Central Water and Power Research Station, Pune World Bank's Final Supervision and Completion Mission Progress Review.

Slides:



Advertisements
Similar presentations
Slovenian experience MEASURES TO STRENGHTEN THE CIVIL DIALOGUE AND PARTNERSHIP Irma Mežnarič Brussels - 10 October 2006.
Advertisements

Sigma assistance to public procurement reform
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
United Nations Environment Programme. UNEP’s Work to Advance the Preparation and Implementation of National Adaptation Programmes of Action 3 September.
CENTRAL WATER COMMISSION. Hydrology Project Phase-I  To establish a functional hydrological information system.  To improve institutional capacity 
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
State Fire and Rescue Service of Latvia CBSS Latvian activities.
Research Programme Design and Management – Experiences from CRUE – Partner Countries Reiner Enders PTJ (Project Management Organisation Juelich) Brussels,
Govt. Engineering College Kozhikode TEQIP –II VII th Review meeting th April 2015.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
Addressing National Priorities in TEMPUS Projects TEMPUS Project for Establishing a Center of Excellence for Research & Training at Damascus University.
Adapting to Climate Change in the Caribbean (ACCC) GECAFS Meeting February 24-26, 2003 CIMH, Barbados Marcia Chevannes Creary Project Component Manager,
Urban Training & Studies Institute UTI
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
UNIVERSITY OF DAR ES SALAAM, TANZANIA ACTIVITIES ON INTERNATIONAL RELATIONS: EXPERIENCE AND CHALLENGES By. H.R.T. Muzale and R. Toba.
Participatory research to enhance climate change policy and institutions in the Caribbean: ARIA toolkit pilot 27 th meeting of the CANARI Partnership January.
A.Scheme for Establishment and Strengthening of SIRDs and ETCs  28 SIRDs and 89 ETCs imparting training to RD functionaries, elected representatives.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Kick-off Meeting Belgrade, 4-5 December 2008 Network of Centres for Project Development and Management.
Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD
Interstate Statistical Committee of the Commonwealth of Independent States (CIS-Stat) Implementing the Global Strategy to Improve Agricultural and Rural.
National Hydrology Project Central Ground Water Board WB Mission: 1-15 September
VIETNAM STATISTICAL DEVELOPMET STRATEGY , VISION TO 2030 (VSDS) Presented by: Nguyen Van Doan Director, Institute of Statistical Science GSO December,
NATIONAL INSTITUTE OF HYDROLOGY ROORKEE Sept. 14, 2015 NEW DELHI.
1 Mid Day Meal Scheme MDM-PAB Meeting – Lakshadweep On Dining Hall in Lakshadweep.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
GOVT. ENGINEERING COLLEGE BARTON HILL THIRUVANANTHAPURAM – th Review Meeting : TEQIP -II April 2015.
CAPACITY BUILDING ON ELECTRICITY REFORMS IN BANGLADESH, INDIA AND NEPAL (RESA PROJECT) (RESA – Regulatory reforms in Electricity sector in South Asia)
Legal and institutional foundation of economic statistics Overview of international experience Regional Workshop for African Countries on Compilation of.
HYDROLOGY PROJECT I HYDROLOGY PROJECT II HYDROLOGY PROJECT Project Period 1996 to 2004 Total Outlay 12.5 Crores Project Period 2006 June to May 2014 Total.
ICPE, Ljubljana 2 nd Special Session of the ICPE Council 28 March 2012.
Urban Flood Risk Management in a Changing Climate : Sustainable and Adaptation Challenges August, , 2009 Urban Flood Risk Management in a Changing.
Central Water and Power Research Station Pune
National Hydrology Project The Way Forward Dr. Amit Prasad 15 th September, 2015, New Delhi.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
EU Project: Trans-Boundary River Management Phase II and Phase III for the Kura River basin – Armenia, Georgia, Azerbaijan ( Transboundary.
African Centre for Statistics United Nations Economic Commission for Africa Session 1a: Environment Statistics Activities in ECA Workshop on Environment.
Mid Day Meal Scheme MDM-PAB Meeting : Chandigarh on Ministry of HRD Government of India.
Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs.
National Hydrology Project Framework for Monitoring and Evaluation (M&E)
WGCapD, CEOS and the UN Sustainable Development Goals (SDGs) Committee on Earth Observation Satellites Deputy CEOS Executive Officer / CSA Marie-Josée.
Coastal Aquifer Management in the Caribbean Workshop 14 th -16 th December 2011 The Water Resource Management Agency Ministry of Sustainable Development,
World Bank Procurement Procedures Module - Technical Specifications for RTDAS Anish ….. Hydro-Informatics Expert The World Bank.
National Hydrology Project Orientation Workshop 9 th May, 2016, New Delhi.
Presentation By: V.K. Kanjlia Secretary Central Board of Irrigation and Power 1 First India Irrigation Forum (IIF1)
1 BRIEFING TO THE PORTFOLIO COMMITTEE ON THE UTILIZATION OF CONSULTANTS BY DWAF 8 June 2005.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
The European Science Foundation is a non-governmental organisation based in Strasbourg, France.
WATER RESOURCES DEPARTMENT
R&D Programme in Water Sector : RESEARCH & DEVELOPMENT (R&D) DIVISION: ‘R&D in Programme in Water Sector’ MoWR,RD&GR.
TEMPUS INFORMATION DAY NEDAL JAYOUSI/Ph.d. NTO PALESITNE TEMPUS IV- FIFTH CALL FOR PROPOSALS.
National Hydrology Project Dr
Census Planning and Management
GOVERNMENT OF TELANGANA Irrigation & CAD Department
National Hydrology Project
MDM-PAB Meeting- Manipur
Monitoring of sdgs indicators in the Russian federation
Ministry of Water Resources, River Development and Ganga Rejuvenation
National Hydrology Project
COMMISSION FOR HYDROLOGY (CHy)
Details of SPMU (in position), Staff Strength etc
1st World Bank Mission under the National Hydrology Project
ISA Fellow Ship Program Mid Career Professionals
Civil Protection Financial Instrument – Prevention Projects
Introduction to the training
Human resource and Work flow of the Research Office, RUPP
Status and Plan of Regional WIGOS Center (West Asia) in
Mr. Alper GÜCÜMENGİL Head of Projects Group, TURKSTAT
Presentation transcript:

