VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI.

Slides:



Advertisements
Similar presentations
Construction Method, Material Selection & Building Services
Advertisements

FOCUS ON GREEN CONSTRUCTION School of Comp. Sci. & Engg.
Design Constraints For Engineering Projects
King Fahd University Of Petroleum & Minerals Value Engineering Study For Car Parking Shade Presented By Ali M. Moussa For CEM 512 :Value Engineering Dr.
VALUE ENGINEERING Mohammed A. Us Shan Saleh H. Al-Mutairi Sagar M. Al-Anazi Samir A. Sulaiman Saleh S. Al-Abbas REFINERY FACILITY.
Watts Scale Control Technology. Fort Bend, Independent School District Overcomes Destruction of Equipment from Scale Armstrong Elementary Formerly Quail.
Skyscraper Construction
PLUMBING DESIGN © Copyright 2008 HVAC Design Solutions1 Essential Design Programs with Accurate Sizing Calculations help to “Streamline Your Design” Essential.
CEM-512 Value Engineering Highway Project: South Interchange.
Chapter 20 Plumbing Plans.
Equipment and Facilities. 154 Plan Review The local health department must assess your facility and equipment before: –Beginning construction of a food.
Dr. Sadi Assaf Professor Construction Engineering and Management
Exterior cladding May 3 rd, Building Cladding 1.What is cladding 2.Types of cladding 3.Construction methods 4.Advantages and disadvantages.
King Fahd university of Petroleum and Minerals Construction Engineering and Management Department CEM 512 Unused Space in Mosque To: Prof. Sadi Assaf Prepared.
Eastern School Compound Term Paper August 2005 CEM 512 Done For Dr. Saddi Assaf Done By. Mohammed Bader.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Chapter 18 Working Drawings.
V.E. of Selecting Flooring Materials KING FAHAD UNIVERSITY OF PETROLEUM & MINERALS College of Environmental Design Construction Engineering & Management.
Skilled Trades 1201 Residential Plumbing.
Green Building Materials
DESIGN GUIDE FOR GAS CENTRALISED HOT WATER SYSTEMS
Chapter # 1 Introduction To Pollution Prevention.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
LAPTOP SELECTION Using Value Engineering By Mazen A. Al-Juaid August 13, 2005 CEM 512 Value Engineering.
Facilities Management and Design Chapter 5 Water and Wastewater systems.
Overview of Energy Efficiency & Renewable Energy (Draft version) Prepared by Natural Resources Canada in association with Indian and Northern Affairs Canada.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Construction Unit 5, Lesson 3 Explanation © 2011 International Technology and Engineering Educators Association, STEM  Center for Teaching and Learning™
CEM512 / 043; King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management Value Engineering CEM512 Term.
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
King Fahd University of Petroleum and Minerals CEM 512 Value Engineering Term Project Turbine Fuel Gas Heater Prepared by: Ahmed S. Al Zahrani ID#
Chapter 18 Plumbing Plans.
Residential Construction Unit 5 Energy Efficiencies and Mechanicals Mr. Todzia.
Introduction to Plumbing Date. Bellwork 0 Fill out your KWL sheet about plumbing 0 What do you K now about plumbing? 0 What do you W ant to learn about.
Company LOGO Introduction To An Example Project Prepared by: Alaa El Shorafa Munther Abdel-Hadi Ahmed El Zinati Shukri El Zaza Dr. Kamaleen Sha’th Supervision.
University Medical Center of Princeton David Bodnar Construction Management 2010 Senior Thesis.
بسم الله الرحمن الرحيم SUBJECT: Technical Research Group: Missions, Objectives, Plans and Priorities Prepared By: M.Hajimohammadi Rev.3.2.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
FOOD ENGINEERING DESIGN AND ECONOMICS
Chapter 44 Building Codes and Commercial Design. 2 Links for Chapter 44 Building Codes Design Categories Using the Codes Related Web Sites.
The 2009 Sr Design Project (for Coal). What is Covered Mine Plan and Layout –Methods –Equipment –Manning –Production Rate –Sequence Rock Mechanics –Orientation.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Contractor Alternate Design Serving the Public’s Best Interest.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
TOWN OF PENETANGUISHENE PAYETTE RESERVOIR UPGRADES July 24, 2014.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Anton, Sri Lanka's largest plastic manufacturer has been in service for the last 60 years for the Sri Lankan people.
M ASTER P IPES : A N EW D ESTINATION FOR F ITTINGS TO E ASE Y OUR L IFE Master Pipe Industries Ltd is the company that manufactures uPVC pipes, PPRC Pipes.
Overall overview of Plumbers London. Unlike popular belief, plumbing is an extremely intriguing and varied subject. The wide variety of work involved.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
Facilities Management and Design Chapter 5 Water and Wastewater systems.
INDUSTRIAL APPLICATIONS
PIPING DRAWINGS C H A P T E R T W E N T Y- O N E.
Group 8 David Boley, Deneb Bosch, Nathen Miller, Thanh-an Sam
Plumbing system fundamental and design course
Process Economics Factors that affect profitability
Construction Documents
(Additional materials)
Unit 13 Plumbing Prints. Unit 13 Plumbing Prints.
Pre-Contract Cost Control
TOWN OF Penetanguishene Payette Reservoir Upgrades
An-Najah National University Faculty of Engineering
Potable Water For Villa Complex
Green Building and Sustainable Architecture
UNIT-V ELEMENT OF BUILDINGS.
Architectural Engineering, The Pennsylvania State University
Term Project: Challenges in supplying Energy to Central Region
Full Service Plumbing Columbus, Ohio. plumbing The art and science of creating and maintaining sanitary conditions in a building used by humans. It is.
Presentation transcript:

VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI ASSAF

INTRODUCTION VE JOB PLAN Information Phase Functional Phase Creative Phase Judicial Phase Development Phase SUMMARY AND RESULTS OUTLINE

INTRODUCTION  VE study of Plumbing for the Villa  A team comprised of 3 professionals  VE  Design  Mechanical  On final implementation  Overall 63% in savings were realized

OBJECTIVES  To provide drainage and water service  Minimum performance as required by IAPMO  To fulfill peak load  To provide human comfort for all climates  To drain sewage waste to street mains  To draw water from exterior network and distribute internally  Use locally available material INTRODUCTION

INTRODUCTION COST DATA FIXTURES SR PIPING SR GENERAL ITEMS SR TOTAL SR FOR THE ORGINAL DESIGN PIPING (supply water) SR

WHAT MUST IT DO? IDENTIFY PRESENT FUNCTION FUNCTIONAL PHASE WHAT DOES IT NOW DO? SERVICE BUILDING ---SUPPLY WATER ---DRAIN WASTE ---PROVIDE LOOK ---PREVENT POLLUTION SERVICE BUILDING ---SUPPLY WATER ---DRAIN WASTE ---PROVIDE AESTHETIC ---PREVENT POLLUTION ---PROTECT HEAT ---PROVIDE DURABILITY

FUNCTIONAL PHASE FUNCTION WORKSHEET WHYHOW FUNCTION SUPPLY WATER To fulfill basic human requirements Through piping network To provide healthy environment to live and work DRAIN WATER Through piping network PROVIDE FIXTURES To provide service and aesthetics Through installation

FUNCTION – COST – WORTH FUNCTIONAL PHASE ITEM FUNCTION PRESENT COST(SR) WORTH VALUE INDEX VERBNOUNKIND ALT COST (SR) PIPINGSupplyWaterB20000 UPVC & CPVC PIPINGDrainWasteB4700UPVC FIXTURESServiceBuildingB67000CER GEN. ITEMSRegulateWaterS70000Brass TANKStoreWaterS27500Fiber

CREATIVE PHASE GENERATE IDEAS FOR PIPING TO SUPPLY WATER  Pipes of Copper with insulation  Pipes of Copper without insulation  Pipes of HDPE  Pipes of PPR  Pipes of UPVC and CPVC  Pipes of GI  Pipes of BI  Pipes of GPR

JUDICIAL PHASE CWI CW/oI HDPE PPR UPVC & CPVC GI BI GPR CWI

IDEA COMPARISON JUDICIAL PHASE IDEAADVANTAGESDISADVANTAGESRANKCWI No heat loss High cost CW/oI Easy installation Heat losses and weak HDPEDurable High cost PPR Durable and new technology Requires special device to install UPVC & CPVC Low cost, durable and easy installation Heat loss GPR Durable and easy installation Very high cost

DETERMINING WEIGHTS FOR EVALUATION A – Performance B – Maintenance C – Initial cost D – Durability E – Pollution free ORIGINAL LAYOUT JUDICIAL PHASE A-3A/CA/DA-2 C-2B/DE-2 D-3C-2 D-3 3. MAJOR PREFERENCE 2. MEDIUM PREFERENCE 1. MINOR PREFERENCE RAW SCORE ASSIGNED WEIGHT

JUDICIAL PHASE HDPE/ CWI/ PPR CWI HDPE PPR UPVC & CPVC GPR

PROPOSAL 1 UPVC and CPVC types of pipes are capable of fulfilling all the requirements and achieve desired objectives. DEVELOPMENT PHASE COST DATA PIPING (Supply Water) SR Savings in Initial Cost SR – 76 % FOR THE PROPOSED DESIGN

DEVELOPMENT PHASE PROPOSAL 2 – 2 OVERHEAD TANKS Original Design: 2 Overhead tanks made of concrete with steel structure are to be constructed on the roof of the villa. Proposed Design: 2 Overhead tanks made of PVC can be installed which will give better performance and costs very less. Discussion: Concrete tanks do not restrict heat and it takes more time to construct, whereas PVC tanks are readymade, weather proof and takes very less time to install.

PROPOSAL 2 – 2 OVERHEAD TANKS DEVELOPMENT PHASE ORIGINAL DESIGN COST SR PROPOSED DESIGN COST SR SAVING SR %

LIFE CYCLE COST ANALYSIS FOR THE COMPLETE PROJECT DEVELOPMENT PHASE % ORIGINAL DESIGN (HDPE, CWI & PPR) PROPOSED DESIGN (UPVC & CPVC) ALTERNATIVE 1 (GPR) INITIAL COST MAINTENANCE SALVAGE LIFE CYCLE (PW)

DEVELOPMENT PHASE IMPLEMENTATION PLAN 1.Approval from management 2.Change the purchase order and select the best supplier 3.Mechanical engineering services 4.It takes 3 months 5.Deadline as per the site handover schedule

 The proposed design will  Supply water  Drain waste  Protect pollution  Provide durability  Prevent heat  Do large saving  Prevent maintenance costs  Save time  Improve appearance SUMMARY

THANK YOU