San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.

Slides:



Advertisements
Similar presentations
I-66 Corridor Improvements Outside the Beltway CTB Briefing
Advertisements

Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
SAN DIEGO I-15 INTEGRATED CORRIDOR MANAGEMENT PROJECT Alex Estrella, SANDAG.
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
CALTRANS’ TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS CTP 2040 PAC 1 Kris Kuhl Assistant Division Chief, Division of Traffic Operations 4/15/2014 CREATING.
Presented by: SAGE KAMIYA, P.E., PTOE
I-15 Managed Lanes: Building on Success And Lessons Learned I-15 Managed Lanes: Building on Success And Lessons Learned.
Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar July Audio: , passcode
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Caltrans IRIS – T3 Webinar T3 Webinars are brought to you by the ITS Professional Capacity Building Program (ITS PCB) at the U.S. Department of Transportation’s.
Advanced Traveler Information System ATIS. What are Intelligent Transportation Systems (ITS) ? The application of advanced sensor, computer, electronics,
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
TSP Must Fit Within An Overall Agency ITS Plan. Transit Priority Data Needs Vehicle Location –Speed Door & Lift Status –Predictions Passenger Counting.
Maryland’s Coordinated Highways Action Response Team Richard R. Dye, CHART Systems Administrator “Welcome to the World of.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
ICM Minnesota – Interstate 394 Brian Kary, Minnesota Department of Transportation.
Evolving TSP to meet the needs of the ITS community 1.
1 Presented at 2008 North American Paramics User Group Meeting 1 TMC Operator Training Using Microscopic Simulation Lianyu Chu CLR Analytics Inc July 14,
By Syd Bowcott, URS Corp Bayne Smith, URS Corp.  Purpose of this Presentation  Overview of Project Area  Background  Project Goals  Stakeholders.
National VII Architecture – Data Perspective Michael Schagrin ITS Joint Program Office US Department of Transportation TRB 2008 Annual Meeting Session.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
March 27, 2007 – Hill Farms March 28, 2007 – NE Region Wisconsin LCS Lane Closure Planning System LCS Oversight Group Meeting Steven Parker - TOPS Lab.
RCOC’s Real-Time Traffic Web Site Enhancements Ahmad Jawad Road Commission of Oakland County Qingyan (Ken) Yang, Preeti Agarwal, Jeff Manring Iteris Inc.
Integrated Corridor Management (ICM)
June 2005 Intelligent Transportation Systems 101 June 21, 2005.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
Montgomery County Maryland I-270 Integrated Corridor Management Project Tom Jacobs, University of Maryland Center for Advanced Transportation Technology.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Dixie Regional ITS Architecture Stakeholder Meeting #2 June 15, 2006.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
1 California’s Unique Transportation Challenges … and ITS Solutions ITS America Meeting June 4, 2007 Lawrence Jesse Glazer & Frank Cechini FHWA – CA Division.
Minnesota I-394 ICM Corridor. What is Integrated Corridor Management? Independent Network of Transportation Systems –Freeways, including managed lanes.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
Data Sharing Partnerships May 15, There are known knowns. These are things we know that we know. There are known unknowns. That is to say, there.
I-15 Integrated Corridor Management Project I-15 Integrated Corridor Management Project MICM Workshop December 2007.
1 Regional Integration Across Jurisdictions and Modes: San Diego IMTMS ITS America 2007 Annual Meeting Palm Springs, CA Session 9 - June 4, 2007.
1 Joan Sollenberger, Chief Office of Strategic Development Division of Traffic Operations, CA Dept. of Transportation (Caltrans)
Moving People Overview. Key Themes Road Hierarchy/Classification Strategic freight corridors Strategic public transport corridors Review and implementation.
Enhanced 511: Beyond the Basics Jerry Woods Florida DOT – District 5 iFlorida - Automated Message Generation Based on Travel Times.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Intelligent Transportation Systems (ITS) in Kentucky ITS Mid- America Fall 2005.
Roles of TMCs in Incident Management on Managed Lanes INTRODUCTION AND OVERVIEW MICHAEL TANTILLO VHB.
1 Arterial AMS Deployment Case Study By Joseph Brahm (847)
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Robert Brydia Project Lead, I-35 Traveler Information During Construction Texas A&M Transportation Institute WORK ZONES & LARGE TRUCKS THE CENTRAL TEXAS.
1 And the nominees are Project: Illinois Statewide ITS Strategic Plan and Architecture Project Lead: Illinois DOT Project Team:
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
IntegratedCorridorManagement 1 Integrated Corridor Management Overview and Activities Jeff Lindley Director, Office of Transportation Management FHWA February.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Integrated Corridor Management (ICM) Brian P. Cronin, P.E.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
ITS Virginia Annual Conference April 20, 2012 Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other product and company.
FDOT D5 – Integrated Corridor Management Program
Project Overview – Phase 1
MODULE 5: TSMO to Improve Reliability
MODULE 2: TSMO Strategies
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
Welcome to the New Smart City by TrafficCast…
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
MODULE 2: TSMO Strategies
MODULE 5: TSMO to Improve Reliability
Module 2: TSMO Strategies
Presentation transcript:

