UNFCCC Secretariat Latest updates on PoAs rules including multicounty PoAs Karen Ortega Regional Workshop (31 August - 2 September), Bogota, Colombia.

Slides:



Advertisements
Similar presentations
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Advertisements

UNFCCC Complexities in demonstration of additionality of a POA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Additionality in the context of PoA –Summary of Task Group Issues identified in the plenary a)Additionality at the PoA level How to construct sufficient.
PoA Challenges & Opportunities
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
Regional Distribution
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
PoA AFTER Cancun - READY TO TAKE OFF NOW
GUIDELINES ON: (A) COMMON PRACTICE (B) ADDITIONALITY OF FIRST-OF-ITS KIND SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.
Validation and verification report templates
Wrap-up session IV Module 4.1, Extension of simplified modalities for demonstration of additionality Mr. Peer Stiansen, CDM EB member 1 st Sustainable.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
UNFCCC secretariat Overview of the PoA and business models Training-Workshop on the “Uganda Municipal Waste Compost Programme” 21st -24th Oct 2013, Mukono.
UNFCCC Secretariat SDM programme Wrap-up Session: Key Issues Identified and Proposals discussed Practitioners’ workshop on Standardized baselines Bonn,
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROCESS TO P REPARE AND I NCLUDE CPA S UNDER A CDM P O A.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
Programmatic CDM Joergen Fenhann DFC 9. August 2011.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
Beijing Chaoyang District Liangmaqiao Rd. 42, Guangming Apartment 0307(B) P : F : 北京市朝阳区亮马桥路 42 号光明饭店 0307.
Reporting on SD co-benefits using the new CDFM SD Tool and opportunities for monitoring to enhance the profile of CDM projects and CER price: what the.
A.K.Perumal, CDM – Methodology Panel,SSC-WG, RIT and AT member 25 th March 2012.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
UNFCCC Roles and structure of Designated National Authorities (DNAs) Fabiana Rodrigues, UNFCCC secretariat Regional Workshop - Latin America and the Caribbean.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Presentation title Session 2: The CDM Project Cycle Post-registration changes Renewal of crediting period Training-Workshop to support the “Uganda Municipal.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
CFL Lighting Scheme – Bachat Lamp Yojana CDM Requirements.
Module 1.2 – CDM Project Cycle Calibration Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs) A. Ricardo J. Esparta.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
AIT Asian Regional Workshop on “Capacity Development for CDM” 19 – 21 st October 2005 Major Highlights of EB Decisions on Developments of CDM Projects.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Update on methodological work within UNFCCC and future outlook Workshop on CDM Methodologies and Technical Issues 3 rd December, 2005 Montreal, Canada.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
UNFCCC secretariat From CDM to NAMAs – Synergies between CDM and NAMAs Perumal Arumugam Latin American Carbon Forum, Bogota (03 – 05 Sep 2014)
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Presented by: Mohammad Sadegh Ahadi
Q&A sessions at UNFCCC SB26
Small-Scale Projects Under JI
Presentation transcript:

UNFCCC Secretariat Latest updates on PoAs rules including multicounty PoAs Karen Ortega Regional Workshop (31 August - 2 September), Bogota, Colombia

2 Update on PoA pipeline Multiple Methodologies/technologies in a PoA Consideration of Cross effect Sampling Post registration change Start date and crediting period Multiple country PoAs Further work Outline

3 Updates on Programme of activities (PoAs) CME CER Buyer CP A $$$ CME – coordinating or managing entity CPA – CDM programme activity Unlimited number of similar component project activities (CPA) can be administered under a single programme umbrella. Scale up the CDM No specified size limits CPA can be time bound (e.g. activities commencing in a certain year). Reduce transaction costs

Updates on POAs 4 Source: UNEP DTU/CDM pipeline

Updates on POAs 5 Source : UNEP DTU/CDM pipeline

Use pre approved combinations For other combinations account for cross effects;  EB68 “Guidelines for consideration of interactive measures for application of multiple CDM methodologies for PoAs”  For LSC combination, request clarification/revision to MP  Min one specific case CPA at time of the publication of the PoA-DD for GSC corresponding to any of the generinc CPA-DDs shall be provided. Specific CPA for other technologies (remaining generic CPA-DDs) can be added at the time of registration of the PoA or after the registration of the PoA. In the latter case, the specific-case CPA-DD shall be provided for approval by the Board in accordance with the post-registration change process. Requirements for Multiple Methodologies/technologies in a PoA