Central Water and Power Research Station, Pune World Bank's Final Supervision and Completion Mission Progress Review

2 Central Water and Power Research Station (CWPRS), Khadakwasla, Pune  CWPRS, established in 1916, is a premier hydraulic research institute in India, under Government of India Ministry of Water Resources  Excellence in providing technological solutions of practical utility for optimal and safe design of water resources structures through a combination of applied research and effective utilisation of latest technology for sustainable development and management of the country’s water resources  Work methodologies- physical and mathematical model studies, desk studies, field and laboratory experiments  Few specialised areas- river training and flood control, hydraulic structures, harbours, coastal protection, foundation engineering, construction materials, pumps and turbines, ship hydrodynamics, hydraulic design of bridges, earth sciences, cooling water intakes, environmental studies, water resources development, management and planning etc MAJOR DISCIPLINES River EngineeringCoastal and Offshore Engineering River and Reservoir Systems ModellingFoundation and Structures Reservoir & Appurtenant StructuresApplied Earth Sciences Instrumentation, Calibration and Testing Services

Role of CWPRS in HP-II  As a central implementing agency, CWPRS primarily plays a role as facilitator in R&D.  Achievements, developments and capacity building of CWPRS during HP-II are summarized as below:  Technical Advancements  Infrastructure Development  Research Activities under HP-II 3

Technical Advancements Capacity Building Trainings Received by CWPRS Officers (in India) 4 YearNumber of training programmes Number of officers received training

Technical Advancements (Contd...) Participation of CWPRS officers in international training 5 Sl. No. Training Course TitleVenueNo. of Officers 1Water Resources PlanningIIHE, Netherlands 1 2Use of Developed DSS in Water Resources Management DHI, Denmark1 3Climate Change: Earth System Future Scenarios and Threats Newcastle University, UK 1

Technical Advancements (Contd...) Trainings course conducted by CWPRS 6 NoTraining Course TitleVenueNumber of Participants 1Prediction of Hydrologic Variables for Ungauged Basins Pune21 2Optimisation of Gauge & Discharge network in Maharashtra (3 workshops) Nasik100 (40 in 1 st course, 35 in 2 nd and 25 in 3 rd ) 3Calibration of current meters and their usage in rivers Goa35 4Application of Statistics in HydrologyPune21 5Application of ArcGIS in Water Resources Studies (3 courses) 23 (6 in 1 st course, 5 in 2 nd and 12 in 3 rd ) 6Water quality data analysis, reporting and presentation Pune13 7Canal Automation using SCADAPune20 expected (20-22 May 2014)

Infrastructure Development Upgradation of Research facilities 7 No.Facility DescriptionCost (Rs Lakhs) 1Supervisory Control And Data Acquisition (SCADA) Civil works for upgradation of model canal Upgradation of current meter rating trolley facility ( up-gradation of certain identified hardware spare parts/ software component 1.15

