MONKEY RUN, ARCADE, NY. HISTORIC RAILROAD PROTECTION & DEMONSTRATION PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION.

Slides:



Advertisements
Similar presentations
NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER.
Advertisements

Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
GRADE CONTROL. STABILIZE HEADCUTS FIRST, THEN WORRY ABOUT BANK INSTABILITY SECOND.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
SITE 6 – DELAWARE RIVER RIGHT BANK BLOW-OUT UP THE HILL FROM THE DELAWARE RIVER (SWIRLING RIVER EROSION & GROUNDWATER PIPING) DELAWARE WATER GAP NATIONAL.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
SKUNK RIVER PIPELINE PROTECTION PROJECT NEAR DENMARK, IOWA SUB MAR.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
SUB MAR West Fork of Beaver River West Point, OH. Pre-project pictures. Note eroding outer bank.
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
SINGLE STONE BENDWAY WEIRS
An Experience In Conducting A Longitudinal Profile… A Study of the Response of San Pedro Creek to the US Army Corps of Engineers (USACE) Flood Control.
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II CONSTRUCTED JUNE 18-20,
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
GRADE CONTROL.
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II.
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
ONONDAGA CREEK, NEAR SYRACUSE, NY
VINES – THE OVERLOOKED RESTORATION TECHNIQUE
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
When should you fix a stream????
SINGLE STONE BENDWAY WEIRS
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
Module # 16 Restoring Functions to Streams Through Design
When should you fix a stream????
InstaTurf Project Spotlight
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

MONKEY RUN, ARCADE, NY. HISTORIC RAILROAD PROTECTION & DEMONSTRATION PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION

This project was funded by the Great Lakes Commission, through the Seneca Trail Resource Conservation and Development Council, Inc. and implemented with the assistance of the Wyoming County Soil & Water Conservation District Alleghany Ecological Services U.S. Army Corps of Engineers NYS DEC Region 9 Cattaraugus County Soil & Water Conservation District NRCS Area Office, Batavia, NY Attica and Arcade Historic Railroad,

PRE-PROJECT CONDITIONS AT MONKEY RUN Stream has been straightened in mid-1800’s (railroad), & 1959, & 1965 (NY State Highway Dept.) Stream is incised (disconnected from the flood plain) Active knickpoints (headcuts) throughout the system Stream is shallow and overwidened. We turned 2 bends and one crossing into 6 bends and 5 crossings. The grade control structures consist of a 3-log Log Digger, a 6-log Log Aerator-riffle, one Engineered Rock Riffle, two Solid-Sill Engineered Rock Riffles, and one Adjustable Random-Boulder Rocked Riffle

From the air, flow is left to right, 5/18/2005, YELLOW IS NEW CHANNEL ALIGNMENT Pix by Derrick

From the air, flow is left to right, 5/18/2005, WHERE THE NEW CHANNEL SHOULD HAVE BEEN LOCATED–BUT THE BYPASS CHANNEL WAS PUT IN THE WRONG PLACE, THINK AHEAD !! Pix by Derrick

THE PROJECT Construction Oct 25-Nov 11, 2004 In addition to protecting the railroad at two sites, we will replace two bends and one crossing with 6 bends and 5 crossings (riffles)

Log Outer-Bank Bend Protection with Living Retard & Solid-Sill Engineered Rock Riffle ( Bend #1 and Riffle #1 in the Monkey Run realigned channel, Arcade, NY, constructed Oct-Nov 2004)

Looking US at Pool #1, log revetment in place and anchored with duckbill anchors

Backfilling behind log revetment in Pool #1. Logs are designed to be undercut and act as LUNKERS

TRANSPLANTED LIVING WILLOW RETARDS MONKEY RUN STREAM REALIGNMENT PROJECT, ARCADE, NY {rural, gravel-cobble, straightened three times, re-meandered during project, incised} THINK BIG!!!! THINK INSTANT!!! Transplanting an entire big clump of willows (roots and all) a track hoe bucket (4 ft wide) at a time Multi-function, used to weigh down bank protection and provide bank protection, shade, cover, insect habitat, etc

