Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Technology Transfer in the CDM DUAN Maosheng Tsinghua University Linking Climate Mitigation Policy and Modeling in China Workshop February 18, 2006 Beijing.
Projections of GHG emissions and effects of policies and measures in the waste sector in the United Kingdom Presented by Robert G Gregory.
SSC-NM0053 Determination of Greenhouse Gas Emissions Reductions Based on Whole- Building Simulation of Building Mitigation Efforts Using eQUEST/DOE-2.2.
T HE W ORLD B ANK C ARBON F INANCE U NIT I MPROVING SMALL SCALE TRANSPORTATION METHODOLOGIES : L ESSONS FROM E GYPTIAN VEHICLE SCRAPPING P O A. P RESENTATION.
CDM METHODOLOGIES IMPROVEMENT 7 th CDM Joint Coordination Workshop th March 2011, Bonn, Germany Anne-Sophie Zirah - March 2011.
Producing energy does not have to threaten the environment. In fact, its very production can reap major environmental benefits. The United States biomass.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
CDM Baseline, additionality, leakage and monitoring plan Executive Training on the CDM, Jakarta
PDD Preparation Cairo, June 14-15, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXVega Bahia Landfill Project Design Document.
A practical overview from planning to practice on the destruction of methane generated from manure in piggeries. Source: Clean Energy Regulator (CER) July.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Florida Department of Environmental Protection Offset Protocols and Florida’s Greenhouse Gas Cap-and-Trade Program Kelly Stevens Meteorologist Division.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
FIRST CAPACITY BUILDING WORKSHOP ON CLEAN DEVELOPMENT MECHANISM (CDM) UNDER CD4CDM INITIATIVE Date: 8-9 April, 2008 Venue: LGED Bhaban, Dhaka Presented.
The Future of CDM Promote energy saving and renewable energy in developing countries.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Djerba Carbon Exhibition Djerba, September 22-24, 2004 Onyx Gas Capture and Flaring ProjectOnyx Gas Capture and Flaring Project Alexandria, Egypt Amr Abdel-Aziz,
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Opportunities and Constraints on Possible Options for Transport Sector CDM Projects – Brazilian Case Studies Suzana Kahn Ribeiro Importance of Transport.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 Capacity Development for Policymakers,
Examples on how the additionality is addressed in the three Projects approved by the National CDM Council in Morocco (DNA) Important Issues to address.
Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
Relationship between the EU ETS and the Kyoto Protocol Flexible Mechanisms, from the Perspective of Bioenergy and C Sequestration Relationship between.
Gas Re-injection as CDM: CCS or not? Paul ZAKKOUR ERM Energy & Climate Change.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
Energy Forum Compensation arrangements for indirect EU ETS cost effects Presented by Vianney Schyns Brussels 9 June
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
Additionality and Project Cycle Tunis, August 27-29, 2004 TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISOE / APEXAdditionality in NovaGerar.
Capacity Development for CDM Project Presentation of Selected PDD Methane capture and combustion from swine treatment for Peralilo By Kwaku Wiafe Senior.
1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development.
Baseline Cairo, March 31 & April 1, 2004 TIMS/EEAA CD4CDM- Second National Workshop (Phase II) UNEP RISO / APEXPotential CDM Project for a Landfill in.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
AIT Asian Regional Workshop on “Capacity Development for CDM” 19 – 21 st October 2005 Major Highlights of EB Decisions on Developments of CDM Projects.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
Non-CO 2 Greenhouse Gas Offset Projects: Basic Considerations Karl H. Schultz Climate Mitigation Works International LLC Panel Three: Design Issues RGGI.
Regional Greenhouse Gas Initiative RGGI John Marschilok, P.E. Environmental Engineer Department New York State Department of Environmental Conservation.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Update on methodological work within UNFCCC and future outlook Workshop on CDM Methodologies and Technical Issues 3 rd December, 2005 Montreal, Canada.
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
El Gallo Hydroelectricity Project PDD Analysis
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Alain David, P.Eng. National Office of Pollution Prevention Environment.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology 1 of the 1 st 2 methodologies recommended for approval by the Meth Panel, July 2003.
Presentation to RGGI Stakeholder Group September 21, 2005.
Tatsushi HEMMI Institute for Global Environmental Strategies COP 9 Decisions related to CDM in forestry sector – An update on implications for Asia IGES-URC.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
0 BARRIERS TO CDM PROJECT FINANCING Presentation to CDM Financial Mechanism Training Course 18 September 2003 Clean Energy Finance Committee.
Accessing Carbon Finance Workshop on Landfill Gas Development and the CDM Denpasar, Indonesia. September 5-7, Sn. Environmental Specialist. Lasse.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Salvador Da Bahia Landfill Gas Project: Baseline Methodology
CDM Methods and project design: Baselines
Presentation transcript:

Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism March 2004, Siem Reap, Cambodia

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 1 Institute for Global Environmental Strategies Outline of the Presentation 1. Overview of New Baseline Methodologies 2. Overview of Proposed CDM Projects 3. Concept of GHG reductions in Waste Management Project 4. Calculation of Emission Reductions 5. Approved Baseline Methodology (AM0003) 6. Approved Baseline Methodology (AM0002)

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 2 Institute for Global Environmental Strategies Number of submitted new baseline methodologies 49 Considered by the Meth Panel 33 Not considered yet 16 Recommended for approval 12 Recommended for revision or Other conclusion 21 36% 1. Overview of New Baseline Methodologies

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 3 Institute for Global Environmental Strategies Number of projects which submitted new baseline methodologies Number of projects whose methodology are approved 2. Overview of Proposed CDM Projects

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 4 Institute for Global Environmental Strategies Number of projects which submitted new baseline methodologies Overview of Proposed CDM Projects 12 Number of projects whose methodology are approved

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 5 Institute for Global Environmental Strategies Fuel SwitchingHydro Power Generation Energy Efficiency Improvement Biomass Utilization Waste Management 0 50, , , , , , Overview of Proposed CDM Projects Average of Annual ERs by Project Type (among approved methodologies excluding HFC decomposition & Oil Field Associated Gas Recovery)

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 6 Institute for Global Environmental Strategies 3. Concept of GHG reductions in Waste Mgt Project Landfill Gas (methane) GWP=21 Methane Capture Methane Flaring CO 2 GWP=1 Baseline Scenario (without CDM) Project Scenario (with CDM)

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 7 Institute for Global Environmental Strategies 4. Calculation of Emission Reductions Baseline Scenario (without CDM) Project Scenario (with CDM) GHG emissions = 100 t-CH 4 /year = [100 x 21 (GWP) ] t-CO 2 /year = 2100 t-CO 2 /year 1 t-CH t-CO 2 GHG emissions = 2.75 x 100 t-CO 2 /year = 275 t-CO 2 /year Emission Reductions = 2100 – 275 = 1825 t-CO 2 /year After Flared

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 8 Institute for Global Environmental Strategies 4. Calculation of Emission Reductions To date Proposed revision by the CDM Meth Panel (9 th meeting) The source of the methane and therefore CO 2 emissions is the organic fraction in deposited waste, which forms part of the natural organic CO 2 cycle Given that after combustion each tonne of CH 4 produces 2.75 tonne of CO 2, these should be discounted from the total value of CH 4 reduced by the project Important Change ! CO 2 emissions from landfill gas (methane) flaring = 0 t-CO 2 CO 2 emissions from landfill gas (methane) flaring will be counted

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 9 Institute for Global Environmental Strategies 4. Calculation of Emission Reductions To date Important Change ! Baseline emissions = 100 t-CH 4 /year = 2100 t-CO 2 /year Proposed revision by the CDM Meth Panel (9 th meeting) Emissions from the Pjt =0 t-CO 2 /year Emission Reductions = 2100 t-CO 2 Baseline emissions = 100 t-CH 4 /year = 2100 t-CO 2 /year Emissions from the Pjt =275 t-CO 2 /year Emission Reductions = 1825 t-CO 2