Infrastructure Development Upgradation of Research facilities SCADA System Infrastructure Developed at CWPRS 8 Model Canal ADCP Data Acquisition System SCADA Screenshot of software

Infrastructure Development IT hardware and Software 9 Sl. No.DescriptionQuantitySl. No.DescriptionQuantity HardwareSoftware 1Desktop PC71ArcGIS1 2Laptop PC2 2 Utility software 3Workstations1MS-Office2 4Printers5Windows 72 5Scanners3QuickHeal Antivirus 3 6Photocopy Machines 23SCADA1 7Computer Furniture 3 8Handheld GPS1 9Multi-media projector 1

Infrastructure Development of CWPRS Physical Infrastructure comprising the buildings and allied structures were renovated and modified as the case may be to boost the image of institute in both national and international perspectives. 10 No.Facility DescriptionCost (Rs in lakh) 1Modernisation of Library Building Renovation of VIP suites in Guest House Renovation of Conference Hall Up-gradation of two Lecture Halls50.87

Infrastructure Development of CWPRS Physical 11

Research Activities under HP-II Purpose Driven Study (PDS)  PDS on “Optimisation of stream gauge and rain gauge network for Upper Bhima basin in Maharashtra” was carried out by CWPRS in association with Govt. of Maharashtra (GoM).  Bhima basin up to Ujjani reservoir was chosen as a pilot basin for the study. Scope of the work included reviewing the preliminary work done by GoM and providing additional technical inputs.  Three workshops on the study were conducted during and jointly by CWPRS and Government of Maharashtra (GoM) at Jal Vigyan Bhawan, Nasik; with about 100 officials trained through the workshops. 12

Research Activities under HP-II (Contd...) Purpose Driven Study (PDS)  Technical Report based on the study was submitted to WRD, GoM and PCS in December  Five technical papers were published in international/ national journals based on the results of PDS. 13

Research Activities under HP-II (Contd...) Purpose Driven Study (PDS)  For Hydrographic survey for Tawa reservoir CWPRS completed field survey jointly with the WRD officials of Govt of Madhya Pradesh during Feb.-Mar, Report on the study under preparation. 14

Research Activities under HP-II DSS (Planning)  CWPRS representives actively participated in all the meetings and workshops, training programmes of DSS (P) during conceptualisation of DSS (P) model, customisation and scenario simulation stages of DSS (P)  CWPRS is a member of `Maharashtra State Decision Support System (DSS) Expert Group’  Generic DSS solutions software developed by the DSS (P) consultants, (DHI, Denmark) is installed on the workstation computer procured for the purpose by CWPRS. 15

Research Activities under HP-II DSS (Planning) 16 Participation of Dr. C. Ramesh, SRO, CWPRS in the 3-weeks training course on “Use of DSS in Water Resources Management and Application of the Developed DSS Software”, organised by DHI, Denmark during 19 th September to 7 th October 2011

Financial Achievements In accordance with WB document of HP-II, the budgetary cost allocated for CWPRS is about 3.69 crore initially and subsequently revised to 4.64 crore during various RCTs. Details of component-wise expenditure under HP-II for the period April, 2006 – March, No.ComponentExpenditure (Rs) 1Civil Works 2,75,48,386 2Goods 49,40,293 3Consultancy’s Services 0 4Training 6,29,256 5Operating Costs 85,29,229 Total 4,16,47,164

 SCADA system developed at CWPRS under HP II will be utilised to carry our research in this field, to demonstrate automated control of canal operations and impart training of officials from various state and central agencies.  Trainings received by CWPRS officers in DSS(P) and the infrastructure developed at CWPRS for DSS(P) would be useful during the sustenance of DSS(P), for arranging trainings in this field and also basin specific studies can be undertaken.  Physical and IT infrastructure strengthened during HP-II would be effectively utilised for undertaking client sponsored studies and research in the field of Hydrology and Water Resources Analysis. 18 Post project plan for implementation of HP-II activities

 Periodical (internal and external) review was helped in achieving the physical and financial targets of the project.  Collaboration with state/ central agencies was helped CWPRS to know about their activities and its implementation schemes in water resources projects.  Better technical exchange of ideas with national/ international experts would be helpful.  Training on procurement procedures and reimbursement during the implementation period of the project from to time was helpful to CWPRS. 19 Lessons learnt from HP-II

Plan for information Dissemination CWPRS had shared its experience in hydrological and water resources studies through organising 10+1 training programmes on various technical aspects. Further CWPRS officials had participated in various National/ International training programmes and workshops organised at different institutes under HP II. CWPRS can play active role in R&D activities under the proposed HP III. 20

THANK YOU