San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014

2 OUTLINE 1.Background –Project Overview and Vision 2.ICM System 3.What’s happening now

3 Utilize technology and partnershipsUtilize technology and partnerships Manage corridor as systemManage corridor as system Provide travelers decision quality informationProvide travelers decision quality information Maximize corridor capacityMaximize corridor capacity 3 Arterial Signals Systems Freeway Systems Bus Systems Rail Systems USDOT ICM Vision Background

4 USDOT ICM Selected Eight Pilot Sites

5 Sabre Springs/Peñ̃asquitos Transit Center I-15 Express Lanes SR 56/Ted Williams Parkway N Direct Access Ramp (DAR) I-15 Main Lanes Express Lanes DAR BRT Stations Arterial Network Main Lanes ICM is about management of a corridor. Management implies more than monitoring. Management implies planning for, and responding to, what is happening across all networks Why ICM: Next Natural Step in TSM

6 I-15 ICM Vision Pro-actively Manage Congestion Provide Choices Maximize System Capacity Improve Coordination/ Interoperability

7 ICMS Context Diagram RAMS Signal timing plans Arterial Congestion Intersection status System alarms Local traffic advisories Regional Arterial Mgmt System RTMS Service change request Bus AVL Schedule Adherence Selected Stop/Route Data Panic alarms Regional Transit Mgmt System FMS CMS plans ELCS Request Freeway Congestion Freeway Incidents Travel Times Planned Events CCTV Imagery CMS Status Freeway Mgmt System Ramp Meter Information System REMS Usage Statistics Incident Detection Incident Details Intelligent Virtual Corridor TMC (User Screen) XML Data (3 rd Party Applications) Alert messages SPS Free spaces Area ID CPS RMIS LCS Meter Timing Plans Congestion Pricing System Toll Travel Times Events Lane Closure System Smart Parking System Regional Event Mgmt System CHP Transit Express Lanes Congestion Pricing Arterial Construction ATTS Arterial Travel Time System Arterial travel times Weather NWS Weather/NEXRAD NPS RTSS Network Prediction System Real-Time Simulation System Real-Time Data Predictions Evaluation MOE Real-Time Data Construction/Maint Status Metering Status Current Pricing/VTS signs EL Congestion One-way IMTMS interface Two-way IMTMS interface DSS control interface = New or Upgraded System 7 RTMS Service change request Bus AVL Schedule Adherence Selected Stop/Route Data Panic alarms Regional Transit Mgmt System RAMS Signal timing plans Arterial Congestion Intersection status System alarms Local traffic advisories Regional Arterial Mgmt System FMS CMS plans ELCS Request Freeway Congestion Freeway Incidents Travel Times Planned Events CCTV Imagery CMS Status Freeway Mgmt System

8 En-Route Traveler Information Pre-Trip Traveler Information Corridor Ramp Metering Signal Coordination on Arterials and Ramp Meters Enhanced Transit Network Information Pro-Active Corridor Congestion Management during recurring and incidents 8 DSS Operational Strategies Employed on I-15 with ICM

9 What’s Happening Now - DSS – ICM Response Plan Example

10 – What’s Happening Now – –Established Weekly Operational Review Meetings –Over 400 Response Plans Since April –Early May – Set to System Automation Approval –Operational Corridor Threshold Initiated 18% then to 8% (May 21 st ) –Released 511 – ICM App (May 9 th )

11 Getting to Integrated Operations Assets  Network and Routes  Systems and Capabilities  Availability Response Plans  Flexibility of Postures  Action Plans  Interagency Coordination 11

12 Posture Availability

13 Enhancements to serve as the corridor performance management element of DSS Future Existing Off-Line Modeling/Performance Analysis Predict Propose Evaluate Control Monitor Micro-simulation in real- time to predict and evaluate the response plans Business Rules to propose and monitor Workflow engines to control Decision Support System

14 Enhancements to serve as the corridor performance management element of DSS Future Existing Off-Line Modeling/Performance AnalysisPrediction Asset Availability Threshold Response Plan Evaluation Decision Support System System Supply/Demand –Arterials –Freeway –Express Lanes –Bus System Operations –Signals –Ramps –DMS –Barrier –Toll –511

15 What’s Happening Now - DSS – ICM Response Plan Example

16 16 Corridor Parameter ‘Tabs’ Regularly “Tweak” Corridor Score, Signal Response, Congestion Event Finder, Congestion Thresholds Occasionally Modify Global, Response Plan Expiration Timers, Asset Finder Not anticipated to change (rare) Strategy Matrix, Sim Q, Transit, Ramp Meter Simulation Hierarchy, Express Lanes Response Require Agency Oversight Asset Availability ICMS Corridor Configuration Tuning the System

Mobile Application - Release 17