REPUBLIC OF THE SUDAN 5 th NATIONAL POPULATION AND HOUSING CENSUS MONITORING AND OBSERVATION COMMITTEE ENUMERATION PHASE MONITORING REPORT By: Dr Abdel.

Slides:



Advertisements
Similar presentations
ENGENDERING POPULATION CENSUSES IN MALAWI Prepared by: Mylen Mahobe National Statistical Office (Malawi)
Advertisements

CPA Implementation Progress: Status and Challenges Luka Biong Deng Minister of Presidential Affairs, GoSS Sudan Consortium Juba, 21 st March 2007.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE TurkStat NEW METHOD FOR 2010 POPULATION AND HOUSING CENSUS OF TURKEY Considerations about.
On implementation of RTI Act 2005: Government’s initiatives Department of Personnel and Training November 4, 2008, Delhi.
Inita Paulovica Deputy Resident Representative Turkmenistan.
1 Sudan Presentation 5 th IPUMS International Workshop Lisbon-Portugal 21-29,August,2007.
The use of GIS in the Central Bureau of Statistics (CBS), Namibia By Mrs Ottilie M Mwazi Chief Statistician, Survey, Cartography/GIS
1 Sudan 5 th Population Census. 2 The Fifth Sudan Census According to article 215(1) of the Constitution: A population census throughout the Sudan should.
1 Sudan Presentation 5 th IPUMS International Workshop Lisbon-Portugal 21-29,August,2007.
Population and Housing Census An African perspective United Nations Economic Commission for Africa and African Development Bank UN Expert Group Meeting.
IDENTIFICATION AND CONSULTATION WITH DATA USERS – TANZANIA EXPERIENCE Presentated by Irenius Ruyobya National Bureau of Statistics Tanzania September,
GOVERNMENT OF SOUTHERN SUDAN SUDAN CONSORTIUM “ SUSTAINING PEACE THROUGH DEVELOPMENT” 5 TH -7 TH MAY 2008; OSLO, NORWAY Pre-Consortium Session: Planning.
Sudan Experience on Poverty Survey Somaia K.E.Omer Date 7-8 Aug بسم الله الرحمن الرحيم.
Social Mobilization Campaign Against Polio 2006 June 2006.
Post test survey of the General Census of Population and Housing.
1 Presentation on the 2010 Population and Housing Census -Achievements and Challenges Ghana Statistical Service Accra 20 th August Republic of Ghana.
United Nations Economic Commission for Europe Statistical Division Field Operations Distribution and Return of Material Angela Me, Chief Social and Demographic.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES FIRST THINGS FIRST Invitation of a mission Information meeting self-assessment.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys Bangkok,
Workshop on Lessons Learnt International Organization for Migration Mission in Iraq Profiling of Internally Displaced Persons (IDP)
Census Mapping A Case of Zambia UN Workshop on Census Cartography and Management, Lusaka, 8-12 th October 2007.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
Governance Survey Conducted by the Palestinian Central Bureau of Statistics (PCBS) Presented to Workshop on Governance Assessments for Accountable Politics.
THE CHALLENGENGES OF COLLECTING DISABILITY STATISITICS IN A LARGE SCALE EXERCISE, IN UGANDA by Helen Nviiri Uganda Bureau of Statistics.
European Conference on Quality in Official Statistics Session 26: Quality Issues in Census « Rome, 10 July 2008 « Quality Assurance and Control Programme.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
United Nations Regional Seminar on Census Data Dissemination and Spatial Analysis for Arabic Speaking Countries, Amman, Jordan May 2011 Identification.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys Addis Ababa,
The Role of Metadata in Census Data Dissemination Presented By Mrs. Shirley Christian-Maharaj Assistant Director of Statistics CSO Trinidad &Tobago.
Copyright 2010, The World Bank Group. All Rights Reserved. Principles, criteria and methods Part 2 Quality management Produced in Collaboration between.
Mid-Decade Assessment of the United Nations 2010 World Population and Housing Census Program Arona L. Pistiner Office of the Associate Director for 2020.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys Asunción,
United Nations Regional Seminar on Census Data Dissemination and Spatial Analysis for Arabic Speaking Countries, Amman, Jordan May 2011 Identification.
First meeting of the Technical Cooperation Group for the Population and Housing Censuses in South East Europe Vienna, March 2010 PILOT CENSUSES Introductory.
1 CENSUS August 2011 SECRET. 2 Outline of Presentation  Census Benefits  Previous Censuses Difficulties and Outcomes  Census 2011 Key Dates.
IDENTIFYING USES AND USERS OF CENSUS DATA Republic of Zambia Central Statistical Office Pretoria, South Africa 24 th March 2014 Presented by Nchimunya.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Expert Group Meeting on the Revision of the Handbook on the Management of Population and Housing Censuses New York, 14 – 17 December 2015 Overview of the.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys, Bangkok,
CASE STUDIES OF SOME SURVEYS IN SADC COUNTRIES Experience from Tanzania Household Surveys and Measurement of Labour Force with Focus on Informal Economy.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys, Asunción,
IDPs and Returnees Profiling Joint IDP Profiling Service Presented by William Chemaly Geneva, August 10, 2010 Yemen, June 16-July 10.
Adjusting the Organization of National Statistical Systems to Emerging Issues CENTRAL STATISTICS ORGANIZATION AFGHANISTAN by: Abdul Rahman Ghafoori President.
Population & Housing Census of Bhutan 2005 Experiences, lessons learnt & issues.
“ Census is the Image of the Present and the Future ” ENGENDERING POPULATION CENSUS THE HASHEMITE KINGDOM OF JORDAN DEPARTMENT OF STATISTICS (DoS) GLOBAL.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys, Addis.
CONFIRM YOURSELF! FOR THE FUTURE OF YOUR COUNTRY...
Ethiopia Demographic and Health Survey 2011 Introduction and Methodology.
WITH FUNDING FROM THE EUROPEAN UNION The 2016 Crop Assessment Plan FAO/ AFIS South Sudan WITH FUNDING FROM THE EUROPEAN UNION.
6/23/2016 LISGIS Labour Force Survey- Liberia’s Experience Presentation by: Yusuff M. Sarnoh Senior Research Officer Liberia Institute of Statistics.
1 We’re Still Listening: A Survey of the Media Landscape in the Accessible Areas of South Sudan in 2015 Presentation of Key Findings April 2015.
Census Planning and Management
United Nations Statistics Division
National Population Commission (NPopC)
Country Practices on Census Evaluation: 2000 Census Round Pres. 1
Quality assurance in population and housing census SUDAN’s EXPERIANCE in QUALITY assurance of Censuses By salah El din. A . Magid OUR EXPERIANCE IN 5.
2000 POPULATION AND HOUSING CENSUS:
By: Mohammad Sami Nabi Director, Field Operations Department
Post Enumeration Survey Census
United Nations Regional Workshop on the 2020 World Programme
Topic:“Lessons learnt from the 2011 Census”
QUALITY MEASURES IN 2013 POPULATION AND HOUSING CENSUS
United Nations Statistics Division
United Nations Statistics Division
United Nations Statistics Division
Basic preconditions The next round of population and housing censuses is scheduled for the start of the new decade (2021), both in the EU and in the partner.
United Nations Statistics Division
Management and Monitoring Systems
POPULATION AND HOUSING CENSUS ROUND 2021
International Standards and Contemporary Technologies,
Presentation transcript:

