Refuge Alternative Examinations, Approvals, and Refits Stakeholder Meeting-MSHA HQ June 27, 2012.

Slides:



Advertisements
Similar presentations
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Advertisements

East Carolina University Compressed Gas Safety Training Program
Respiratory Protection Program (RPP) San Joaquin Delta College Revised: 10/05/2011.
HVAC523 Soldering.
Procedures For Cleaning A Revolver By Sherry L. Goucher, Sr. CTO Oklahoma Dept of Corrections District V – Community Corrections Approved on July 9, 2001.
MNM Fatal Falling Material Accident Falling Material Accident August 17, 2012 (Florida) August 17, 2012 (Florida) Victim Recovered September 4,
Oxyacetylene Torches.
 Description of PressurePro System  Identify system components  Display and Operational Modes  Sensor alerts  Checking of tire pressures  Manual.
How to Pull a Truck & Trailer Safely Ethan Williams.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
Tire Servicing Program. Agenda WorkSafeBC Requirements Definitions Responsibilities General safety.
3.2.5 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Requalifying DOT Cylinders by CGA External Visual.
OXYFUEL WELDING. INTRODUCTION Oxyfuel welding is a welding process where the heat for fusion is supplied by a torch using oxygen and a fuel gas. Several.
3.6.2 Student Book © 2004 Propane Education & Research CouncilPage 1 Many propane marketers receive railcar bulk propane shipments. Well-trained personnel.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Spray Finishing Operations/Spray Booth March 9, 2009.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Orientation to the Accreditation Internal Evaluation (Self-Study) Flex Activity March 1, 2012 Lassen Community College.
Quality control of raw materials In-process control
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Respirator Safety This Training Covers Respirator Inspection User Fit Checks Respirator Cleaning Respirator Storage.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
RESPIRATORY PROTECTION STANDARD FEDERAL REGISTER 1/8/98 29 CFR Revised Other OSHA Standards That Incorporated By Reference.
Types of corrosion Dr. Syed Hassan Javed.
© 2003 By Default! A Free sample background from Slide 1 MSHA FY 2008 Budget Review and Ongoing Activities.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
Failure Analysis: Christmas Lights. Case Description & Hypotheses Fracture of the bent brass contact piece in various light bulb sockets The unbent contact.
Development of a Research Roadmap Related to Safe and Reliable Transportation of Ethanol in Pipelines Prepared for Pipeline Research Council International,
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Monitoring IRB Monitoring of Clinical Trials. Types of Monitoring Internally Internally Externally Externally.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
Important informations
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
What Documentation Needs to be Submitted With an Approval Application?
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
Refuge Alternative Update January 31, Refuge Alternative Rule Required by 2006 MINER Act and 2008 Appropriations Act for underground coal mines.
The TNI National Environmental Laboratory Accreditation Board Update Daniel Hickman, NELAP Board Chair.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Workgroup Members DROPS International DROPS Members / Workpacks DROPS Training.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
Development of a Research Roadmap Related to Safe and Reliable Transportation of Ethanol in Pipelines Gap Analysis - Phase 1 Prepared for Pipeline Research.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
Fire Extinguisher Inspection
Getting The Most Out Of Release Detection Testing National Tanks Conference 2015 Phoenix, Arizona September 15,
CBER Common Problems on Source Plasma Inspections Judy Ellen Ciaraldi BS, MT(ASCP)SBB, CQA(ASQ) CBER, OBRR, DBA September 16, 2009.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Workshop on Permanent Closure of Single-Walled USTs and Funding Opportunities For Closure and Cleanup.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Unit A 6-4 Mechanical Systems and Technology. Problem Area 6 Agricultural Power Systems.
Request for Information (RFI) on Refuge Alternatives Purpose Requesting comments on issues and options relevant to miners’ escape and refuge Improve overall.
Refuge Alternative 30 CFR Part 7 Approval Status August 7, 2013.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
MAP Assembly Investigation A project summary for discussion during 4/11/2014 meeting.
Supplier Corrective Action Request (SCAR) Supplier Training
ACCA/PAB/ICAJ/ICAC Practice Monitoring Reviews OVERVIEW OF FINDINGS 19 July 2014.
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
East Carolina University Compressed Gas Safety Training Program
Timeline of Key Events B&W Safety Assessment Indicates Head Inspection Being Performed, Sources of Leaks Identified, No Other Inspections Required D-B.
SAFE WORK INSTRUCTIONS
The Fall Protection Harness: Inspection, Care and Maintenance
Oxygen Acetylene Cutting Torch
Fluid Power System Maintenance and Troubleshooting
Presentation transcript:

