.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Ten Standard Costs and the Balanced Scorecard.
8-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Standard Costs and the Balanced Scorecard
Standard Costs and the Balanced Scorecard
Standard Costs and Variances
Standard Costs and Variances
Pertemuan 7 Standard Costs.
Standard Cost Chapter Eleven
Standard Costs and Variances
Standard Costs and the Balanced Scorecard
Standard Cost Chapter Ten
Standard Costs and the Balanced Scorecard
Topic Six by Dr. Ong Tze San
Standard Costs and the Balanced Scorecard
Chapter 8 Standard Costs Chapter 8: Standard Costs.
Standard Costs and Variances
Standard Cost Chapter Eleven
Standard Costs and the Balanced Scorecard
Standard Costs and the Balanced Scorecard
Standard Costs and the Balanced Scorecard
Presentation transcript:

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Standard Costs and the Balanced Scorecard

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 10-2 Standard Costs Standards are benchmarks or “norms” for measuring performance. Two types of standards are commonly used. Quantity standards specify how much of an input should be used to make a product or provide a service. Cost (price) standards specify how much should be paid for each unit of the input.

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 10-3 Standard Cost Card – Variable Production Cost A standard cost card for one unit of product might look like this:

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 10-4 Are standards the same as budgets? A budget is set for total costs. Standards vs. Budgets A standard is a per unit cost. Standards are often used when preparing budgets.

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 10-5 Price and Quantity Standards Price and and quantity standards are determined separately for two reasons:  The purchasing manager is responsible for raw material purchase prices and the production manager is responsible for the quantity of raw material used.  The buying and using activities occur at different times. Raw material purchases may be held in inventory for a period of time before being used in production.

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 10-6 A General Model for Variance Analysis Variance Analysis Price Variance Difference between actual price and standard price Quantity Variance Difference between actual quantity and standard quantity

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 10-7 Variance Analysis Price VarianceQuantity Variance Materials price variance Labor rate variance VOH spending variance Materials quantity variance Labor efficiency variance VOH efficiency variance A General Model for Variance Analysis

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 10-8 Price VarianceQuantity Variance Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price A General Model for Variance Analysis

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 10-9 Price VarianceQuantity Variance Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price A General Model for Variance Analysis Actual quantity is the amount of direct materials, direct labor, and variable manufacturing overhead actually used.

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Price VarianceQuantity Variance Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price A General Model for Variance Analysis Standard quantity is the standard quantity allowed for the actual output of the period.

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Price VarianceQuantity Variance Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price A General Model for Variance Analysis Actual price is the amount actually paid for the input used.

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin A General Model for Variance Analysis Standard price is the amount that should have been paid for the input used. Price VarianceQuantity Variance Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin A General Model for Variance Analysis (AQ × AP) – (AQ × SP) (AQ × SP) – (SQ × SP) AQ = Actual Quantity SP = Standard Price AP = Actual Price SQ = Standard Quantity Price VarianceQuantity Variance Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Learning Objective 2 Compute the direct materials price and quantity variances and explain their significance.

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Glacier Peak Outfitters has the following direct material standard for the fiberfill in its mountain parka. 0.1 kg. of fiberfill per parka at $5.00 per kg. Last month 210 kgs of fiberfill were purchased and used to make 2,000 parkas. The material cost a total of $1,029. Material Variances Example

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin kgs. 210 kgs. 200 kgs. × × × $4.90 per kg. $5.00 per kg. $5.00 per kg. = $1,029 = $1,050 = $1,000 Price variance $21 favorable Quantity variance $50 unfavorable Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price Material Variances Summary

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin kgs. 210 kgs. 200 kgs. × × × $4.90 per kg. $5.00 per kg. $5.00 per kg. = $1,029 = $1,050 = $1,000 Price variance $21 favorable Quantity variance $50 unfavorable Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price $1,029  210 kgs = $4.90 per kg Material Variances Summary