SSC Pre approved combinations  Combinations of approved methodologies by the Board are contained in the SSC General Guidelines: AMS-III.R + AMS-I.C; AMS-III.D + AMS-I.C + AMS-I.F; and AMS-I.C + AMS-I.F. Any one of the Type III methane generating methodologies, with any one of the Type I methane utilizing methodologies oi.e. AMS-III.H, AMS-III.D, AMS-III.F and AMS-III.G, with AMS- I.A, AMS-I.C, AMS-I.D and AMS-I.F. A generic CPA-DD has been prepared for each technology/measure, each methodology and each combination thereof, or that technologies/measures have been combined in one generic CPA-DD subject to the provisions in the PS.

Cross effects EE measures in a building Activity 1: efficient lighting bulbs Activity 2: efficient space heating/cooling Cross effect: Activity 1 will lead to increased/reduced fuel consumption for the same level of space heating/cooling.  Cross effects examples

9 Sampling Requirements 1)Use the following confidence/precision requirements: 90/10 for small-scale; 95/10 for large-scale; Unless specified in the applicable methodology; 2)For precision (i.e. figure of ±10%), use relative percentage terms when parameter of interest is both a proportion and a mean value;  ±10% when average usage of a CFL is 3.5 hours implies that the population parameter is to be within ± 0.35hours.  ±10% when one expects 50% of cook stoves still to be operational means that population value is to be within ± 5%.

10 Sampling for a group of CPAs Sampling allowed for a group of CPAs under a small scale PoA; populations of all CPAs in the group are combined for a single survey PoA CPA 1 CPA 2 CPA 3 CPA 4 CPA 5 Group of CPAs

11 Validation and Verification of Sampling plans of Project Activities and PoAs Criteria for Validation of Sampling Plans Adequate to achieve confidence/precision requirements? Reproduce of sample size calculation; Samples are randomly selected and are representative? DOEs may apply sampling when PPs have not applied sampling provided predefined level of assurance is met.

12 Sampling for DOE validation/verification Producers = 5% Consumers = 5% Producers = 10% Consumers = 10% Producers = 10% Consumers = 20% AQLUQL Sample Size (n) Accept. number (c) Sample Size (n) Accept. number (c) Sample Size (n) Accept. number (c) 1%10% %15% %20% %10% %15% %20% New

Post registration changes With regard to the permanent changes to a registered PoA, only the following changes shall be allowed: a)Changes to programme boundary to expand geographical coverage or to include additional host Parties; b)The following revisions to the eligibility: (i) If the version of methodologies applied by the PoA is revised or replaced subsequent to being placed on hold; (ii) If the revision of the eligibility criteria of a registered PoA is initiated by the Board at any time during the lifetime of the PoA if an issue related to environmental integrity is identified; (iii) If the use of positive lists is introduced based on the “Guidelines on the demonstration of additionality of small-scale project activities” or the provisions of “Guidelines on demonstrating additionality of microscale project activities”;

Post registration changes c) If a PoA includes more than one generic CPA-DD, addition of specific case CPA-DDs corresponding to generic CPA-DDs for which a specific case CPA-DD has not been submitted at the time of request for registration of the PoA; (d) Removal of methodologies and/or standardized baselines from the registered PoA; (e) Addition or change of technologies/measures with or without addition or change of applied methodologies4 in the registered PoA-DD as follows: (i) Changes that allow a shift to more efficient less GHG-intensive or at least equivalent technologies/measures;5 (ii) Changes that introduce complementary measures/technologies involving mass and/or energy transfer to/from the originally registered technology/measure (e.g. addition or change of Type I methodologies in a registered PoA primarily applying Type III methodologies) 1 1 the scope of changes shall not cover adding technologies/measures and methodologies that are not related to the technologies and methodologies included in the originally registered PoA.