REPUBLIC OF THE SUDAN 5 th NATIONAL POPULATION AND HOUSING CENSUS MONITORING AND OBSERVATION COMMITTEE ENUMERATION PHASE MONITORING REPORT By: Dr Abdel Bagi Gailani November 2008

2 INTRODUCTION Sudan on war for last 50 years ( ) CPA signed in 2005 CPA conceived as roadmap to the future of the country CPA calls for equity, equality, Justus, fare distribution of power and wealth and sustainable development Census is the basic tool for achieving the said goals

3 Sudanese Census Census stated in CPA (constitution article # 215 A Census to be conducted by the end of 2 nd year of interim period}. Census should be monitored by an independent body MOC idea was materialized Upper House named the Chair of MOC

4 Census Monitoring Phases Preparatory phase Enumeration phase Post enumeration phase

5 MOC Mandates 1. Monitor and observe the census execution operations at all stages and levels 2. Ensure compliance with census established criteria and standards. 3. Ensure comprehensive coverage 4. Ensure transparency of all census procedures and operations 5. Provide regular reports including recommendations when necessary to the PCC. 6. Provide report on the final census results to the PCC. 7. Provide technical advice to the PCC in writing when necessary

6 MOC Members 75 members representing: Political parties States Representatives Ministries, Academic Institutions, Universities, NGOs and international organizations and. Donors

7 Monitors Selection Monitors posts advertized in local and international media Selection criteria developed Panel established Interviews conducted 318 monitors contracted

8 Monitoring Mission Structure Monitoring Teams Coord 3 International One National Expert Regional Monitors 9 International Experts 9 National Experts State Monitors 16 International Experts 41 National Experts Locality/County Monitors 250 National Monitors MOC Chairman

9 Training of National and International Monitors Background Session: Background information about the Census Methodology Session Monitoring mission structure, roles, responsibilities, monitoring tools and methods. Report Writing Session Reporting guidelines and formats

10 Posting of Monitoring Team Commercial flight used for Darfur and S Sudan, Vehicles for 12 states of N Sudan Hotel accommodation in S Sudan is very expensive and not available in some states. Serious problem of movement within states and between states in Darfur and S Sudan

11 Monitoring Samples One Urban and one Rural locality/county randomly selected from each state of the 25 states of Sudan. 4 EAs from Urban Locality/county and 6 EAs from Rural one were randomly selected from the EAs list prepared by CBS and SSCCSE for each state

12 Monitor’s Tasks Assessment of the availability and adequacy of vehicles, equipment and material s in the state and localities office. Assess the questionnaires storage and security measure established in state and localities offices. Assessment of the identification of enumeration site. Monitoring the handling of the questionnaires in the field. Monitoring the actual enumeration. Monitoring the attitude of the Respondents to Enumerators.