Refuge Alternative Examinations, Approvals, and Refits Stakeholder Meeting-MSHA HQ June 27, 2012

History Initial fitting failure in January 2011 at Sentinel mine. Alerts published January 25 th, February 10 th and November 4 th, Sherry Labs conducted analysis following a second fitting failure at Flint Ridge mine. MSHA sent fittings for analysis to OSHA laboratory. Both laboratories identified stress corrosion cracking (SCC). OSHA laboratory indicated brass fittings are on path to failure. Dimensionally incorrect fittings are also problematic.

October 14, 2011 WVOMHS&T Order Responds to determination that brass valves and fittings are subject to corrosion and cracking over time in underground coal mining environments and that some fittings are not appropriate for use with 4500 psi cylinders. Mandates examination of existing valves and fittings and determination about ability to remain in service until replacement with alternative type of valve and fitting. The examinations were to include physical examinations designed to detect signs of corrosion, stress-corrosion cracking, and dimensionally incorrect fittings. Mandates replacement of brass valves and fittings with pieces that are not subject to corrosion or cracking. Creates reporting requirements for refuge manufacturers and mine operators to include number of brass fittings and valves examined and a listing of the above deficiencies. Contemplates that breathable air, harmful gas removal, and air monitoring components will have current MSHA approvals when the fittings and valves are replaced and before the units are placed back into service.

MSHA Policy -- PPL P11-V-17 Acknowledges the problem and the ultimate solutions consistent with the manner that WV did in its October 14 Order. Acknowledges the problem and the ultimate solutions consistent with the manner that WV did in its October 14 Order. Recognizes that currently most refuge units in use are approved by the State of WV and accepted by MSHA in ERP plans. The ultimate goal is the replacement of existing brass valves and fittings with valves and fittings not subject to corrosion and cracking AND transition to MSHA approved breathable air, harmful gas removal, and air monitoring components by the December 31, 2013 deadline.

Implementation Stages: Step 1: Examination of Refuge Units to Ascertain Damage to Valves & Fittings and to Measure Fitting Dimensions. Step 2: Determine whether Existing Valves and Fittings are Safe and Reliable for Use until Non-Brass Fittings and Valves are Commercially Available. If Not, Remove Unit or Replace Existing Fittings and Valves. Step 3: Establish a Schedule for Replacing Brass Fittings and Valves Step 4: Replace Brass Fittings and Valves and upgrade to MSHA part 7 approved components.

Refuge Alternative Manufacturer Examination Results so Far… Several manufacturers have not completed the required examinations. Very few cracked valve and corrosion issues have been reported. Hundreds of dimensionally incorrect fittings have been reported. When deficiencies were indicated on the manufacturer reports, either the unit was taken out of service or a letter was provided stating that it was safe to remain in service until refit. On June 14, 2012 MSHA and WV held a meeting with refuge manufacturers to discuss their examination results

MSHA and WV follow-up MSHA and WV stated in August, 2011 at the manufacturer meetings in Charleston that we would conduct follow-up evaluations to check the quality of reporting. To date four different brands of refuge alternatives were inspected at four different mines. Additional evaluations are planned. The results of the follow-up evaluations revealed deficiencies that were not reported in the original manufacturer examination reports. Where present, corrosion and water accumulation were immediately evident. MSHA used a borescope with video recording capability to conduct and document the evaluations, however cracks and corrosion were evident without the use of this tool. Inspection mirrors with adequate lighting would have been sufficient to detect cracked valves.

