WHAT DOES THE PROPOSED SERRA MESA COMMUNITY PLAN AMENDMENT Mean For You?

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Grade Separation Alternative
TEAMING FOR SUCCESS “TXDOT IS HERE TO HELP” Site Selection and Access For Large Distribution Centers 1 Several DCs in industrial park near Alliance Airport.
January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
 Provide a safe crossing and maintain mobility › The bridge is identified as structurally deficient.  Meet regional traffic demands and improve mobility.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
JIM MINER REALTOR®. CRITERIA USED  3-7 ACRES  43,560 SQ FT IN ACRE  GREAT LOCATION  CHEAP PRICE  MEETS CITY ORDINANCE  ANY ZONE  GENERALLY ON A.
Location Hammock Dunes DRI – Includes: -Hammock Beach -Ocean Hammock
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
Transport.tamu.edu Options for Access Improvements Near MSC Wednesday, December 7, 2011.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Capital Improvement Projects 2014 A Snapshot of Current Construction Activity in the City of Irvine.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Serra Mesa Planning Group. What and Why of Redistricting Drawing of district boundaries for elected office Happens every 10 years at all levels of government.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
2 Why fortify? 30-year-old pavement was cracking and crumbling because of a chemical reaction happening underneath the road, triggered by a substance.
INTERSTATE DRIVING Information Processing: Complex Risk Environments
TRAFFIC SIGN BY kru Somjai Triratsuk Warning Signs School Signs Slipper Road Turn left Curve Right.
Trip Generation for Street and Highways Lecture 14 CE 4720 Norman Garrick.
The Roads Ahead Leroy D. Alloway, Director Community Development.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
San Juan Greenway WJI PRODUCTIONS Cycling and Walking Centennial Trails Project.
HIKE ASPEN FALLS Guide to hiking and walking paths in and around our city.
BROKENHEAD OJIBWAY NATION COMMUNITY MEETING June 23, :00 PM – 7:00 PM Information on the PTH 59N and PTH 101 Interchange.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
The Platinum Triangle Anaheim, Ca Michael Sahimi – Kevin MacDougall – Katy Escobar.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
Community Development Department Construction Phase.
RIVERSIDE ELEMENTARY SCHOOL CalTrans Overpass MARCH 12, SALLY SWANSON ARCHITECTS, INC. West Contra Costa Unified School District.
Ch 11 Driving on Expressways Characteristics of Expressway Driving.
The Main Street Bike Lane Project LADOT Bike Program.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Slides for Nov 1 Planning Board Meeting. The Arts Campus Can be built without touching the Dinky.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
AND TRAFFIC SETTINGS ENVIRONMENTS. RESIDENTIAL STREETS FACTORS???? DRIVING PATTERNS SPEED PEDESTRIANS PARKED CARS TRAFFIC LAWS.
Maryland at Edgerton Channelization  Maryland Avenue – Ramsey County Roadway  ADT 20,000 plus  Maryland/Edgerton Intersection in top 10 Citywide for.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Designing for Pedestrian Safety – Road Diets 9-1 ROAD DIETS.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
Properties of Addition and Multiplication. Distributive Property A(B + C) = AB + BC 4(3 + 5) = 4x3 + 4x5.
EMERGENCY MANAGEMENT WARRANDYTE COMMUNITY FORUM, 12 NOV 2015 TRAFFIC MODELLING.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Interstate 15 North 8/17/2015 Update
Jeremy Area Transportation Plan
Serra mesa community plan amendment roadway connection project
District 3 Complete Streets Projects
Project Overview Multimodal improvements to 22.5 miles of I-66
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
US 75 Improvement Study Thanks for attending the Texas Department of Transportation’s first Grayson County open house for the US 75 Project from FM 1417.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Design Criteria CTC 440.
Presentation transcript:

WHAT DOES THE PROPOSED SERRA MESA COMMUNITY PLAN AMENDMENT Mean For You?

IF THE SM COMMUNITY PLAN IS CHANGED:  A line will be added to a map in our Community Plan  Sudberry Properties will build a four-lane road connecting Civita (Quarry Falls) to Phyllis Place

IF THE SM COMMUNITY PLAN IS NOT CHANGED:  Sudberry Properties will build a bicycle and pedestrian path connecting Civita (Quarry Falls) to Serra Mesa at Phyllis Place  Sudberry Properties will widen Mission Center Road at the top of the hill  Sudberry Properties will widen and improve the I-8/Mission Center Road interchange

WHAT ABOUT EMERGENCY SERVICES?  No matter what, there will be an emergency-only connection at Kaplan Drive  Fire Chief Mainar has said driving to Kaplan Drive would only “add a few more seconds of response time”

WHAT ABOUT THE PARK?  No matter what, there will be a park built in the 6 acres along Phyllis Place, connecting to the 23 acres of open space in Civita.  If the SM Community Plan is amended, that park will be divided by a 4 lane road with 25,800 ADTs.

WHAT WILL CIVITA TRAFFIC BE LIKE WITHOUT A NEW ROAD?  6.9% of the traffic from Civita will come up Mission Center Rd to Serra Mesa  The other 93% of the Civita traffic will stay down in Mission Valley

Trip Distribution at Build-Out (52,332 ADT): No Road

WHAT WILL CIVITA TRAFFIC BE LIKE WITH A NEW ROAD?  33% of the traffic from Civita will come up Franklin Ridge Rd to Serra Mesa  Increased traffic northbound on Murray Ridge Road  Increased traffic on Raejean  Increased traffic at 805 ramps  Increased congestion on the freeway

WHAT WILL CIVITA TRAFFIC BE LIKE WITH A NEW ROAD?  33% of the traffic from Civita will come to Serra Mesa  Mission Center Road  5,000 fewer ATDs  The lane that would be added in the other scenario can handle that traffic, so conditions on Mission Center are actually better without the new road  Murray Ridge/805 Bridge  15,700 more ADTs  Twice as many cars/hour at the freeway ramp  Murray Ridge between 805 and Mission Center Rd  no noticeable change

Trip Distribution at Build-Out (52,332 ADT): With Road