13 Monitor’s Tasks Cont Monitoring the data quality control by Enumerator and Supervisors. Monitoring the payment of field workers. Filling the three survey questionnaires, form A,B and C Writing the daily monitoring reports and submitting them to Regional Monitor and Team Leader. Reporting on their safety and security situation through daily telephone contacts and s.

14 Monitoring Reports 9 Regional Reports 25 State Reports 130 Locality/County Reports One Survey Report Questionnaires A: 226 B: 1945 C: 458 Total 2649 questionnaires were completed and analysed

15 Content of Regional and State Reports 1. Administrative structure and general information about the state. 2. Recruitment of field workers. 3. Adequacy of field worker training. 4. Availability and adequacy of equipments in state and localities levels. 5. Identification and mapping of enumeration areas during house listing and enumeration process.

16 Content of Regional and State Reports Cont 1. Filling of the short and long questionnaires. 2. Return of the questionnaires from field. 3. Payment of field staff. 4. General information related to enumeration process, problem and constraints.

17 FINDINGS OF THE MONITORING SURVEY

18 Pre-enumeration Phase EAs were demarcated EAs maps were produced using GPS and satellite image.  Rebels Forces in Darfur, Landmines in Eastern region, inter-communal conflict in Behr Elgazal Region delayed the demarcation process in a relatively small areas.  Change in EAs size and numbers reported in states that affected by returnees and nomadic population.  Tribal Leaders in some areas in S Sudan refused to cooperate ( EAs will become administrative boundaries after census)

19 Publicity campaign of the Census High level of awareness among population Community in few localities of S Kordofan were confused a bout census due to announcement made by some officials. Census promotion was made through various media : posters, handouts advertisement in the print and electronic media (newspapers, radio, and television), banners, and publicity vehicles fitted with megaphones. In some state publicity was not in the adequate language;

20 Recruitment and training of Field Workers Numbers of enumerators were not sufficient in some S Sudan states, (long distance, bad or no roads, rains and others factors). Principal trainers-Coordinators/field Officers- Supervisors and Enumerators Same national model applied for training throughout the country; All the Enumerators and Supervisors, including those on the reserve lists received training before their deployment.

21 ENUMERATORS’’ CHARACTERISTICS EDUCATION AND OCCUPATION

22 Logistics and Communication Vehicle shortage reported in all states, (situation well managed). Communication between the Field Workers and the Offices was challenging in S. Sudan Storage of questionnaires posed great challenges in some states (Gazal, Upper Nile). Shortage of short form questionnaires attribute to: – Emergence of new areas not included in the mapping, – Increase in population within an EA, – IDPs not taken into consideration when requesting for forms, – Unexpected very large household size, since a form has space for a household size of 8,

23 Enumeration process (1) Enumeration process went very well in all N and S states, no measure problems reported. 95% of counting process finished in Central Region in 7 days (high level of awareness and Census Guiders). No significant cases of shortage of questionnaires or using non original copies. Armed conflict in Upper Nile, Elgazal region (Warrap and lakes inter-communal conflict) interrupted enumeration process. Enumeration of nomadic population in Darfur, Eastern, Behr El Gazal and South Kordofan state was problematic due to insecurity

24 Enumeration process (2) 61% of enumerators are males. % of Females Enumerators in Khartoum (75%), Central (54.8%), Northern Region (54.5%) and about half in Kordofan Region. Only 8% of all Enumerators did not speak the local language. % of Enumerator did not speak local language increased in central and Eastern region 14% to 25% respectively. 85 % of Enumerators confirmed that they received their EAs map

25 Enumeration process (3) % of Enumerators who did not receive their EAs Map

26 Enumeration process (4) 98% of the respondents’ attitude ( national level ) to the enumeration was positive. Percentage of household refused to be counted at state levels are: 9% in Eastern Region, 11% in Bahr El Gazal and Upper Nile Region, 12% in Central 15% in Equatoria Regions. 21% South Kordofan state, 21 % Darfur Regions 25 % Khartoum Region.

27 Enumeration process (5) Enumeration of IDP camps went very well, use of IDPs as enumerators. Local authorities supports is a key factor for the success of the enumeration process; Percentage of incomplete short form questionnaires is 2 %. Good quality control over short form questionnaires. Percentage of incomplete long form questionnaires is 3.4, 21.6, 14.7 for housing condition, owned facilities and Socio- demographic characteristics respectively

28 Questionnaires Retrieval Completed questionnaires submitted to Supervisors, then Census office at States’ Capitals. At National level 12% of Enumerators had at least one completed questionnaire damaged. Number of reported completed questionnaires lost, was very small, statistically insignificant

29 Lessons Learned Postponement of the enumeration process. Coordination, training, posting Selection criteria of Monitoring Team. Insecurity situation, International monitors, Interruption of enumeration process. Monitors training, unified tools. quality reports, more credibility of Monitoring reports. Contingency plan, funds released

30 Thank you Dr.Gailani