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin kgs. 210 kgs. 200 kgs. × × × $4.90 per kg. $5.00 per kg. $5.00 per kg. = $1,029 = $1,050 = $1,000 Price variance $21 favorable Quantity variance $50 unfavorable Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price 0.1 kg per parka  2,000 parkas = 200 kgs Material Variances Summary

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Material Variances: Using the Factored Equations Materials price variance MPV = AQ (AP - SP) = 210 kgs ($4.90/kg - $5.00/kg) = 210 kgs (-$0.10/kg) = $21 F Materials quantity variance MQV = SP (AQ - SQ) = $5.00/kg (210 kgs-(0.1 kg/parka  2,000 parkas)) = $5.00/kg (210 kgs kgs) = $5.00/kg (10 kgs) = $50 U

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Learning Objective 3 Compute the direct labor rate and efficiency variances and explain their significance.

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Glacier Peak Outfitters has the following direct labor standard for its mountain parka. 1.2 standard hours per parka at $10.00 per hour Last month, employees actually worked 2,500 hours at a total labor cost of $26,250 to make 2,000 parkas. Labor Variances Example

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin ,500 hours 2,500 hours 2,400 hours × × × $10.50 per hour $10.00 per hour. $10.00 per hour = $26,250 = $25,000 = $24,000 Rate variance $1,250 unfavorable Efficiency variance $1,000 unfavorable Actual Hours Actual Hours Standard Hours × × × Actual Rate Standard Rate Standard Rate Labor Variances Summary

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Labor Variances Summary 2,500 hours 2,500 hours 2,400 hours × × × $10.50 per hour $10.00 per hour. $10.00 per hour = $26,250 = $25,000 = $24,000 Actual Hours Actual Hours Standard Hours × × × Actual Rate Standard Rate Standard Rate $26,250  2,500 hours = $10.50 per hour Rate variance $1,250 unfavorable Efficiency variance $1,000 unfavorable

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Labor Variances Summary 2,500 hours 2,500 hours 2,400 hours × × × $10.50 per hour $10.00 per hour. $10.00 per hour = $26,250 = $25,000 = $24,000 Actual Hours Actual Hours Standard Hours × × × Actual Rate Standard Rate Standard Rate 1.2 hours per parka  2,000 parkas = 2,400 hours Rate variance $1,250 unfavorable Efficiency variance $1,000 unfavorable

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Labor Variances: Using the Factored Equations Labor rate variance LRV = AH (AR - SR) = 2,500 hours ($10.50 per hour – $10.00 per hour) = 2,500 hours ($0.50 per hour) = $1,250 unfavorable Labor efficiency variance LEV = SR (AH - SH) = $10.00 per hour (2,500 hours – 2,400 hours) = $10.00 per hour (100 hours) = $1,000 unfavorable

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Responsibility for Labor Variances Production Manager Production managers are usually held accountable for labor variances because they can influence the: Mix of skill levels assigned to work tasks. Level of employee motivation. Quality of production supervision. Quality of training provided to employees.

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Learning Objective 4 Compute the variable manufacturing overhead spending and efficiency variances.

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Glacier Peak Outfitters has the following direct variable manufacturing overhead labor standard for its mountain parka. 1.2 standard hours per parka at $4.00 per hour Last month, employees actually worked 2,500 hours to make 2,000 parkas. Actual variable manufacturing overhead for the month was $10,500. Variable Manufacturing Overhead Variances Example

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin ,500 hours 2,500 hours 2,400 hours × × × $4.20 per hour $4.00 per hour $4.00 per hour = $10,500 = $10,000 = $9,600 Spending variance $500 unfavorable Efficiency variance $400 unfavorable Actual Hours Actual Hours Standard Hours × × × Actual Rate Standard Rate Standard Rate Variable Manufacturing Overhead Variances Summary