Pressure Relief Device (PRD) To manifold system Threaded into cylinder Cracks have been found around PRD boss on forging part line and at 90° Common Valve Section Indicating Crack Locations Cracks have been found in CGA threads Cracked PRD

Fitting Dimensions and Crack Locations 1.125” min ” Cracks have been found on rear face and hex flats CGA 701 Fittings have been found with incorrect dimensions

Example of cracks found during follow-up evaluations Crack found on rear face of CGA 701 fitting

Example of cracks found during follow-up evaluations Crack found on rear face of CGA 701 fitting Dried leak detection fluid

Example of corrosion found during follow-up evaluations Corrosion and reddish dezincification are apparent on these fittings and valves

Example of cracks found during follow-up evaluations Crack around PRD boss (view looking down onto PRD)

Example of cracks found during follow-up evaluations Crack around PRD boss (view looking down onto PRD)

Example of cracks found during follow-up evaluations Crack around PRD boss (view looking down onto PRD)

Example of cracks found during follow-up evaluations Two cracks were found on this cylinder valve Crack around PRD boss (view looking down onto PRD)

Example of cracks found during follow-up evaluations Two cracks were found on this cylinder valve Cracks around PRD boss

Example of crack and corrosion found during follow-up evaluations Crack around PRD boss (view looking down onto PRD) Note white corrosion that was not indicated on examination report

Example of corrosion found during follow-up evaluations White corrosion is readily visible. This type of corrosion indicates the presence of zinc oxide, which means that the zinc is coming out of the brass matrix, a condition called dezincification. This condition may lead to stress corrosion cracking.

Example of corrosion found during follow-up evaluations White corrosion is visible along with red discoloration indicating dezincification

Example of SCC found during initial evaluation Corrosion formed on surface Note that on magnification cracks are forming

Example of SCC found during initial evaluation Corrosion forming on surface of otherwise shiny brass

Example of SCC found during initial evaluation Corrosion formed on surface note the pitting

Example of zinc oxide found during initial evaluation Zinc oxide formed on brass leaving spongy copper metal

Example of SCC found during initial evaluation Corrosion Forming within the metal

Example of SCC found during initial evaluation Corrosion pit with crack forming

Evaluation Video Click on Video to View

What to look for during an examination Gauge pressure and history to determine leakage over time. Moisture and water accumulation, which promotes corrosion and cracking. Any corrosion on the brass valves/fittings, including white, green or red areas indicating dezincification. Cracks on the pressure relief device bosses, valves and CGA fittings. Correct dimensions (measured) on CGA fittings. Only ammonia free/oxygen safe leak detection fluid can be used. If used, leak detection fluid should be wiped off so that residue does not impede future examination.

Views of Various Valve and Cylinder Arrangements Showing Differing Examination Access Different methods and tools may need to be employed

Pressure Relief Device (PRD) To manifold system Threaded into cylinder Cracks have been found around PRD boss on forging part line and at 90° Common Valve Section Indicating Crack Locations Cracks have been found in CGA threads Cracked PRD

Fitting Dimensions and Crack Locations 1.125” min ” Cracks have been found on rear face and hex flats CGA 701 Fittings have been found with incorrect dimensions

Examples of Conditions to Report These cylinder valves have developed significant corrosion

Examples of Conditions to Report Copper colored and reddish areas indicate dezincification where the zinc has come out of the matrix and only copper is left behind.

Examples of Conditions to Report A crack has developed in a high pressure fitting. Green and white corrosion along with indications of dezincification are also present. Also check for cracks on the rear face

Examples of Conditions to Report Water accumulation and corrosion are obvious

Summary of June 14 th meeting Based on the findings, WV and MSHA recommended new examinations to validate initial reports and to provide reports to WV and MSHA immediately following examination. Manufacturers should develop and provide new examination protocol to WV and MSHA Service personnel should be re-trained in conditions to look for and how to correctly document what is found. Proper examination tools should be provided MSHA and WV will continue to perform follow-up evaluations

Approval Applications Several manufacturers have not submitted part 7 approval applications. MSHA part 7 approvals are required prior to units being refit and placed underground. Refit units with MSHA part 7 approved components are required to be in use by December 31, Components used in 15-psi type refuge alternatives must also have MSHA part 7 approval by December 31, 2013.

Refit Schedules Based on the status of their part 7 approval applications and their reported refit capability, some manufacturers are not currently projected to have all existing refuge units refitted by the 12/31/13 deadline. Per (a)(3), operators can not use currently grandfathered units after 12/31/2013.