15 Start date and crediting period CPA2 CPA3 CPA4 CPA5 CPA6 PoA lifetime = max. 28 years Start date of PoA (Date of registration at earliest) End date of PoA 7yrs Renewal CP CPAs CPA1 ● ● ● ● ● ● PoA renewal ● CPA renewal Fixed CP CPAs

16 Batched issuance Monitoring Period i MR for Batch A MR MR for Batch B MR Iss Req for Batch A Iss Req for Batch A Iss Req for Batch B Iss Req for Batch B Monitoring Period i+1 Mutually exclusive MR for Batch A MR MR for Batch B MR Iss Req for Batch A Iss Req for Batch A Iss Req for Batch B Iss Req for Batch B Mutually exclusive MR for Batch A MR EB78 EB75 Iss Req for Batch A Iss Req for Batch A PCP186 (b): Iss Req for the subsequent MP shall not be submitted before the CERs were issued for both Iss Req for the specified monitoring period One issuance request covering all CPAs Prior to EB75

17 MP 63 recommended to exclude the following list of methodologies from using simplified option approved in EB78 (para 31) Methodologies containing specific provisions within the methodology (i.e., under the section “Project activity under a programme of activities”) are also excluded. Where multiple methodologies are used in a PoA which includes at least one methodology listed in the table, the PoA is not eligible for using the flexible option Large scale methodologies AM0036Fuel switch from fossil fuels to biomass residues in heat generation equipment AM0057Avoided emissions from biomass wastes through use as feed stock in pulp and paper, cardboard, fibreboard or bio-oil production AM0061Methodology for rehabilitation and/or energy efficiency improvement in existing power plants AM0094Distribution of biomass based stove and/or heater for household or institutional use AM0108Interconnection between electricity systems for energy exchange ACM0005Increasing the blend in cement production ACM0006Consolidated methodology for electricity and heat generation from biomass ACM0017Production of biodiesel for use as fuel ACM0018Electricity generation from biomass residues in power-only plants ACM0020Co-firing of biomass residues for heat generation and/or electricity generation in grid connected power plants ACM0022Alternative waste treatment processes Batched issuance

18 A PoA can be registered with more than one host Party to begin with or a PoA can initially be registered with one host Party but, during its operation, can be expanded to additional host Parties. a)In the former case, the CME shall: Obtain a LoA from the DNA of each Party involved in the PoA prior to registration; Provide only one specific-case CPA-DD for each generic CPA-DD. b)In the latter case (expanded through post-registration change process), the CME shall: Obtain LoAs from the DNAs of the additional host Parties; Provide a revised PoA-DD and a revised generic CPA-DD. Provisions for multi-country PoAs

Of the 247 registered PoAs, 24 are multi-country PoAs at the registration stage. In addition, more than 26 registered PoAs have indicated the intention to expand the boundary (adding more host Parties) in the future.  e.g. Ref: 9626 (Rwanda) will be expanded to Eastern African countries. 19 Provisions for multi-country PoAs

20 In a multi-country PoA, if technology/measure is the same, it may be interpreted that only one specific-case CPA-DD is required for registering the PoA or for expanding the boundary; DNAs have generally required at least one specific-case CPA-DD from their country. DNAs suggested that it is desirable to amend the PoA rules to require at least one specific-case CPA-DD per host country; a)It would enable a better assessment of sustainable development aspects of the PoA; b)Specific information on inputs from local stakeholders may only be available in a specific-case CPA-DD. CMEs request simplification of requirements by the Board and DNA. Provisions for multi-country PoAs

21 Currently one specific case CPA-DD per technology/measure is required. Geographic boundaries, especially when they span multiple countries, may play a role to render some CPAs unique.  e.g. In a PoA distributing cookstoves or efficient lights, there may be differences among countries regarding infrastructure, population density, cooking habits with impacts on monitoring, project performance and emission reductions Separate specific-case CPA-DDs per country may provide more accurate case specific information. Will not be a new requirement for documentation but may indicate that some specific-case CPA-DDs will be required earlier. Provisions for multi-country PoAs

The Board agreed to require that the CME should provide a specific-case CPA-DD for each host Party during the registration of the PoA or during expansion of the boundary of the PoA to add additional host Parties. 22 Provisions for multi-country PoAs

Ongoing work on PoA regulation Multi country PoA – (request for review) Definition of technology Revision of eligibility criteria by CME (standardizing eligibility criteria) Post registration changes to PoA Multiple specific CPA-DD per generic CPA-DD at registration of PoA Survey requirements to estimate multiple parameters in single survey More best practice examples for sampling Sample Size calculator And more …… 23

UNFCCC Secretariat UNFCCC secretariat, SDM programme THANK YOU! Karen Ortega Technical Officer, RCC Bogota