Backfilling behind log revetment in Pool #1. Logs are designed to be undercut and act as LUNKERS Mini case study: 1 of 7

Grab a scoop of willows Mini case study: 2 of 7

Place them on the outer bank. Looking US in Bend 1. Mini case study: 3 of 7

Get some more willows Mini case study: 4 of 7

More willows Mini case study: 5 of 7

Looking US. Skilled track hoe operator has managed to orient willows out over pre-dug pool. The entire transplanting operation took about 20 minutes Mini case study: 6 of 7

Looking US at Living Willow Retard two growing seasons after planting Aug 24, 2006 Pix by Derrick Mini case study: 7 of 7

Looking US at Living Willow Retard at beginning of the third growing season after planting-June 14, 2007 Pix by Derrick

The next 5 slides are looking downstream thru the same bend, Bend #1.

Looking DS at the flow cut-off structure on LDB & into constructed Bends 1 and 2 -Nov 2004

Nov 5, It took approx. 20 minutes to place the entire Living Willow Retard, if I were a fish I would be……..

……. swimming under the overhanging veg!!! Aug 24, Looking DS at Living Willow Retard on left bank in Bend #1 Pix by Derrick

After two growing seasons, Aug 24, Looking DS at Living Willow Retard on left bank in Bend #1 Pix by Derrick

Bend #2 “BioD-Block” Coir Block System Proprietary method, introduced 2003 An easier way to construct encapsulated earth- filled system of lifts Locked Logs and/or Locked Limbs can be integrated between underwater lifts Vegetation can be integrated between emergent lifts Living Retards/Living Dikes can be placed on top of the BioD-Blocks

Display booth at IECA conference, Philly PA., Feb 2004

Looking DS at Pre-dug Pool #2, BioD-Block material in foreground

Looking DS at BioD- Block, ready for willow retard installation on top of coir logs Nov 5, 2004

Fred Kelly cutting Locked Limbs and Locked Logs for that pre-formed pool in the previous picture

After two years, looking at Locked Limbs & Locked Logs in Bend #2, Monkey Run. Aug 24, 2006 Pix by Derrick

Two years later, looking DS at BioD-Block bank, Aug 24, 2006 Pix by Derrick

Nov 5, Looking DS, at engineered solid-sill rocked riffle #1, then Bend #2 with BioD-Block coir bank protection (single 16 inch lift) with some black willow (tall light-colored branches)

After two growing seasons, Aug 24, Looking DS at rocked riffle and Bio-D Block in Bend 2. Willows on left bank in Bend 1 and outer bank of Bend 2 were planted. Pointbar of Bend 2 is transplanted creeping bent grass Pix by Derrick

TRANSPLANT A LITTLE BITTY CLUMP OF STUFF MONKEY RUN, ARCADE, NY Mini case study: 1 of 5

Looking DS. Creeping bent grass sod transplantation to define channel width-Nov 5, 2006 Mini case study: 2 of 5

Aug 24, Looking DS at Bend #2, note nice growth on pointbar Pix by Derrick Mini case study: 3 of 5

Aug 24, Looking DS at the Bend #2 pointbar Pix by Derrick Mini case study: 4 of 5

Aug 24, Great diversity & shallow areas on the pointbar. Almost a hemi-wetland!!!! Pix by Derrick Mini case study: 5 of 5

The UB class pulling non-biodegradable netting out of Monkey Run. Aug 24, 2006 Pix by Paul Fuhrmann

Freeing several dozen trapped crawfish from the non-biodegradable netting at Monkey Run-Aug 24, 2006 Pix by Paul Fuhrmann

When regulatory is happy…

And the designers are confused…. Only then is the project complete………