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Actual Hours Actual Hours Standard Hours × × × Actual Rate Standard Rate Standard Rate 2,500 hours 2,500 hours 2,400 hours × × × $4.20 per hour $4.00 per hour $4.00 per hour = $10,500 = $10,000 = $9,600 Spending variance $500 unfavorable Efficiency variance $400 unfavorable $10,500  2,500 hours = $4.20 per hour Variable Manufacturing Overhead Variances Summary

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Actual Hours Actual Hours Standard Hours × × × Actual Rate Standard Rate Standard Rate 2,500 hours 2,500 hours 2,400 hours × × × $4.20 per hour $4.00 per hour $4.00 per hour = $10,500 = $10,000 = $9,600 Spending variance $500 unfavorable Efficiency variance $400 unfavorable 1.2 hours per parka  2,000 parkas = 2,400 hours Variable Manufacturing Overhead Variances Summary

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Variable Manufacturing Overhead Variances: Using Factored Equations Variable manufacturing overhead spending variance VMSV = AH (AR - SR) = 2,500 hours ($4.20 per hour – $4.00 per hour) = 2,500 hours ($0.20 per hour) = $500 unfavorable Variable manufacturing overhead efficiency variance VMEV = SR (AH - SH) = $4.00 per hour (2,500 hours – 2,400 hours) = $4.00 per hour (100 hours) = $400 unfavorable

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Hanson Inc. has the following variable manufacturing overhead standard to manufacture one Zippy: 1.5 standard hours per Zippy at $3.00 per direct labor hour Last week, 1,550 hours were worked to make 1,000 Zippies, and $5,115 was spent for variable manufacturing overhead. Zippy Quick Check

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Hanson’s spending variance (VOSV) for variable manufacturing overhead for the week was: a.$465 unfavorable. b.$400 favorable. c.$335 unfavorable. d.$300 favorable. Hanson’s spending variance (VOSV) for variable manufacturing overhead for the week was: a.$465 unfavorable. b.$400 favorable. c.$335 unfavorable. d.$300 favorable. Quick Check Zippy

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Hanson’s spending variance (VOSV) for variable manufacturing overhead for the week was: a.$465 unfavorable. b.$400 favorable. c.$335 unfavorable. d.$300 favorable. Hanson’s spending variance (VOSV) for variable manufacturing overhead for the week was: a.$465 unfavorable. b.$400 favorable. c.$335 unfavorable. d.$300 favorable. Quick Check VOSV = AH(AR - SR) VOSV = 1,550 hrs($ $3.00) VOSV = $465 unfavorable Zippy

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Hanson’s efficiency variance (VOEV) for variable manufacturing overhead for the week was: a.$435 unfavorable. b.$435 favorable. c.$150 unfavorable. d.$150 favorable. Hanson’s efficiency variance (VOEV) for variable manufacturing overhead for the week was: a.$435 unfavorable. b.$435 favorable. c.$150 unfavorable. d.$150 favorable. Quick Check Zippy

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Hanson’s efficiency variance (VOEV) for variable manufacturing overhead for the week was: a.$435 unfavorable. b.$435 favorable. c.$150 unfavorable. d.$150 favorable. Hanson’s efficiency variance (VOEV) for variable manufacturing overhead for the week was: a.$435 unfavorable. b.$435 favorable. c.$150 unfavorable. d.$150 favorable. Quick Check VOEV = SR(AH - SH) VOEV = $3.00(1,550 hrs - 1,500 hrs) VOEV = $150 unfavorable 1,000 units × 1.5 hrs per unit Zippy

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Spending variance $465 unfavorable Efficiency variance $150 unfavorable 1,550 hours 1,550 hours 1,500 hours × × × $3.30 per hour $3.00 per hour $3.00 per hour = $5,115 = $4,650 = $4,500 Actual Hours Actual Hours Standard Hours × × × Actual Rate Standard Rate Standard Rate Zippy Quick Check

Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin End of Chapter 10