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 10 Institute for Global Environmental Strategies 5. Approved Baseline Methodology (AM0003) Methane Capture Methane Flaring CO 2 Applicability of this Methodology or Electricity Generation No emissions reductions are clamed for displacing or avoiding electricity by other sources

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 11 Institute for Global Environmental Strategies 5. Approved Baseline Methodology (AM0003) How to Determine Additionality Methane Capture BAU Scenario (without CDM) Project Scenario (with CDM) No Change (1) Justify there are only the project and BAU scenarios (2) Calculate a conservative IRR, except revenue from sale of CERs (3) If the project IRR is clearly and significantly lower than the conservatively acceptable IRR, the project is additional e.g. Gov bond rates, commercial lending rates

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 12 Institute for Global Environmental Strategies 5. Approved Baseline Methodology (AM0003) Methane Capture CO 2 Baseline Emissions Baseline Scenario (without CDM) Project Scenario (with CDM) methan e In the absence of the project activity, the amount of captured and destroyed methane would be released to the atmosphere. Thus, this is the baseline emissions (basically). For the PDD, baseline emissions will be estimated ex ante by using the Model. Once the project activity is operational, baseline emissions will be determined ex post by metering actual quantity.

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 13 Institute for Global Environmental Strategies 5. Approved Baseline Methodology (AM0003) Baseline Emissions Effectiveness Adjustment Factor (EAF) Time Baseline Emissions Emissions from Project Activity GHG emissions Emission Reductions Regulation or contractual requirement might impose methane capture Discounted Emission Reductions

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 14 Institute for Global Environmental Strategies 5. Approved Baseline Methodology (AM0003) Baseline Emissions Effectiveness Adjustment Factor (EAF) Taking into account the effectiveness of the gas collection systems that would be imposed by regulatory or contractual requirements, the final Emission Reductions will be discounted by EAF. The default value for the EAF is 20%. Deviations from the default value can be proposed and justified based on project-specific considerations The EAF shall be revised at the start of each new crediting period.

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 15 Institute for Global Environmental Strategies 5. Approved Baseline Methodology (AM0003) How to calculate Emissions Reductions Monitor the amount of landfill gas collected by a continuous flow meter Monitor the percentage of methane in landfill gas by a continuous analyzer Monitor the amount of electricity generated Calculate the amount of methane destroyed : 100 t-CH 4 Baseline emissions = 100 t-CH 4 = 2100 t-CO 2 Emissions from the Pjt =275 t-CO 2 Emissions Reductions = 1825 t-CO 2 x (1-EAF (20%) ) = 1825 t-CO 2 x 0.8 = 1460 t-CO 2

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 16 Institute for Global Environmental Strategies 5. Approved Baseline Methodology (AM0003) Leakage Emissions resulting from generating the electricity used to pump the landfill gas If sufficient electricity is generated from recovered landfill gas, there is no leakage If purchased electricity is used, the associated emissions should be calculated The resulting emissions should be deducted from Emission Reductions

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 17 Institute for Global Environmental Strategies 6. Approved Baseline Methodology (AM0002) Methane Capture Methane Flaring Applicability of this Methodology The project activity is to collect and flare methane greater than the amount determined by the contractual requirement There exists a contractual agreement which requires the amount of methane flaring The contract was awarded through a competitive bidding process The amount of landfill gas to be flared reflects performance among the top 20% in the previous five years No generation of electricity using captured landfill gas occurs or is planned

Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism, March 2004, Siem Reap, Cambodia 18 Institute for Global Environmental Strategies 5. Approved Baseline Methodology (AM0002) Baseline Emissions Emissions from Project Activity Methane emissions Emission Reductions The quantity of methane which should be captured by requirement of the contractual agreement Methane Emissions from landfill gas The quantity of methane which are captured by the CDM project