ATLAS Module building at Glasgow

Slides:



Advertisements
Similar presentations
Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
Advertisements

Stave Hybrid Status Ashley Greenall 1. Current Status Current build of hybrids (Version 3) distributed to 6(+1) sites: Cambridge, DESY, Freiburg, LBL,
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
1 Module and stave interconnect Rev. sept. 29/08.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.

Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
A. Honma, CERN  Module production: definitions, scope  Industrialization: What do we mean?  Possibilities for automation and outsourcing  Automation.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting UV Glue In November, I sent UV Glue, hybrid panel + jig to Anglo Production Process LTD –UK supplier of.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
Design and Performance of Single-Sided Modules within an Integrated Stave Assembly for the ATLAS Tracker Barrel Upgrade Ashley Greenall The University.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Sergio Díez Cornell, Berkeley Lab (USA),
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Stave Tooling & Plans for Future Stave-building (Tim)
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Si Sensors for Additional Tracker
Berkeley status Aug 10th, 2012.
ATLAS pixel module assembly flow
Planar distortions for SCT Barrel Modules
Hybrid Pixel R&D and Interconnect Technologies
Micro Vertex Detector of PANDA Strip Detector
ITK Strip Module Meeting; 12st October 2015
Constructional requirements from ITk-Strips
Gluing jigs for Demonstrator
Database requirements from ITk-Strips for DAQ loads
Reminder of Stave250 Tooling Design
Equipment for Assembly – UK Experiences
Studies of Quad Pixel Module assembly using paper laminate
ATLAS Upgrade Module Bonding Trials Using Glass Asics
Pixel module assembly tooling
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

ATLAS Module building at Glasgow Andy Blue: on behalf of the Glasgow ATLAS upgrade group

ATLAS Upgrade Replacing all the Silicon in the SCT Presentation will focus on the Si Strip detectors (also work at Glasgow on the upgrade to the pixel detectors) Major changes previous modules More Asics (now 20) Will be reduced to 10 @130nmCMOS More Strips 20*128*2=5120/module However, no fan in/link between Si Hybrids now glued directly ON to the Si

Atlas Upgrade Taken from “Parameters of the phase2 ITK Draft 27.5.2012” Layer 1: 28 staves (at r = 412) [Short @ 2.4cm] Layer 2: 40 staves (at r= 555) [Short @ 2.4cm] Layer 3: 48 staves (at r=698) [Long @ 4.8cm] Layer 4: 60 staves (at r=866) [Long @ 4.8cm] Layer 5: 72 staves (at r=996) [Long @ 4.8cm] =248 Staves in total The number of modules in stave = 26 6448 modules in 3 years (150 weeks) 42.986modules per week 8.597 modules per day for all module building groups Assumes 100% yield!

Assembly of a Module 1) Glue ASICS on to a FR4 strip (‘Hybrid’) Wire bonds for ASIC-ASIC 2) Glue 2 Hybrids onto a Si sensor (‘Module’) Wire bond from ASIC to Si Strips

Hybrid Construction Goal is to accurately glue 20 Si CMOS chips on to a FR-4 based panel to make a Hybrid

Present Technique Place ASICs in holder (Machined acetal with metal top)

Picking up ASICS Attach a vacuum jig to the holder

Hybrid Gluing Apply a stencil and spread glue evenly on back to leave 5 spots per asic

ASICs in position on Hybrid Place vacuum jig on to FR4 board and apply a brass weight to cure the glue

Module gluing Goal is to glue to Hybrids (shown before) to a Silicon sensor

Module Alignment Frame is placed on a jig, then Silicon sensor placed in frame (held by small lip round edge of frame)

Module Gluing A cardboard stencil is placed on top of the Si sensor and glue is spread Glue used is an epolite epoxy

Module Assembly 2 hybrid pick up tools are then attached to the module jig

Work so far Hybrid Building Wire Bonding Readout

Hybrid Assembly

Wire Bonding Bonding Purchased and installed Bondjet 820 Fully wire bonded our first hybrid panel Wire bonded 1st half of module Successfully bonded trial of new pitch for modified module design

Testing HSIO FPGA development board Can test Runs SCTDAQ software Hybrids Modules Stavelets (multiple modules)

Testing Testing both hybrids and modules now at Glasgow

Hybrid Testing - (Pre trim)

Hybrid Testing - (Post trim)

Next Test hybrids bonded at Glasgow Begin construction of Modules Test Begin QA and full assembly structure Get ready for pre production